Name | Type | Posted | Actions |
|---|---|---|---|
B08_Attach_4_GFD__3_-_Current_Photos_(2-18-26).pdf | Jun 10, 2026 | ||
B08_Attach_3_GFD__2_-_Park___Site_Aerial_Map.pdf | Jun 10, 2026 | ||
B08_Attach_2_GFD__1_-_Photos_of_Construction_(1993).pdf | Jun 10, 2026 | ||
B08_Attach_1_Specifications.pdf | Jun 10, 2026 | ||
B08_Attach_8_Contract_Bid_Schedule.docx | DOCX | Jun 10, 2026 | |
B08_Attach_7_WD_27_May_2026.pdf | Jun 10, 2026 | ||
B08_Attach_5_Payment_Bond_SF25A-23a_Exp_2027.pdf | Jun 10, 2026 | ||
B08_Attach_6_Performance_Bond_SF25-23a_Exp_2027.pdf | Jun 10, 2026 | ||
Sol_140P8226B0006.pdf | Jun 10, 2026 |
"EO14398" DEMO & REMOVE COMPOST TOILET
Contact and place of performance
Davidson, Michael
Not specified
"EO14398" DEMO & REMOVE COMPOST TOILET
The National Park Service has issued solicitation 140P8226B0006 for the demolition and removal of a compost toilet system. This project is classified under NAICS 238910 for Site Preparation Contractors and PSC P400 for Salvage-Demolition of Buildings. The scope of work involves the full removal of the designated facility, supported by nine project attachments including technical specifications, current and historical site photos, aerial maps, and a contract bid schedule.
Michael Davidson is the designated point of contact for this requirement. Responses to the solicitation are due by July 13, 2026. Supporting documentation for the project includes a wage determination dated May 27, 2026, and various visual references to the site’s 1993 construction and present condition. No specific set-aside or place of performance was identified in the notice metadata.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.