Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Apr 28, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 28, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 28, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912DY26RA063¬iceType=SolicitationNotice | LINK | Apr 28, 2026 |
W912DY26RA063
Contact and place of performance
Lynn Thomas
92277
The US Army Corps of Engineers, Engineering and Support Center, Redstone Arsenal, AL, has been tasked with initiating a Facility Reduction requirement at the USMC, Twentynine Palms, California.Pre-Demolition Surveys according to the requirements set forth in the Performance Work Statement (PWS) is for various buildings at the site. The objective is to plan and complete the environmental sampling of facilities at the...
View moreThe U.S. Army Corps of Engineers, Engineering and Support Center, Huntsville, is soliciting proposals for a Facility Reduction requirement at the USMC base in Twentynine Palms, California. This project entails conducting comprehensive pre-demolition environmental surveys for various buildings specified in the solicitation. The primary objective is to plan and execute environmental sampling to identify asbestos-containing materials (ACM) and other regulated materials (ORM), including a waste stream analysis for RCRA 8 metals, lead-based paint, and PCBs-in-paint. Contractors are responsible for quantifying all environmental contamination and determining the necessary methods for safe removal and disposal in accordance with federal, state, and local regulations.
The scope of work requires laboratory testing and analysis to be completed within a designated timeframe following site sampling. The contractor must produce an individual Pre-Demolition Assessment Report for the installation that details the results of the site investigation and sampling efforts. This report must provide comprehensive data on all materials identified, covering facility exteriors, roofs, basements, and crawl spaces. In instances where specific areas are inaccessible, the contractor must document the size and previous use of the non-sampled areas.
This solicitation, identified by number W912DY26RA063, is set aside for Women-Owned Small Businesses (WOSB). The requirement is classified under NAICS 238910 for Site Preparation Contractors and PSC P400 for Salvage-Demolition of Buildings. Proposals must be submitted by the response deadline of May 7, 2026. The contracting office, located at Redstone Arsenal, Alabama, has provided one PDF attachment as part of the solicitation materials published on April 28, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.