Helena-Lewis & Clark NF - Kading Campground Well Drilling
Contact and place of performance
Daniel Franco
Elliston, MT 59728
USA
Award Results: Awarded on 06/04/2026 to Gruber Excavating Inc for the full amount of $22,528.00 This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1240LU26Q0069 is issued as a Request for Quotat...
View more
This acquisition is set-aside for small business concerns. The applicable North American Industry
Classification Standard Code is 237110 Water and Sewer Line and Related Structures Construction. The
small business size standard is $45M. This acquisition is a Total Small Business Set-Aside. All responsible
sources may submit a quotation which will be considered by the agency.
SCOPE OF CONTRACT
A. Base Items:
a. This project is for the development of well and hand pump to serve the Kading Campground in the Helena Ranger District of the Helena-Lewis and Clark National Forest.
b. Work includes drilling a well and installing a complete hand pump assembly on new well casing, concrete pad, drain, and all pump components necessary for a typical campground water supply.
c. Contractor is responsible for all labor, materials, tools, etc. necessary to complete the work. All waste and excess materials generated from construction shall be disposed of off Forest Service lands and in compliance with governing federal, state, and local laws.
PERIOD OF PERFORMANCE:
A. June 22, 2026 - September 30, 2026.
B. All work shall be completed by September 30, 2026.
SITE VISIT:
A. No official Site Visit shall be performed. Per FAR Part 52.236-3 “Site Investigation and Conditions Affecting the Work”, contractor is encouraged and expected to visit the site. Ensure you are familiar with inclement weather as this may hinder access to certain roads.
PRICE RANGE:
A. Between $25,000 and $100,000.
Performance & Payment Bonds (FAR 52.228-15):
Both required at 100% of original contract
price if value in excess of $150,000, due 10 days after award. Only payment protections are required
for contracts exceeding $35,000 but not exceeding $150,000, irrevocable letter of credit or payment
bond allowed per FAR 52.228-13, due within 10 days of contract award.
DOCUMENTS TO RETURN:
The following documents shall be submitted by the quoter for evaluation to be considered responsive:
• Attachment 1 - Schedule of Items
• Attachment 2 - Statement of Work
• Attachment 3 - Experience Questionnaire
• Acknowledge Amendments (per the instructions in Block 11 on the SF-30) if applicable.
Send quote to: Forest Service, Property and Procurement Services, Intermountain Zone, CSA #9
Attn: Daniel Franco
E-mail: [email protected]
For solicitation questions call email [email protected]. Questions are due no later than 15
May, 2026 by 12:00 P.M. (Mountain Time). This will ensure enough time to respond before the
solicitation period ends. Please include the solicitation name and number (Kading Campground Well
Drilling, 1240LU26Q0069) as the subject line of the email.
The Forest Service, via USDA-FS CSA Intermountain 9, issued solicitation 1240LU26Q0069 for the development of a well and hand pump at the Kading Campground within the Helena Ranger District of the Helena-Lewis and Clark National Forest. This project requires drilling a well and installing a complete hand pump assembly, including new well casing, a concrete pad, a drain, and all components necessary for a standard campground water supply. The contractor is responsible for providing all labor, materials, and tools for the project and must dispose of all construction waste off Forest Service lands at a location in Elliston, Montana.
This procurement was conducted as a combined synopsis/solicitation for commercial items under NAICS 237110 Water and Sewer Line and Related Structures Construction and PSC Y1NE Construction of Water Supply Facilities. The acquisition was designated as a SBA Total Small Business Set-Aside. Seven attachments supported the notice, including a statement of work, well drawings, and an experience questionnaire. Daniel Franco served as the point of contact for the request for quotation, which had a response deadline of May 22, 2026.
The contract was awarded on June 4, 2026, to Gruber Excavating Inc for the full amount of $22,528.00. The established period of performance for the well drilling and installation begins June 22, 2026, with a required completion date of September 30, 2026. Specific requirements for the award included the provision of payment protections for contracts exceeding $35,000, though the final award value fell below that threshold.