Name | Type | Posted | Actions |
|---|---|---|---|
QA Fiber Optic B230-B9511 - FA302226Q0009.pdf | Jun 11, 2026 | ||
SOW_ITB 230 to B9511 (3-26).pdf | Jun 4, 2026 | ||
Solicitation Amendment FA302226Q00090003 SF 30.pdf | Jun 4, 2026 | ||
Solicitation Amendment FA302226Q00090002 SF 30.pdf | May 26, 2026 | ||
EAL for Premise Wiring B230 to B9511 Site Visit.pdf | May 26, 2026 | ||
EAL for Premise Wiring B230 to B9511 Site Visit.pdf | May 14, 2026 | ||
Solicitation Amendment FA302226Q00090001 SF 30.pdf | May 14, 2026 | ||
MFR CUI Safeguard_cc.pdf | May 14, 2026 | ||
Contractors CUI Training Slides 1 (002) - Read-Only.pptx | PPTX | May 14, 2026 | |
Solicitation - FA302226Q0009 - CO Signed.pdf | May 8, 2026 | ||
Attachment 4 - DAFFARS Clauses.pdf | May 8, 2026 | ||
Attachment 2 - SOW_ITB 230 to B9511 - No Building Drawings.pdf | May 8, 2026 | ||
Attachment 3 - Provisions and Clauses.pdf | May 8, 2026 | ||
Attachment 1 - Wage Determination.pdf | May 8, 2026 |
Fiber Optic Cable B230 to B9511
The 14th Contracting Squadron at Columbus Air Force Base is seeking quotes for the engineering, furnishing, installation, and testing (EFI&T) of fiber optic infrastructure. This project requires installing roughly 3,100 feet of 12-strand single-mode fiber optic cable to connect Infrastructure Transfer Building 230 and Building 9511. Work includes terminating the cable into new 12-port distribution panels and meeting specific outside plant standards. This is a 100% Small Business Set-Aside under NAICS code 238210, with evaluation based on the Lowest Price Technically Acceptable (LPTA) method. Recent amendments have set a 10-page limit for technical volumes and require both redacted and unredacted versions. The performance period is 120 days at Columbus AFB, Mississippi, with a target delivery date of October 15, 2026. Final quotes are due by June 16, 2026. The project requires all labor and materials for outside plant infrastructure, including geotextile innerduct and fiber distribution panels. Amendment 0003 set a 10-page limit for technical volumes and requires both redacted and unredacted copies. The performance period is 120 days, with a target completion date of October 15, 2026. The Air Force requires engineering, furnishing, installation, and testing (EFI&T) for a 12-strand single-mode fiber optic link at Columbus AFB. The project connects Infrastructure Transfer Building (ITB) 230 to Building 9511, spanning approximately 3,100 feet and including a maintenance loop. The contractor must provide all equipment, tools, and labor, ensuring all components like distribution panels and splicing materials are new.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
JACKSON BASIL
MS 39710
USA
Engineer, furnish, install and test (EFI&T) 12-strand single mode (SM) fiber optic cables (FOC) from Infrastructure Transfer Building (ITB) 230 to Building (B) 9511 at Columbus AFB, MS. The Contractor shall install approximately 3,100 feet (maintenance loop included) of 12-strand SM FOC from ITB 230 to B9511. Terminate 12 strand SM FOC in the new 12-port FODP in ITB 230, and outdoor FODP in B9511. A site vi...
View moreAmendment 0003 issued 4 June 2026. SOW drawing page added. Q&A date and quote due date amended.
June 11, 2026 Q&A attachment posted.