Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| CONSTRUCT POTABLE WATER LINE ALONG 10TH STREET TO JULIUSTOWN ROAD | PAETZOLD CONSTRUCTION CO INC | $726,296 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237110Water and Sewer Line and Related Structures Construction | Z2NEREPAIR OR ALTERATION OF WATER SUPPLY FACILITIES | Jan 30, 2026 | Jan 30, 2026 | Jan 29, 2027 | ||
| AOA RAMP SUSTAINMENT PHASE 1 | PAETZOLD CONSTRUCTION CO INC | $31,658 | FEDERAL AVIATION ADMINISTRATION | FEDERAL AVIATION ADMINISTRATION | — | 236220Commercial and Institutional Building Construction | Y1AZCONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | Sep 23, 2025 | Sep 23, 2025 | May 1, 2026 | ||
| REPAIR POTABLE WATER SYSTEM GENERAL PURPOSE AIRCRAFT SHOP B1817 | PAETZOLD CONSTRUCTION CO INC | $59,747 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237110Water and Sewer Line and Related Structures Construction | Z2NEREPAIR OR ALTERATION OF WATER SUPPLY FACILITIES | Sep 11, 2025 | Sep 11, 2025 | Mar 10, 2026 | ||
| CONTRACTOR TO PROVID EMERGENCYG REPAIR PARTS WEST 5754 BLDG BOILERS LOCATED AT FCI, FORT DIX. | PAETZOLD CONSTRUCTION CO INC | $20,125 | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS | — | 237110Water and Sewer Line and Related Structures Construction | J045MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | Dec 26, 2024 | Dec 16, 2024 | Dec 26, 2024 | ||
| WATER TANK EXCAVATION PO REQUIRED DUNS: 189821903 FED ID: 223555338 SCOPE OF WORK FOR PAETZOLD CONSTRUCTION: ON THE SOUTHWEST CORNER OF BUILDING 6770 PAETZOLD CONSTRUCTION IS TO EXCAVATE A 12'LONG X 13'WIDE HOLE APPROXIMATELY 57" IN DEPTH. THE EXCAVATION SITE HAS BEEN PROPERLY MARKED AND FLAGGED FOR ALL UTILITIES. THE EXCAVATED DIRT IS TO REMAIN ONSITE NEXT TO THE EXCAVATION UNTIL THE AST SETS THE TWO RAIN WATER RECOVERY TANKS. AT WHICH POINT AST PERSONNEL WILL BACKFILL THE EXCAVATION. | PAETZOLD CONSTRUCTION CO INC | $400 | US COAST GUARD | US COAST GUARD | — | 238910Site Preparation Contractors | AD61 | Jun 23, 2011 | Jun 23, 2011 | Jul 23, 2011 |