Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| N104B3 / PM8 / M. HAWKINS / USNS CODY (T-EPF 14) | LIGHT STRUCTURES AS | $715,251 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 334519Other Measuring and Controlling Device Manufacturing | 6680LIQUID AND GAS FLOW, LIQUID LEVEL, AND MECHANICAL MOTION MEASURING INSTRUMENTS | Sep 26, 2024 | Sep 26, 2024 | Dec 20, 2024 | ||
| N104B3 / PM8 / M. HAWKINS / USNS APALACHICOLA (T-EPF 13) | LIGHT STRUCTURES AS | $178,347 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 334519Other Measuring and Controlling Device Manufacturing | 6680LIQUID AND GAS FLOW, LIQUID LEVEL, AND MECHANICAL MOTION MEASURING INSTRUMENTS | Sep 26, 2024 | Sep 26, 2024 | Nov 22, 2024 | ||
| 70Z04022CESDV0001 CONTRACT FOR HULL STRUCTURE MONITORING SYSTEMS TO INCLUDE INSTALLATION. 12-MONTH BASE PERIOD WITH TWO 12-MONTH OPTION PERIODS. | LIGHT STRUCTURES AS | $2,286,934 | US COAST GUARD | US COAST GUARD | — | 541330Engineering Services | H220EQUIPMENT AND MATERIALS TESTING- SHIP AND MARINE EQUIPMENT | Aug 19, 2022 | Aug 20, 2022 | May 25, 2027 | ||
| N104C/N7/PM8 M. DICKSON FUNDING FOR LABOR, MATERIAL, TRAVEL, AND ROM EXPENSES IN SUPPORT OF EPF HULL MONITORING SYSTEM DESIGN AND MATERIAL PROCUREMENT. | LIGHT STRUCTURES AS | $1,604,920 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | R425SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICAL | Aug 7, 2020 | Aug 7, 2020 | Sep 30, 2021 | ||
| HULL MONITORING SYSTEM N104C FORBES | LIGHT STRUCTURES AS | $68,028 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 811219 | J020MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT | Feb 22, 2019 | Feb 22, 2019 | Sep 30, 2019 | ||
| CONSTRUCT AND INSTALL THREE FRC SENSFIB LS98674-180065 FRC HULL STRUCTURE MONITORING SYSTEM FOR USCG FAST RESPONSE CUTTERS WITH THREE 12-MONTH OPTION PERIODS FOR FIVE PER OPTION. ITEM 1: TAS 070201520190613000 ITEM 2: 070201620200613000 | LIGHT STRUCTURES AS | $2,101,753 | US COAST GUARD | US COAST GUARD | — | 541330Engineering Services | H220EQUIPMENT AND MATERIALS TESTING- SHIP AND MARINE EQUIPMENT | Feb 22, 2019 | Mar 26, 2019 | Jul 7, 2022 | ||
| FRC HULL STRUCTURE MONITORING SYSTEM FOR FRC HULL 1130 AND HULL 1131. | LIGHT STRUCTURES AS | $222,750 | US COAST GUARD | US COAST GUARD | — | 334519Other Measuring and Controlling Device Manufacturing | H220EQUIPMENT AND MATERIALS TESTING- SHIP AND MARINE EQUIPMENT | Sep 18, 2018 | Sep 26, 2018 | Dec 3, 2018 | ||
| IGF::OT::IGF ENGINEERING SERVICES FOR FRC HULL MONITORING SYSTEM | LIGHT STRUCTURES AS | $578,410 | US COAST GUARD | US COAST GUARD | — | 541330Engineering Services | H220EQUIPMENT AND MATERIALS TESTING- SHIP AND MARINE EQUIPMENT | Sep 29, 2017 | Sep 29, 2017 | Nov 30, 2018 | ||
| IGF::OT::IGF FRC HULL STRUCTURE MONITORING SYSTEM | LIGHT STRUCTURES AS | $147,050 | US COAST GUARD | US COAST GUARD | — | 541330Engineering Services | AC36 | Sep 22, 2017 | Sep 22, 2017 | Feb 29, 2020 | ||
| IGF::OT::IGF TEST INSTRUMENTATION SUPPORT FOR FRC HULL STRUCTURE MONITORING SYSTEM TREASURY ACCOUNTING SYMBOL: X3F: 70X0613 5V: 7011/150613 6C: 7012/160613 | LIGHT STRUCTURES AS | $1,808,442 | US COAST GUARD | US COAST GUARD | — | 541330Engineering Services | H220EQUIPMENT AND MATERIALS TESTING- SHIP AND MARINE EQUIPMENT | Sep 16, 2015 | Sep 16, 2015 | Sep 16, 2017 | ||
| IGF::OT::IGF THIS EFFORT IS FOR FRC HULLS 5, 7, 8, 9&10 THE USCG SFLC ESD IS SUPPORTING DEVELOPMENT OF HULL STRUCTURAL LIFE MAINTENANCE STRATEGIES FOR THE USCG 154 FOOT FRC. A HULL STRUCTURE MONITORING (HSM) SYSTEM HAS BEEN PROTOTYPED TO MONITOR HULL GIRDER LOADING AND FATIGUE LIFE BUDGET. THIS INSTRUMENTATION SYSTEM SHALL INCLUDE ASSEMBLY AND INSTALLATION OF THE 154 HSM DEVELOPED BY LIGHT STRUCTURES AS FOR THE 154 WPC CLASS. THE SENSOR AT FRAME 17 SHALL BE INSTALLED ON THE CHINE FLAT AT THAT FRAME IAW THE SOW. POP: 1 YEAR FROM AWARD KO/KS: SUE WIEDMANN/CAROL DRESZER SFLC COR: KARL STAMBAUGH HQ COR/POC: LT YANDELL/KELLEY COX BFM: TRACY TENWALDE&ARINA KOTLYARSKAYA PM: MARK SCHWENDER | LIGHT STRUCTURES AS | $562,908 | US COAST GUARD | US COAST GUARD | — | 541330Engineering Services | H220EQUIPMENT AND MATERIALS TESTING- SHIP AND MARINE EQUIPMENT | Sep 16, 2014 | Sep 16, 2014 | Sep 15, 2015 | ||
| IGF::OT::IGF MAINTENANCE SUPPORT FOR FRC HULL STRUCTURE MONITORING SYSTEM | LIGHT STRUCTURES AS | $48,700 | US COAST GUARD | US COAST GUARD | — | 541330Engineering Services | B599SPECIAL STUDIES/ANALYSIS- OTHER | May 2, 2014 | May 2, 2014 | Jun 1, 2015 | ||
| MAINTENANCE SUPPORT FOR FRC HULL STRUCTURE MONITORING SYSTEM "IGF::OT::IGF" | LIGHT STRUCTURES AS | $98,500 | US COAST GUARD | US COAST GUARD | — | 541330Engineering Services | B599SPECIAL STUDIES/ANALYSIS- OTHER | Jan 29, 2014 | Jan 29, 2014 | Feb 28, 2014 | ||
| "IGF::OT::IGF"MAINTENANCE SUPPORT FOR FRC HULL STRUCTURE MONITORING SYSTEM | LIGHT STRUCTURES AS | $46,500 | US COAST GUARD | US COAST GUARD | — | 541330Engineering Services | B599SPECIAL STUDIES/ANALYSIS- OTHER | Jul 17, 2013 | Jul 17, 2013 | Jul 19, 2013 | ||
| WPB 110 HULL STRUCTURE MONITORING SYSTEM | LIGHT STRUCTURES AS | $132,990 | US COAST GUARD | US COAST GUARD | — | 541330Engineering Services | B599SPECIAL STUDIES/ANALYSIS- OTHER | Jul 9, 2012 | Jul 9, 2012 | Jul 8, 2013 | ||
| FRC HULL MONITORING SYSTEM ****OPEN SOURCE**** REFERENCE AAP# 624 | LIGHT STRUCTURES AS | $307,035 | US COAST GUARD | US COAST GUARD | — | 541330Engineering Services | R425SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICAL | Jun 17, 2011 | Jun 18, 2011 | Apr 30, 2013 |