Name | Type | Posted | Actions |
|---|---|---|---|
36C77626B0009 0006.pdf | Jun 10, 2026 | ||
Technical Questions Responses - Syracuse EHRM - 6-9-26.pdf | Jun 10, 2026 | ||
ATTACHMENT 1 - SPEC DIV 01-13 Updated 6-3-26.pdf | Jun 10, 2026 | ||
ATTACHMENT 4 - Drawings General - Architectural Updated 5-20-26.pdf | Jun 10, 2026 | ||
ATTACHMENT 5 - Drawings Electrical Updated 5-20-26.pdf | Jun 10, 2026 | ||
ATTACHMENT 6 - Drawings Mechanical Updated 5-20-26.pdf | Jun 10, 2026 | ||
ATTACHMENT 7 - Drawings Structural Updated 5-20-26.pdf | Jun 10, 2026 | ||
ATTACHMENT 8 - Drawings Technology Updated 5-20-26.pdf | Jun 10, 2026 | ||
ATTACHMENT 9 - Drawings Telecommunications Updated 5-20-26.pdf | Jun 10, 2026 | ||
36C77626B0009 0005.pdf | Jun 4, 2026 | ||
ATTACHMENT 15 - Construction Wage Rates - Onondaga 5-18-26.pdf | Jun 4, 2026 | ||
36C77626B0009 0004.pdf | May 18, 2026 | ||
36C77626B0009 0003.pdf | Apr 30, 2026 | ||
C - 52.222-90 Addressing DEI Discrimination by Federal Contractors - APR 2026.pdf | Apr 30, 2026 | ||
VAAR 852.204-70 Personal Identity Verification of Contractor Personnel - DEV MAR 2026.pdf | Apr 8, 2026 | ||
Section 23 09 23 Digital Control System HVAC - Updated 3-17-26.pdf | Apr 8, 2026 | ||
36C77626B0009 0002.pdf | Apr 8, 2026 | ||
VAAR 852.204-72 Personnel Vetting and Credentialing MAR 2026 REV.pdf | Apr 8, 2026 | ||
36C77626B0009 0001.pdf | Mar 11, 2026 | ||
Site Visit Sign-in Sheet - Syracuse EHRM 3-11-26.pdf | Mar 11, 2026 | ||
ATTACHMENT 16 - Site Visit Instructions.pdf | Mar 2, 2026 | ||
36C77626B0009 - 3-2-26.pdf | Mar 2, 2026 | ||
ATTACHMENT 1 - SPEC DIV 01-13.pdf | Mar 2, 2026 | ||
ATTACHMENT 2 - SPEC DIV 21-23.pdf | Mar 2, 2026 | ||
ATTACHMENT 3 - SPEC DIV 25-28.pdf | Mar 2, 2026 | ||
ATTACHMENT 4 - Drawings General - Architectural.pdf | Mar 2, 2026 | ||
ATTACHMENT 5 - Drawings Electrical.pdf | Mar 2, 2026 | ||
ATTACHMENT 6 - Drawings Mechanical.pdf | Mar 2, 2026 | ||
ATTACHMENT 7 - Drawings Structural.pdf | Mar 2, 2026 | ||
ATTACHMENT 8 - Drawings Technology.pdf | Mar 2, 2026 | ||
ATTACHMENT 9 - Drawings Telecommunications.pdf | Mar 2, 2026 | ||
ATTACHMENT 10 - Asbestos Report.pdf | Mar 2, 2026 | ||
ATTACHMENT 11 - Syracuse Campus Map.pdf | Mar 2, 2026 | ||
ATTACHMENT 12 - Brand Name Justification.pdf | Mar 2, 2026 | ||
ATTACHMENT 13 - Pre-Construction Risk Assessment.pdf | Mar 2, 2026 | ||
ATTACHMENT 14 - Limitations on Subcontracting - Construction.docx | DOCX | Mar 2, 2026 | |
ATTACHMENT 15 - Construction Wage Rates - Onondaga 1-30-26.pdf | Mar 2, 2026 |
Y1BG--EHRM Infrastructure Upgrades Construction - Syracuse - Project 528A7-22-700
Contact and place of performance
Thomas Council
Syracuse, NY 13210
USA
Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for EHRM INFRASTRUCTURE UPGRADES as required by drawings and specifications. Project scope includes, but is not limited to, the following infrastructure upgrades: Upgrading facility fiber throughout the buildings to each IT closet; Providing redund...
View moreThe Department of Veterans Affairs is seeking construction services for infrastructure upgrades to support Electronic Health Record Modernization at facilities in Syracuse, New York, and the Rome Community-Based Outpatient Clinic. This requirement, identified under solicitation number 36C77626B0009, is designated as an SDVOSBC (SDVOSBC) set-aside. The project is classified under NAICS 236220, Commercial and Institutional Building Construction, and PSC Y1BG, CONSTRUCTION OF ELECTRONIC AND COMMUNICATIONS FACILITIES. Thomas Council is the designated point of contact for this solicitation, and responses are due by June 23, 2026.
The scope of work involves site preparation, demolition, and the furnishing of all labor and materials to upgrade infrastructure across Buildings 1, 2, 16, and the Rome site. Primary tasks include installing redundant facility fiber runs and mains, providing Cat 6A cabling to all points of use, and adding IT and electrical outlets throughout the facility. The project also requires a new Data Center server room, upgrades to facility power distribution including UPS systems, HVAC distribution improvements, physical security enhancements, and the abatement of hazardous materials.
The solicitation documentation consists of 37 attachments, including updated architectural, electrical, and mechanical drawings, project specifications, and technical question responses. Performance will take place on-site in Syracuse and associated clinic locations. All work must be performed according to the drawings and specifications provided in the solicitation package.