ARECIBO PROJECT 4018 - CABLING PROJECT|!#^THE WORK INVOLVES CABLING INSTALLATION IN MULTIPLE LOCATIONS AT THE ARECIBO JOB CORPS CENTER INCLUDING BUILDINGS 1 TO 13 ALONG WITH ADDED NEW BUILDINGS, AND THE MDF DISCONNECTION AND RELOCATION FROM EXISTING BL
WOLF CREEK MULTIPLE BUILDING FIRE ALARM LIFE SAFETY - ADDING CARBON MONOXIDE, SMOKE AND HEAT DETECTORS FOR COMPLIANCE WITH CURRENT CODES AND STANDARDS.
THE NATIONAL PARK SERVICE (NPS) AT CHANNEL ISLANDS NATIONAL PARK (CHIS) HAS A REQUIREMENT FOR INSTALLATION OF A GOVERNMENT SUPPLIED TEMPORARY GENERATOR. THE PROJECT IS LOCATED AT CHANNEL ISLANDS NATIONAL PARK, SANTA CRUZ ISLAND, VENTURA COUNTY, CA.
INSTALLATION OF ELECTRICITY AND POWER LINES TO NEW PROSSER MODULAR LABORATORY BUILDING. UNABLE TO COMPLETE 12905B22F0208 CONTRACT FOR MODULAR BUILDING DUE TO LACK OF ELECTRICAL INSTALLATION. PENDING FUNDING
THE FAA ALBUQUERQUE AIR ROUTE TRAFFIC CONTROL CENTER (ZAB ARTCC) REQUIRES THE INSTALLATION OF AIR CURTAINS AT CAFETERIA ENTRANCE, LOADING DOCK AND CONTROL ROOM EAST EMERGENCY DOORS. WORK WITHIN THIS AREA WILL REQUIRE AN ESCORT AND MUST BE COORDINATED
THIS PROJECT SHALL CONSIST OF REPLACING THE LEAKING 1000KVA TRANSFORMER T3320, INSTALLING A FEED THROUGH -TRANSFORMER FOR BLDG. 3322 AND REPLACEMENT OF PRIMARY ELECTRIC SWITCHES SA3-010 AND SB7-010.
THIS AWARD PROVIDES FIBER LINE INSTALLATION SERVICES REQUIRED TO ADD NINE (9) CATEGORY 6 DATA RUNS FOR COMPUTER FORENSIC ANALYSIS OFFICES AND THE COMPUTER LAB.
REPLACE FEEDER CABLE 11 PP2. THE OBJECTIVE IS TO UPGRADE AND RESTORE THE ELECTRICAL DISTRIBUTION INFRASTRUCTURE TO ENSURE A RELIABLE, SAFE, AND EFFICIENT POWER SUPPLY TO CRITICAL FACILITIES, MINIMIZING DOWNTIME AND OPERATIONAL RISKS.
CLDJ-602 RELOCATE CLU BACKUP GENERATOR PP2. THE PROJECT INTENT IS TO RELOCATE AND REINSTALL THE BACKUP DIESEL GENERATOR AND ASSOCIATED AUXILIARY EQUIPMENT THAT SERVICES THE CLUS (A-D BLOCK) TO CREATE SPACE FOR THE P332/P334 CONSTRUCTION PROJECT.
CONTRACTOR TO ENGINEER, FURNISH, INSTALL, AND TEST (EFI AND T) THE UPGRADE OF PREMISE WIRING INFRASTRUCTURE TO CAT-6 FOR THE BUILDINGS 218 220 .THE CONTRACTOR SHALL ALSO BE REQUIRED TO REMOVE EXISTING OUTDATED PREMISE WIRING IN THIS BUILDING.
ENGINEER, FURNISH, AND INSTALL (EF AND I): LAYER ONE AND INFRASTRUCTURE RENOVATION(S) AND UPGRADE(S) TO BUILDING 149 - NETWORK CONTROL CENTER (NCC) FOR YWHG-15-00007-01 AT WHITEMAN AFB MO IAW ATTACHED SOW.
COLUMBUS AFB HAS A REQUIREMENT FOR THE CONTRACTOR TO ENGINEER, FURNISH, INSTALL AND TEST THE UPGRADE OF WIRING INFRASTRUCTURE TO CAT-6 FOR BUILDING 1030 IAW WITH THE RESPECTIVE STATEMENT OF WORK.