Name | Type | Posted | Actions |
|---|---|---|---|
Public Announcement.xlsx | XLSX | Oct 26, 2021 | |
J.27 Engineering Proposal Evaluation Questions_rev1.pdf | Apr 13, 2021 | ||
Amendment 0001 to Soliciation 6973GH-21-R-00088.pdf | Apr 13, 2021 | ||
J.02 Contract Data Requirements List_rev 1.pdf | Apr 13, 2021 | ||
J.01 Statement of Work_rev 1.pdf | Apr 13, 2021 | ||
QA_Phase I_6973GH-21-R-00088_2nd set.pdf | Mar 9, 2021 | ||
QA_Phase I_6973GH-21-R-00088.pdf | Mar 2, 2021 | ||
J.26 Past Performance Questionnaire_Rev 1.pdf | Mar 2, 2021 | ||
J.25 Relevant Corporate Experience_Rev 1.pdf | Mar 2, 2021 | ||
J.06 Travel Authorization Form.pdf | Feb 24, 2021 | ||
J.04 Government Furnished Equipment.pdf | Feb 24, 2021 | ||
J.19 FAA Order JO 3900.64.pdf | Feb 24, 2021 | ||
J.29 IDIQ Schedule B Cost Worksheet.xlsx | XLSX | Feb 24, 2021 | |
J.22 JO 6950.2E.pdf | Feb 24, 2021 | ||
J.24 FST Program Specifications.pdf | Feb 24, 2021 | ||
J.13 FAA-D-2494B.pdf | Feb 24, 2021 | ||
J.02 Contract Data Requirements List.pdf | Feb 24, 2021 | ||
J.15 FAA-STD-019F Chg 3.pdf | Feb 24, 2021 | ||
J.30 Contractor Release, DOT 4220.4.pdf | Feb 24, 2021 | ||
J.03 Data Item Description.pdf | Feb 24, 2021 | ||
J.21 JO 1050.17A.pdf | Feb 24, 2021 | ||
J.05 6010-5 CAI Form.pdf | Feb 24, 2021 | ||
J.20 FAA Order 6950.27A.pdf | Feb 24, 2021 | ||
J.27 Engineering Proposal Evaluation Questions.pdf | Feb 24, 2021 | ||
J.08 SF25A Payment Bond.pdf | Feb 24, 2021 | ||
J.07 SF25 Performance Bond.pdf | Feb 24, 2021 | ||
J.10 DOT Form F4220.3_Preconstruction Conference Agenda and Checklist.pdf | Feb 24, 2021 | ||
J.09 Form_3900-18.pdf | Feb 24, 2021 | ||
J.18 FAA JO 3900.57A CHG 1.pdf | Feb 24, 2021 | ||
J.23 FST Guidlines.pdf | Feb 24, 2021 | ||
J.28 Key Personnel Evaluation.pdf | Feb 24, 2021 | ||
J.25 Relevant Corporate Experience.pdf | Feb 24, 2021 | ||
J.11 FAA-C-1217H.pdf | Feb 24, 2021 | ||
J.14 FAA-STD-002H.pdf | Feb 24, 2021 | ||
J.17 FAA Order 1050.10D.pdf | Feb 24, 2021 | ||
J.12 FAA-C-1391E.pdf | Feb 24, 2021 | ||
6973GH-21-R-00088.pdf | Feb 24, 2021 | ||
J.01 Statement of Work.pdf | Feb 24, 2021 | ||
J.16 FAA-STD-032.pdf | Feb 24, 2021 | ||
J.26 Past Performance Questionnaire.pdf | Feb 24, 2021 |
Power Systems Installation Services
Contact and place of performance
Stefanie Wiles
USA
The FAA Power Services Group (PSG, AJW-22) has a requirement for design and installation of power systems and power system ancillary equipment. Ensure you read the solicitation in its entirety and submit proposals as indicated. Due date for Phase I proposals is March 10, 2021 at 2:00PM Central Standard Time (CST). Email Phase I proposals to [email protected]. **Question and Answers for Phase I have been uploaded. **J.25 Relevant Corporate Experience and J.26 Past Performance Questionnaire have been revised and uploaded. **2nd set of Question and Answers for Phase I have been uploaded. ***Amendment 0001 is attached with revised documents. ****Requirement has been awarded. ****
The Federal Aviation Administration (FAA) Power Services Group (PSG, AJW-22) issued solicitation 6973GH-21-R-00088 for the design and installation of power systems and power system ancillary equipment. This requirement is classified under NAICS 238210 Electrical Contractors and Other Wiring Installation Contractors and PSC N061 Installation of Equipment- Electric Wire and Power Distribution Equipment. The procurement was designated as an SBP (SBP) set-aside for performance within the United States.
Phase I proposals were due by March 10, 2021, and were submitted via email to Stefanie Wiles at the FAA Franchise Acquisition Svcs office. The solicitation process included 40 attachments, featuring the Statement of Work, a Contract Data Requirements List, and several sets of questions and answers. Following the evaluation of revised documents and engineering proposal evaluation questions, the FAA has awarded this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.