Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| IGF::OT::IGF REPLACE FIRE ALARM SYSTEM AT THE FEDERAL CORRECTIONAL COMPLEX (LOW) LOCATED IN YAZOO CITY, MISSISSIPPI. | LIGHTSEY RESTORATIONS | $630,804 | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | — | 238210Electrical Contractors and Other Wiring Installation Contractors | Z2FFREPAIR OR ALTERATION OF PENAL FACILITIES | Sep 21, 2016 | Sep 21, 2016 | Apr 30, 2017 | ||
| IGF::OT::IGF G:EPREF, REPLACE LIGHTS/FIXTURES INSIDE MAMMOTH CAVE (DESIGN-BUILD PROJECT) | LIGHTSEY RESTORATIONS | $641,945 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 238210Electrical Contractors and Other Wiring Installation Contractors | N062INSTALLATION OF EQUIPMENT- LIGHTING FIXTURES AND LAMPS | Sep 14, 2016 | Sep 14, 2016 | Oct 30, 2017 | ||
| IGF::OT::IGF X:NOGRN, CONSTRUCTION, COMPLETE REPAIRS TO CB WASTE WATER PLANT | LIGHTSEY RESTORATIONS | $215,226 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 237110Water and Sewer Line and Related Structures Construction | Z2NDREPAIR OR ALTERATION OF SEWAGE AND WASTE FACILITIES | Sep 7, 2016 | Sep 7, 2016 | May 30, 2017 | ||
| IGF::OT::IGF REPAIR FIRE ALARM SYSTEM AT FCI JESUP. | LIGHTSEY RESTORATIONS | $387,403 | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | — | 236220Commercial and Institutional Building Construction | Z1FFMAINTENANCE OF PENAL FACILITIES | Aug 31, 2016 | Aug 31, 2016 | Feb 14, 2017 | ||
| IGF::OT::IGF, GREEN-ESTAR/FEMP 52-223-15&BIOBA 52.223-2 INCLUDED, MACA 223194 ECHO RIVER ACCESSIBILITY IMPROVEMENTS, MAMMOTH CAVE, EDMONSON COUNTY, KY | LIGHTSEY RESTORATIONS | $1,373,732 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 237990Other Heavy and Civil Engineering Construction | Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES | Aug 29, 2016 | Aug 29, 2016 | Dec 26, 2017 | ||
| IGF::OT::IGF, MOLD ABATEMENT, GUTTER REPLACEMENT AND DRAINAGE REHAB AT BLUFFS COFFEE SHOP AND GIFT SHOP BUILDINGS, HIGHLANDS, BLRI | LIGHTSEY RESTORATIONS | $297,147 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 236220Commercial and Institutional Building Construction | F108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATION | Aug 23, 2016 | Aug 23, 2016 | Dec 31, 2016 | ||
| IGF::OT::IGF REPAIR TORNADO DAMAGE - ADMINISTRATION BUILDING/SITE LIGHTING. | LIGHTSEY RESTORATIONS | $3,603,387 | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | — | 236220Commercial and Institutional Building Construction | Z2FFREPAIR OR ALTERATION OF PENAL FACILITIES | Aug 12, 2016 | Aug 12, 2016 | Jul 31, 2017 | ||
| IGF::OT::IGF, X:NOGRN, PROJECT WORK TO INCLUDE THE TOTAL REMOVAL, DISPOSAL, REPLACEMENT AND INSTALLATION IN THE MUSEUM, REPLACEMENT OF THE FRONT DOORS, MAKE VISITOR CENTER FRONT DESK ADA COMPLIANT AND REPLACE FRONT WINDOWS. | LIGHTSEY RESTORATIONS | $116,485 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 236220Commercial and Institutional Building Construction | Z2JAREPAIR OR ALTERATION OF MUSEUMS AND EXHIBITION BUILDINGS | Aug 10, 2016 | Aug 10, 2016 | Apr 30, 2017 | ||
| IGF::OT::IGF UPGRADE EMERGENCY GENERATOR CONTROLS AT FCI JESUP. | LIGHTSEY RESTORATIONS | $354,180 | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | — | 236220Commercial and Institutional Building Construction | Z1FFMAINTENANCE OF PENAL FACILITIES | May 20, 2016 | May 20, 2016 | Sep 30, 2016 | ||
| IGF::OT::IGF "OTHER FUNCTIONS" ONE TIME PAYMENT TO REIMBURSE FOR UTILITY SERVICES AT 434 PINETREE BLVD, THOMASVILLE, GA 31792. | LIGHTSEY RESTORATIONS | $7,651 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 221310Water Supply and Irrigation Systems | S114UTILITIES- WATER | Mar 22, 2016 | Mar 22, 2016 | May 30, 2016 | ||
| IGF::OT::IGF EMERGENCY REPAIRS TO ADMINISTRATION BUILDING AT FCI ALICEVILLE FOLLOWING TORNADO STRIKE. | LIGHTSEY RESTORATIONS | $89,000 | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | — | 236220Commercial and Institutional Building Construction | Z1FFMAINTENANCE OF PENAL FACILITIES | Feb 4, 2016 | Feb 4, 2016 | Mar 4, 2016 | ||
| IGF::OT::IGF X:NOGRN, CONSTRUCTION, REPLACE FIRE PUMP AND CONTROLS | LIGHTSEY RESTORATIONS | $131,495 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 238220Plumbing, Heating, and Air-Conditioning Contractors | J012MAINT/REPAIR/REBUILD OF EQUIPMENT- FIRE CONTROL EQUIPMENT | Dec 21, 2015 | Dec 21, 2015 | Mar 11, 2016 | ||
| IGF::OT::IGF X:NOGRN, MACA CONTROL MOISTURE IN ELEVATOR SHAFT - A SINGLE FIRM-FIXED PRICE CONSTRUCTION CONTRACT (ALTERATION OR REPAIR OF REAL PROPERTY) AWARD FOR BID ALTERNATIVE 2 PVC LINER WITH ROCK PROTECTION AND BID OPTION 1 PAINT ELEVATOR SUPPORT STRUCTURE. | LIGHTSEY RESTORATIONS | $902,581 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 238990All Other Specialty Trade Contractors | Z2LCREPAIR OR ALTERATION OF TUNNELS AND SUBSURFACE STRUCTURES | Sep 14, 2015 | Sep 14, 2015 | Sep 20, 2016 | ||
| IGF::OT::IGF REPLACE HVAC WATER LOOP AT FCI EDGEFIELD | LIGHTSEY RESTORATIONS | $2,350,000 | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | — | 238220Plumbing, Heating, and Air-Conditioning Contractors | Z2FFREPAIR OR ALTERATION OF PENAL FACILITIES | Sep 9, 2015 | Sep 9, 2015 | Apr 26, 2017 | ||
| IGF::OT::IGF MACA 178693 RENOVATE SUNSET LODGE | LIGHTSEY RESTORATIONS | $808,538 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 236220Commercial and Institutional Building Construction | Z2FZREPAIR OR ALTERATION OF OTHER RESIDENTIAL BUILDINGS | Sep 8, 2015 | Sep 8, 2015 | Jul 15, 2016 | ||
| IGF::CL::IGF ELECTRICAL SERVICES FOR FRC IN THOMASVILLE, GA | LIGHTSEY RESTORATIONS | $8,965 | FEDERAL EMERGENCY MANAGEMENT AGENCY | FEDERAL EMERGENCY MANAGEMENT AGENCY | — | 238210Electrical Contractors and Other Wiring Installation Contractors | N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | Sep 4, 2015 | Sep 4, 2015 | Dec 31, 2015 | ||
| IGF::OT::IGF GREEN, ORIG SOW, BIOBA PG.139, FEMP PG.249, ESTAR PG.1421 CONSTRUCTION CONTRACT TO REHABILITATE MAMMOTH CAVE HOTEL AT MAMMOTH CAVE NATIONAL PARK, EDMONSON COUNTY, KY PMIS 178363 AND 204170 | LIGHTSEY RESTORATIONS | $3,502,508 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 236220Commercial and Institutional Building Construction | Y1FZCONSTRUCTION OF OTHER RESIDENTIAL BUILDINGS | Aug 28, 2015 | Aug 28, 2015 | Jun 15, 2016 | ||
| G:ESTAR, DEHUMIDIFEIER FOR ARCHIVES WAREHOUSE, PISGAH, BLRI | LIGHTSEY RESTORATIONS | $7,383 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 238220Plumbing, Heating, and Air-Conditioning Contractors | 4440DRIERS, DEHYDRATORS, AND ANHYDRATORS | Aug 26, 2015 | Aug 26, 2015 | Sep 30, 2015 | ||
| IGF::OT::IGF, NOGRN, INSTALL FIRE SUPPRESSION SYSTEM AT GUCO | LIGHTSEY RESTORATIONS | $106,116 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 238220Plumbing, Heating, and Air-Conditioning Contractors | Z2QAREPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) | Aug 13, 2015 | Aug 13, 2015 | Apr 30, 2016 | ||
| IGF::OT::IGF, WORK ON HISTORIC BUILDINGS TO INCLUDE; RESEALING ROOFS, REPLACE GUTTERS, REPLACING DECKS, AND REPLACING PLUMBING FIXTURES (G:WATER), CARL SANDBURG HOME NHS | LIGHTSEY RESTORATIONS | $155,496 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 238160Roofing Contractors | Z1QAMAINTENANCE OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) | Jun 9, 2015 | Jun 9, 2015 | Oct 9, 2015 | ||
| IGF::OT::IGF REPAIR ELECTRICAL SWITCHGEAR AT FCI TALLADEGA. | LIGHTSEY RESTORATIONS | $200,000 | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | — | 236220Commercial and Institutional Building Construction | Z1FFMAINTENANCE OF PENAL FACILITIES | Apr 24, 2015 | Apr 24, 2015 | Jun 15, 2015 | ||
| IGF::OT::IGF TASK ORDER AGAINST EXISTING IDIQ CONTRACT TO INSTALL GAS LINE AND WATER HEATERS AT FCI MARIANNA. | LIGHTSEY RESTORATIONS | $427,016 | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | — | 236220Commercial and Institutional Building Construction | Z1FFMAINTENANCE OF PENAL FACILITIES | Jan 28, 2015 | Jan 28, 2015 | Aug 15, 2015 | ||
| IGF::OT::IGF HISTORIC DISPLAY BOARDS | LIGHTSEY RESTORATIONS | $456,334 | CENTERS FOR DISEASE CONTROL AND PREVENTION | CENTERS FOR DISEASE CONTROL AND PREVENTION | — | 238990All Other Specialty Trade Contractors | Y1PBCONSTRUCTION OF EXHIBIT DESIGN (NON-BUILDING) | Nov 25, 2014 | Aug 4, 2014 | Mar 31, 2017 | ||
| IGF::CT::IGF THE GOVERNMENT REQUIRES THE CONTRACTOR TO ENGINEER, DEVELOP, AND INSTALL NEW FIRE STAND WATER LINE FROM THE POINT OF DMARCATION BY THE CITY OF THMASVILLE TO THE FEDERAL REGIONAL CENTER (FRC) STAND MAIN CONNECTION. REMOVE AND DISPOSE OF CURRENT INSTALLED WATER FIRE MAIN PIPE;RECLAIM, REPAIR, RESOD, RE-GRADE AND REPAVE AREAS DISTURBED BY THIS PROJECT TO PRE-CONSTRUCTION CONDITIONS; PROVIDE AN ESTIMATED DESIGN BUILD WITH TIMELINE OF CONSTRUCTION COMPLETION WITHIN THE PERIOD OF PERFORMANCE; IDENTIFY AND AVOID ALL EXISTING WATER, COPPER, POWER AND FIBER CONNECTION LINES, PIPES AND ENCUMBRANCES AS TO NOT DAMAGE ANY OTHER FIXED ITEM DURING CONSTRUCTION; ASSUME RESPONSIBILITY FOR GAINING ALL RIGHTS OF WAY, PRIVATE PROPERTY CROSSINGS AND REQUIRED TRAVERSED AREAS RELATED TO CONSTRUCTION; LOCATING AND ABATING ANY ASBESTOS FOUND; DELIVER A POST CONSTRUCTION AS BUILT INCLUSIVE OF ALL NOTATION AND ANOMALIES; MEET WEEKLY WITH FEMA POC TO DISCUSS PROGRESS AND ANY ISSUES WHICH MIGHT ARISE DURING CONSTRUCTION. REPAIR AND RENOVATION, AS FURTHER DEFINED IN THE SCOPE OF WORK TO MEET STANDARDS FOR PUBLIC BUILDINGS SERVICE. PROJECT IS TO REPLACE DEFECTIVE FIRE MAIN TO BUILDING. FEDERAL REGIONAL CENTER (FRC) IN THOMASVILLE WAS BUILT IN THE 1974 AND THE ORIGINAL FIRE STAND LINE IS STILL IN USE. OVER THE LAST FEW YEARS THE WATER PRESSURE HAS BEEN TESTED AND HAS CONSISTENTLY BEEN FALLING. EVENTUALLY IT IS BELIEVED THAT THERE WILL NOT BE ENOUGH PRESSURE TO DISTINGUISH A FIRE IF ONE SHOULD OCCUR IN THE FRC BUILDING. THIS IS A LIFE SAFETY ISSUE. | LIGHTSEY RESTORATIONS | $575,000 | FEDERAL EMERGENCY MANAGEMENT AGENCY | FEDERAL EMERGENCY MANAGEMENT AGENCY | — | 238220Plumbing, Heating, and Air-Conditioning Contractors | N012INSTALLATION OF EQUIPMENT- FIRE CONTROL EQUIPMENT | Sep 29, 2014 | Sep 29, 2014 | Sep 30, 2015 | ||
| IGF::CL::IGF REHAB QUARTERS THREE&FIRE ALARM SYSTEM; SERVICES, NO GREEN. | LIGHTSEY RESTORATIONS | $86,867 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 238990All Other Specialty Trade Contractors | Z2AZREPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | Sep 19, 2014 | Sep 19, 2014 | Aug 25, 2015 |