Name | Type | Posted | Actions |
|---|---|---|---|
A00001.pdf | Aug 26, 2022 | ||
Section C Statement of Work (SOW) Updated 18 July 2022.docx | DOCX | Jul 18, 2022 | |
Section C-2 Technical Requirements Testing.docx | DOCX | Jul 13, 2022 | |
SF1449-21.pdf | Jul 11, 2022 | ||
SOLICITATION.pdf | Jul 11, 2022 | ||
Section C-1 Specification Updated 7 July 2022.pdf | Jul 11, 2022 | ||
SK-175MMA INTERFACE 01.pdf | Jul 11, 2022 | ||
OMBUDSMAN.doc | DOC | Jul 11, 2022 | |
DHS_Form_700-21.pdf | Jul 11, 2022 |
175'WLM BUOY CRANES
Contact and place of performance
Kelly Wyatt
Not specified
The U.S. Coast Guard (USCG), Surface Forces Logistics Center (SFLC), In-Service Vessel Sustainment (ISVS) Section, has a rquirement to procure an estimated fourteen (14)commercially-available Aids toNavigation (ATON) Cranes with Integrated Controls and Central Hydraulic System to be manufactured, tested, preserved, packaged, and marked in accordance with Coast Guard Specifications; an onboard repair parts kit; and sy...
View moreThe United States Coast Guard (USCG), Surface Forces Logistics Center (SFLC), In-Service Vessel Sustainment (ISVS) Section, requires the procurement of approximately 14 commercially available Aids to Navigation (ATON) cranes. These cranes must feature integrated controls and a central hydraulic system, and the requirement includes the manufacture, testing, preservation, packaging, and marking of the units according to Coast Guard specifications. Additionally, the contractor will provide onboard repair parts kits, system stock parts, technical representative services to support commissioning for each installation, and operational and maintenance training. Performance involves an Indefinite-Delivery Indefinite-Quantity (IDIQ) contract with one 12-month base period and nine 12-month option periods.
Solicitation 70Z04022R65094B00 is a total small business set-aside (SBA). The procurement is classified under NAICS 333923, Overhead Traveling Crane, Hoist, and Monorail System Manufacturing, and PSC 2030, DECK MACHINERY. Deliveries for the cranes and associated parts are required F.O.B. Destination to the USCG Surface Forces Logistics Center in Baltimore, Maryland.
The response deadline for this pre-solicitation notice is September 15, 2022. All responsible sources may submit a proposal for consideration to the primary point of contact, Kelly Wyatt. Documentation for this requirement includes nine attachments, such as the Statement of Work (SOW), technical testing requirements, and detailed specifications. All inquiries regarding the solicitation or specifications must be submitted in writing.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.