Name | Type | Posted | Actions |
|---|---|---|---|
S06_36C78626B0008 Amendment 0002.pdf | Jun 12, 2026 | ||
S06_36C78626B0008 Amendment 0001.pdf | Jun 7, 2026 | ||
Attachment Standard Form 1413.pdf | May 12, 2026 | ||
Attachment 7 Herbicide Application Data Sheet v1.pdf | May 12, 2026 | ||
Attachment 11_Wage Determination 01.01.2026_806NSP25004.pdf | May 12, 2026 | ||
Exhibit A Camp Butler National Cemetery Renovation Areas.pdf.pdf | May 12, 2026 | ||
Attachment 10_Scope of Work_806NSP25004.pdf | May 11, 2026 | ||
Attachment 8 Contractors Employee Statement of Compliance.pdf | May 8, 2026 | ||
Attachment 9 Contractors Daily Log of Construction.pdf | May 8, 2026 | ||
Exhibit D Flat Marker Realignment Diagrams.pdf | May 8, 2026 | ||
S02_36C78626B008 National Shrine Project_Camp Butler.pdf | May 8, 2026 | ||
Exhibit B Headstone Setting Details.pdf | May 8, 2026 | ||
Exhibit E Example Site Survey Headstone Realignment and Grading Plans.pdf | May 8, 2026 | ||
Exhibit C Upright Headstone Realignment Diagrams.pdf | May 8, 2026 | ||
Attachment 1 Work Summary Progress Report Uprights.pdf | May 8, 2026 | ||
Attachment 2 Work Summary Progress Report Flats.pdf | May 8, 2026 | ||
Attachment 3 Contract Performance Quality Assurance Report.pdf | May 8, 2026 | ||
Attachment 6 Daily Headstone Marker Raise Realign Verification Survey.pdf | May 8, 2026 | ||
Attachment 5 Initial Headstone Marker Raise and Realign Verification Survey.pdf | May 8, 2026 | ||
Attachment 4 Contract Discrepancy Report.pdf | May 8, 2026 |
Camp Butler National Cemetery – National Shrine Project 806-NSP25-004
The Department of Veterans Affairs is renovating burial sections at Camp Butler National Cemetery in Springfield, Illinois, under project 806-NSP25-004. The work involves site surveying, raising and realigning upright headstones and flat markers, turf renovation with sod, and marker cleaning. This is an Invitation for Bid (IFB) set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). Performance requires meeting technical tolerances, including 1/8-inch alignment and 1-degree vertical plumbness. Operations must stop three to five times daily for burial services. The period of performance is 365 days. Amendment 0001 extended the bid opening to June 14, 2026, and clarified requirements for government-furnished headstones and specific sod cultivars. This Invitation for Bid (IFB) is restricted to SDVOSB firms and includes a detailed SOW, engineering drawings, and reporting templates. Renovate burial sections at Camp Butler National Cemetery to meet NCA National Shrine appearance standards.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Shane Hilts
Springfield, IL 62707
USA
See Solicitation documents