Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | May 8, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | May 8, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | May 8, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9126G26RA019¬iceType=SolicitationNotice | LINK | May 8, 2026 |
Climate Controlled Storage Facility
Contact and place of performance
Kristi MORRIS
Not specified
Update 0002 is to issue Amendment 0001 // Update 0001 is to include the Site Visit Sign-In sheet and photos. // The proposed project is a 100% Small Business Set-Aside for a Design-Bid-Build Construction contract for Climate Controlled Storage Facility, Red River Army Depot, Texas. For details, see attached Solicitation located in the PIEE Solicitation Module.
The Department of the Army, specifically the U.S. Army Corps of Engineers Fort Worth District, is soliciting bids for a Design-Bid-Build construction contract to provide a climate-controlled storage facility at the Red River Army Depot in Texas. This requirement is classified under NAICS 236220, Commercial and Institutional Building Construction, and PSC Y1GZ, Construction of Other Warehouse Buildings. The procurement is designated as an SBA Small Business Set-Aside.
Solicitation W9126G26RA019 includes provisions for the construction of specialized warehouse space as detailed in the project specifications. Recent updates to the notice have incorporated Amendment 0001 as well as a site visit sign-in sheet and site photographs. One PDF attachment is included with the official posting.
Kristi Morris serves as the point of contact for this requirement. Submissions are due by June 22, 2026. Detailed instructions and project requirements are maintained within the PIEE Solicitation Module.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.