PRE-DEMOLITION SURVEY VARIOUS BUILDINGS NASA WALLOPS FLIGHT FACILITY SURVEY WALLOPS, VA
Contact and place of performance
Tyrone M. Brown,
Wallops Island, VA
USA
The objective of this Performance Work Statement is to plan and complete the environmental sampling of facilities at the installation. The structures of concern are listed in Table I. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB’s-in-paint for those parts of the structure currently identified as potentially having any pa...
View moreThe U.S. Army Engineering and Support Center, Huntsville, is soliciting services for a pre-demolition environmental survey of various buildings at the NASA Wallops Flight Facility in Wallops Island, Virginia. The primary objective is to plan and execute environmental sampling to identify Asbestos Containing Materials (ACM) and Other Regulated Materials (ORM), alongside conducting a Waste Stream Analysis for Resource Conservation and Recovery Act (RCRA) 8 metals, lead-based paint, and polychlorinated biphenyls (PCBs) in paint. The contractor is responsible for quantifying all environmental contamination and identifying safe removal and disposal methods in compliance with federal, state, and local regulations.
This requirement, identified under solicitation number W912DY26RA086, is a total set-aside for Economically Disadvantaged Women-Owned Small Businesses (EDWOSB). The scope involves comprehensive sampling of facility exteriors, roofs, and basements or crawl spaces, followed by laboratory testing and the submission of individual Pre-Demolition Assessment Reports. These reports must detail the findings of the site investigation and document any areas that were inaccessible during the survey. The work falls under NAICS code 238910 for Site Preparation Contractors and PSC P400 for Salvage-Demolition of Buildings.
The response deadline for this solicitation is June 4, 2026. The contract includes three attachments: the primary solicitation document, a Performance Work Statement, and a price spreadsheet. Administrative oversight is provided by the Department of the Army, with Tyrone M. Brown serving as the point of contact. All sampling field activities and subsequent laboratory analysis must be completed within the specific timeframes established in the project schedule.
Generated by Lumen AI