Name | Type | Posted | Actions |
|---|---|---|---|
Amend 0002_SUMMARY OF CHANGES (2).pdf | Jun 11, 2026 | ||
Amend 0001_SUMMARY OF CHANGES.pdf | Jun 3, 2026 | ||
Attach 2_ Schedule of Items.xlsx | XLSX | Jun 2, 2026 | |
Attach 4_SCA_WD_2015-5367_South Dakota.pdf | Jun 2, 2026 | ||
1240LT26Q0079_Tepee WC Well Pump.pdf | Jun 2, 2026 | ||
Attach 1_SOW.pdf | Jun 2, 2026 | ||
Attach 3_Specifications_Tepee Well Pump_7May2026.pdf | Jun 2, 2026 |
TEPEE WORK CENTER WELL PUMP PROJECT
The Forest Service is seeking a contractor for the Tepee Work Center Well Pump Project in the Black Hills National Forest, Custer County, South Dakota. This 100% small business set-aside involves replacing a deep-well pump system, including all labor, materials, equipment, and testing. The project requires removing the current assembly and installing a new 5 HP submersible pump and controls for a well reaching 921 feet. The government intends to award a firm-fixed-price contract with a performance window from July 30 to August 31, 2026. Work will be performed in Edgemont, South Dakota, and requires a South Dakota licensed well driller, a pump installer, and an electrician. Technical tasks include pulling the existing assembly from depths between 820 and 880 feet, installing new cabling, and conducting mandatory bacteriological testing and diagnostics. The solicitation package includes a Statement of Work, technical specifications, and a pricing template. The contractor is responsible for all labor, equipment, and testing needed to return the well to service. Performance is scheduled for late July through August 2026. The project involves removing and replacing a deep-well pump system for a 921-foot well in the Black Hills National Forest. The contractor will provide all labor, materials, and equipment to restore the well, including pulling the old assembly, diagnosing the failure, and installing a new 5 HP submersible pump with surface controls and cabling.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Janice King
Edgemont, SD 57735
USA
PROJECT: TEPEE WORK CENTER WELL PUMP PROJECT - BLACK HILLS NATIONAL FOREST- CUSTER COUNTY, SD JUNE 11, 2026: AMENDMENT TWO (A0002) - Please read this AMENDMENT (A0002) in its entirety. This Amendment (A0002) provides responses to Contractor's questions. This information is found in the Attachments/Links section. Quotes are due by JUNE 17, 2026, at 9:00 a.m. Central Daylight Time...
View moreDescription of Work: The contractor shall provide all labor, materials, equipment, testing, and documentation necessary for the removal of the existing and replacement of a new deep-well pump system for a 921-foot well, including the installation of a new 5 HP submersible pump and associated controls. See the SOW, SPECS, and SOI for additional information.