Name | Type | Posted | Actions |
|---|---|---|---|
Attachment_1_-_Draft_SOW_SLV-CB_Concrete_Work_1.docx | DOCX | May 21, 2026 |
Z--SLV-CB Shop Floor (Concrete Work)
Contact and place of performance
Lucero, Ronda
Not specified
SLV-CB SHOP FLOOR (Concrete Work) PRESOLICITATION NOTICE In accordance with Revolutionary FAR Overhaul FAR 12.201-1(c)(2), The Contracting Officer has decided to solicit quotations directly from suppliers since this acquisition is at or below the simplified acquisition threshold. No solicitation will be posted on the System for Award Management (SAM). In accordance with Revolutionary FAR Overhaul FAR 5.101(c): (1) Po...
View moreThe Bureau of Reclamation, Albuquerque Area Office, Alamosa Field Division, has issued this pre-solicitation notice for the removal and replacement of damaged concrete features that have shifted or heaved at the SLV-CB Shop Floor. The selected contractor will perform all demolition and concrete work, furnish necessary equipment and materials, and conduct required testing. This commercial construction project is classified under NAICS 238110, Poured Concrete Foundation and Structure Contractors, and PSC Z2EB, Repair or Alteration of Maintenance Buildings. The acquisition is a total small business set-aside (SBA) conducted under simplified acquisition procedures, with award determined by a best value evaluation of technical capability, past performance, and price.
A draft Statement of Work was posted on May 21, 2026, as part of the initial announcement under solicitation number 140R4026Q0058. While the government intends to solicit quotations directly from suppliers rather than posting a formal solicitation on SAM.gov, all responsible sources may submit a quote for consideration. Prospective offerors must maintain an active registration in the System for Award Management to be eligible for award. One or more items under this acquisition are subject to Free Trade Agreements.
The performance period is anticipated to begin on or about August 1, 2026. The deadline for submitting questions regarding the requirement to the primary point of contact, Ronda Lucero, is June 4, 2026, at 1:00 p.m. MDT. Detailed technical information and specific instructions for preparing quotes will be provided through the Statement of Work and during a scheduled site visit. One attachment, a draft Statement of Work in .docx format, is currently associated with this notice.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.