The Department of State is seeking maintenance and infrastructure improvements for the International Narcotics and Law Enforcement (INL) facilities at the American Hangar, Air Wing #2 (Group 8), FAP Base–Callao in Lima, Peru. This project involves multi-trade renovations across passenger restrooms, second-floor bathrooms, an exterior evacuation staircase, the passenger hall, a VIP lounge, and logistics offices. The scope includes demolition, plumbing, architectural finishes, woodwork, electrical installations, roofing, and metal structure maintenance. All work requires professional engineering supervision and must be completed within a 120-day period of performance. Liquidated damages of $73.45 per day apply for delays. This opportunity is a Combined Synopsis/Solicitation under number 19PE5026R0002. The solicitation package includes the Performance Work Statement, technical specifications, and instructions for electronic proposal submission. The work involves construction and engineering tasks such as demolition, plumbing, electrical work, roofing, and metal structure maintenance. Contractors provide all architectural finishes and woodwork. Professional engineering supervision is required to ensure compliance with technical specifications. This requirement covers multi-trade renovation and maintenance at the INL facilities in the American Hangar at Air Wing #2 (Group 8), FAP Base–Callao, Lima, Peru. Improvements target passenger restrooms, second-floor bathrooms, an evacuation staircase, the passenger hall, a VIP lounge, and logistics offices. This is a firm-fixed-price construction contract under FAR Part 36 and FAR Part 15.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Saul E Espinoza
Lima 0
PER
Maintenance and Infrastructure Improvements at G8 INL Facilities – American Hangar, FAP Base–Callao, Lima, Peru
This requirement encompasses comprehensive multi-trade renovation and maintenance work at the INL facilities within the American Hangar at Air Wing #2 (Group 8), FAP Base–Callao, including passenger restrooms, second-floor bathrooms, exterior evacuation staircase, passenger hall, VIP lounge, and logistics offices. Work includes demolition, plumbing, architectural finishes, woodwork, electrical installations, roofing, metal structure maintenance, and professional engineering supervision