Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Apr 29, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 29, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 29, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9126G26RA019¬iceType=Presolicitation | LINK | Apr 29, 2026 |
Climate Controlled Storage Facility
Contact and place of performance
Kristi MORRIS
Not specified
**This notice ID: W9126G26RA019 is being issued to correct a clerical error and is replacing notice ID: W912626RA019.** // The proposed project is a 100% Small Business Set-Aside for a Design-Bid-Build Construction contract for Climate Controlled Storage Facility, Red River Army Depot, Texas. See attached Pre-Solicitation Notice for details.
The Department of the Army, Engineering District Fort Worth, is seeking a contractor for the construction of a climate-controlled storage facility at the Red River Army Depot in Texas. This requirement is being solicited as a 100% SBA SBA small business set-aside. The project is classified under NAICS 236220 Commercial and Institutional Building Construction and PSC Y1GZ CONSTRUCTION OF OTHER WAREHOUSE BUILDINGS.
This procurement utilizes a design-bid-build construction contract model. The current notice, issued under solicitation number W9126G26RA019, replaces the previous notice ID W912626RA019 to correct a clerical error. Kristi Morris is the designated point of contact for this requirement. Available documentation for this opportunity includes one PDF attachment published on April 29, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.