Name | Type | Posted | Actions |
|---|---|---|---|
Atch 1 Question Response 1.docx | DOCX | Jun 5, 2026 | |
36C24426Q0248 0003_1.docx | DOCX | Jun 5, 2026 | |
36C24426Q0248 0003.docx | DOCX | Jun 5, 2026 | |
36C24426Q0248 0002.docx | DOCX | May 29, 2026 | |
36C24426Q0248 0001_1.docx | DOCX | May 22, 2026 | |
0001 36C24426Q0248 .docx | DOCX | May 22, 2026 | |
36C24426Q0248_1.docx | DOCX | May 19, 2026 | |
Atch 2 SCA WD No. 2015-4215 Rev. 31 Dated 05132026.pdf | May 19, 2026 | ||
Atch 1 852.219-75 MUST SIGN AND RETURN WITH QUOTE.pdf | May 19, 2026 | ||
36C24426Q0248.pdf | May 19, 2026 |
J061--Building 15 Uninterruptible Power Supply (UPS) replacement service Equivalent to APC Symmetra PX 80 kVA for VA Wilmington
The Department of Veterans Affairs is replacing the Uninterruptible Power Supply (UPS) system in Building 15 at the Wilmington VA Medical Center. This 100% SDVOSB set-aside requires a system equivalent to an APC Symmetra PX 80 kVA. The project includes installation within existing infrastructure, requiring a 208V 3-phase input and 24/7 emergency response. Three amendments have been issued to extend the deadline and provide technical clarifications. A site visit is scheduled for June 10, 2026, and quotes are due June 12, 2026. Evaluation will use the Lowest Price Technically Acceptable (LPTA) method. Technical requirements include a 47-minute minimum battery runtime and a new mains input. The Department of Veterans Affairs is replacing an 80 kVA UPS system in Building 15 at the Wilmington VA Medical Center. The new unit must be equivalent to an APC Symmetra PX 80 kVA. This procurement is a 100% SDVOSB set-aside and will be evaluated on an LPTA basis. The project involves removing the existing UPS and installing a system equivalent to an APC Symmetra PX 80 kVA in Building 15. The contractor is responsible for all tools, parts, testing, and disposal of the old unit and batteries. The system must be commissioned, programmed, and integrated with the facility IT network.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Allan Tabliago
Wilmington, DE 19805
USA
The purpose of amendment 0003 is to extend the RFQ due date and provide RFI responses.