Midwest City Water Tower
Contact and place of performance
Tyler Godwin
Midwest City, OK
USA
Pre-solicitation Notice For MIDWEST CITY WATER TOWER Midwest City, Oklahoma County, Oklahoma This is a PRE-SOLICITATION NOTICE for the construction of a Water Tower and associated infrastructure for Midwest City, Oklahoma. TH IS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to...
View moreMidwest City (MWC)is developing a high-pressure zone to improve the low pressures within the southeastern portion of the water distribution system (WDS) and proposed improvements that include the following, and incidental related work:
The estimated magnitude of construction for this project is between $10,000,000 and $25,000,000.
The North American Industry Classification System code for this procurement 237110 (Water and Sewer Line and Related Structures Construction) which has a small business size standard of $45M.
The Product Service Code is: Y1NE (Construction of Water Supply Facilities)
Estimated duration of construction of this project is 450 calendar days.
Anticipated solicitation issuance date is on or about 23 June 2026, and the estimated proposal due date will be on or about 23 July 2026.
The U.S. Army Corps of Engineers, Tulsa District, is issuing a pre-solicitation notice for a design-bid-build project to construct a new water tower and associated infrastructure in Midwest City, Oklahoma. This project aims to establish a high-pressure zone to address low-pressure issues in the southeastern portion of the city's water distribution system. The scope of work includes the construction of a 500,000-gallon elevated storage tank and a new high service pump station, both featuring integrated piping, electrical systems, and controls.
Additional requirements involve installing approximately 650 linear feet of 12-inch ductile iron pipe and reconfiguring distribution system piping at the Titan Tower Tank site and the intersection of 15th Street and Westminster Road. The project includes shoring, dewatering, traffic control, and erosion and sediment management throughout the estimated 450-calendar-day performance period. This procurement is classified under NAICS 237110 Water and Sewer Line and Related Structures Construction and PSC Y1NE CONSTRUCTION OF WATER SUPPLY FACILITIES. The estimated magnitude of construction is between $10,000,000 and $25,000,000.
This unrestricted, firm-fixed-price contract will be solicited as a negotiated procurement under solicitation number W912BV26RA027, utilizing the Lowest Price Technically Acceptable approach. The anticipated solicitation issuance date is approximately June 23, 2026, with proposals estimated to be due by July 23, 2026. Tyler Godwin is the designated point of contact for this notice, which contains no current attachments.