Name | Type | Posted | Actions |
|---|---|---|---|
B704 Questions and Answers.pdf | May 28, 2026 | ||
Attachment 3_Wage Determination.pdf | May 13, 2026 | ||
Attachment 2_Provisions and Clauses.pdf | May 13, 2026 | ||
Attachment 1_B704 Fitness Center P.W. SOW.pdf | May 13, 2026 | ||
Combined Synopsis Solicitation.pdf | May 13, 2026 |
Premise Wiring B704
Contact and place of performance
Holly Walters
Columbus, MS 39705
USA
Columbus AFB has a requirement for the Contractor to engineer, furnish, install, and test (EFI&T) the upgrade of premise wiring infrastructure to Cat-6 for the building 704 (B704) at Columbus AFB, MS. The Contractor shall install approximately 37 cable/jacks (15 duplex, 1 quad, 3 wall drop) and coordinate with the 14th CS/SCXP to verify the exact drop locations. Install & terminate [66blk, 24p PP] 25pr./24ga....
View moreThe Department of the Air Force, specifically the FA3022 14 CONS LGCA, has issued a combined synopsis and solicitation for premise wiring upgrades at Building 704 (B704) located at Columbus Air Force Base in Mississippi. This project requires the contractor to engineer, furnish, install, and test an upgrade of the existing infrastructure to Cat-6 standards. Work includes the installation of approximately 37 cable jacks consisting of 15 duplex, one quad, and three wall drops, as well as the installation and termination of a 25-pair/24-gauge riser cable. The contractor must coordinate with the 14th CS/SCXP to verify exact drop and riser locations. Access to the base requires a REAL ID-compliant driver’s license, Social Security number, date of birth, and active vehicle registration and insurance.
This procurement is identified under solicitation number FA302226Q0319 and is categorized under NAICS 238210 for Electrical Contractors and Other Wiring Installation Contractors and PSC N061 for Installation of Equipment- Electric Wire and Power Distribution Equipment. The opportunity is designated as an SBA set-aside. Interested parties must submit responses by June 1, 2026. Holly Walters is the point of contact for this requirement.
The solicitation includes five attachments: the Combined Synopsis Solicitation document, the Statement of Work, a list of provisions and clauses, a wage determination, and a questions and answers document. These materials were published and updated between May 13, 2026, and May 28, 2026. The place of performance is Columbus, MS.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.