Name | Type | Posted | Actions |
|---|---|---|---|
36C25026Q0034 0005.pdf | May 28, 2026 | ||
36C25026Q0034 0004.pdf | Dec 11, 2025 | ||
539-25-505 - CD Set - Revision 1.pdf | Dec 11, 2025 | ||
REVISED STATEMENT OF BID ITEMS.pdf | Dec 11, 2025 | ||
36C25026Q0034 0003.pdf | Dec 10, 2025 | ||
36C25026Q0034 0002.pdf | Nov 25, 2025 | ||
36C25026Q0034 0001.pdf | Nov 4, 2025 | ||
Attachment V - vha directive 1192.01.pdf | Oct 31, 2025 | ||
Attachment VI - Specs.pdf | Oct 31, 2025 | ||
Attachment III - RFI.pdf | Oct 31, 2025 | ||
Attachment II - EMR.pdf | Oct 31, 2025 | ||
Attachment IV - Limitation on Subcontracting Cert.pdf | Oct 31, 2025 | ||
36C25026Q0034_1.pdf | Oct 31, 2025 | ||
Attachment I - DBA.pdf | Oct 31, 2025 | ||
Attachment VII - Construction Documents.pdf | Oct 31, 2025 |
539-25-505 Maintain Parking Garage Safety
Contact and place of performance
Samuel Galbreath
Cincinnati, OH 45220
USA
The “Maintain Parking Garage Safety” project will replace waterproofing joint sealants throughout the garage, as well as remove and patch concrete at the joints between slabs where water intrusion has caused damage. This work is to be performed over weekends to avoid conflicts with VA operations. The contractor will also procure and coordinate with a firm, THP LTD, qualified to perform consulting service...
View moreThe Department of Veterans Affairs is soliciting for project 539-25-505 to maintain parking garage safety at a facility in Cincinnati, Ohio. This requirement, issued under solicitation number 36C25026Q0034, is set aside for SDVOSBC (SDVOSBC). The scope of work involves replacing waterproofing joint sealants throughout the garage and performing concrete removal and patching at slab joints where water intrusion has caused damage. To avoid conflicts with daily operations, all work must be performed during weekend hours.
The project is classified under NAICS 238110 Poured Concrete Foundation and Structure Contractors and PSC Z1DZ MAINTENANCE OF OTHER HOSPITAL BUILDINGS. The contractor is responsible for procuring and coordinating with THP LTD for consulting services to evaluate the structural condition of the garage, including its floors, soffits, perimeter walls, façade, and stair towers. This evaluation includes sounding surveys and chloride ion testing of each floor to identify deterioration and structural or waterproofing conditions requiring remedy according to industry standards for concrete condition assessment.
Responses to this solicitation are due by May 28, 2026. The primary point of contact is Samuel Galbreath. Documentation for this opportunity includes 15 attachments, such as revised statements of bid items, revised construction document sets, and several solicitation amendments.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.