Name | Type | Posted | Actions |
|---|---|---|---|
Public Announcement.docx | DOCX | Dec 21, 2023 | |
Attachment J.3 - J.11 Battery Technical Exhibits A-I_revised.xlsx | XLSX | Jul 28, 2023 | |
Attachment J.13 Data Item Description.docx | DOCX | Jul 28, 2023 | |
Attachment J.19 Example DC Systems RFQ.xlsx | XLSX | Jul 28, 2023 | |
Attachment J.21 BVM Requirements.docx | DOCX | Jul 28, 2023 | |
Attachment J.22 Example BVM Survey Report.pdf | Jul 28, 2023 | ||
Attachment J.23 Example BVM Design Package.pdf | Jul 28, 2023 | ||
Attachment J.24 Relevant Experience.docx | DOCX | Jul 28, 2023 | |
Attachment J.26 Sample Client Auth Ltr.docx | DOCX | Jul 28, 2023 | |
Attachment J.12 Contract Data Requirements List.pdf | Jul 28, 2023 | ||
Attachment J.2 - GNAS Equipment Characteristics_revised.docx | DOCX | Jul 28, 2023 | |
Questions_Answers.pdf | Jul 28, 2023 | ||
Attachment J.17 FAA Forms 3900-17 and 3900-18.pdf | Jul 10, 2023 | ||
Attachment J.1 Pricing.xlsx | XLSX | Jul 10, 2023 | |
Attachment J.2 - GNAS Equipment Characteristics.docx | DOCX | Jul 10, 2023 | |
J.29 BIL Data Report.xlsx | XLSX | Jul 10, 2023 | |
Attachment J.3 - J.11 Battery Technical Exhibits A-I.xls | XLS | Jul 10, 2023 | |
Attachment J.20 Example UPS Battery RFQ.xlsx | XLSX | Jul 10, 2023 | |
6973GH-23-R-00094.pdf | Jul 10, 2023 | ||
Attachment J.15 BAT SYS TEST PROC.docx | DOCX | Jul 10, 2023 | |
Attachment J.18 Program Management Report.xlsx | XLSX | Jul 10, 2023 | |
Attachment J.27 Battery Equip Charact Comp Review.xlsx | XLSX | Jul 10, 2023 | |
Attachment J.16 Test Data Sheets.pdf | Jul 10, 2023 | ||
Attachment J.25 Past Performance Questionnaire.docx | DOCX | Jul 10, 2023 | |
Attachment J.14a Battery Replacement Contractor Acceptance Inspection Checklist.docx | DOCX | Jul 10, 2023 | |
Attachment J.14b DC BUS & VOR Installation Battery Monitoring System UXTM CAI Checklist.docx | DOCX | Jul 10, 2023 | |
Attachment J.28 SOW.docx | DOCX | Jul 10, 2023 |
GNAS Battery System Equipment and Replacement
Contact and place of performance
Stefanie Wiles
Not specified
*** This requirement has been awarded. Please see attachments for award information.*** **Questions and Answer are posted with revised J.2 and J.3 through J.11.** This is the formal soliciation posting. Questions are due 07/17/2023 at 2:00 PM CDT. Questions must be email to the Contracting Officer, Stefanie Wiles at [email protected]. The Federal Aviation Administration (FAA) has a requirement for supply, replac...
View moreThe Federal Aviation Administration (FAA) issued solicitation 6973GH-23-R-00094 to establish a requirement for the supply, replacement, and repair of battery systems at National Air Space facilities throughout the United States and its territories. This procurement, classified under NAICS 335910 for Battery Manufacturing and PSC 6140 for Rechargeable Batteries, was designated as a Small Business Administration (SBA) set-aside. The FAA anticipated awarding multiple-award contracts utilizing both Firm Fixed-Price and Labor Hour pricing arrangements to ensure the continued operational readiness of the National Air Space infrastructure.
The scope of work encompasses all labor and materials necessary for battery system equipment and replacement services as detailed across 27 attachments, which include technical exhibits, data item descriptions, and battery voltage monitoring requirements. The solicitation process required offerors to be registered in the System for Award Management at the time of proposal submission. The deadline for responses was September 11, 2023, following a formal question-and-answer period that concluded in July 2023. This requirement has since been awarded, and the contracting office for this effort is the 6973GH Franchise Acquisition Services.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.