Name | Type | Posted | Actions |
|---|---|---|---|
PUBLIC 36C77026R0006 0002.pdf | Jun 9, 2026 | ||
36C77026R0006 0002.pdf | Jun 4, 2026 | ||
36C77026R0006 000115 MAY.docx | DOCX | May 15, 2026 | |
Attachment 1 - Past Performance 36C77026R0006.docx | DOCX | May 15, 2026 | |
SPECIFICATIONS.pdf | May 12, 2026 | ||
36C77026R0006_2.docx | DOCX | May 12, 2026 | |
03a - 762-24-101 FCA Drawings.pdf | May 12, 2026 | ||
DAVIS BACON - TUCSON 1-2-26.pdf | May 12, 2026 | ||
03c - 762-24-101 FCA Topo.pdf | May 12, 2026 | ||
03d - 762-24-101 FCA Geotech.pdf | May 12, 2026 |
Y1EZ--Correct FCA Deficiencies Construction -Amendment
The Department of Veterans Affairs is seeking proposals for a firm-fixed-price construction project to fix Facility Condition Assessment (FCA) deficiencies and upgrade physical security at the Consolidated Mail Outpatient Pharmacy (CMOP) in Tucson, Arizona. Work includes installing an Essential Electrical System (EES), emergency generators, and underground fuel tanks, along with modifications to loading docks, HVAC systems, and roofing. The contractor will manage all project phases from site preparation to commissioning while the facility remains operational 24/7. Technical documentation includes architectural and engineering drawings, a topographic survey, and a geotechnical evaluation. Site constraints require over-excavation due to unsuitable on-site soils. Administrative requirements include a 15% self-performance threshold for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) and specific certifications for key personnel, including USACE Construction Quality Management (CQM) and OSHA 30-hour training. Proposals are due July 16, 2026, following an extension in Amendment 0002. Official responses to questions are expected around June 25, 2026. Performance will occur at the Southern Arizona VA Medical Center CMOP and must follow Davis-Bacon Act wage determinations for Pima County. Solicitation 36C77026R0006 is for a firm-fixed-price project to address Facility Condition Assessment (FCA) deficiencies and security upgrades at the Tucson CMOP. Project 762-24-101 covers all construction phases while maintaining 24/7 facility operations. The work includes a base bid and three alternates. The project involves firm-fixed-price construction to fix FCA deficiencies and upgrade physical security at the Tucson CMOP. The contractor is responsible for labor, materials, e…
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Billie Jo Cherico (Contractor)
Tucson, AZ 85706
USA
Correct FCA Deficiencies Construction - Solicitation
The contractor shall be responsible for all aspects of the project and each phase shall be subject to VA approval at designated project milestones. This project includes (but not limited to) all labor, materials, supplies, equipment, services, training, lighting, communications, security, operation and maintenance manuals, as built drawings, permits (if necessary), construction, installation, and commissioning.