Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Sep 10, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Sep 10, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Sep 10, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911S225U1989¬iceType=CombinedSynopsisSolicitation | LINK | Sep 10, 2025 |
Physical Training Outdoor Shelter
Contact and place of performance
Alexander Cho
98433
Item:PT ShelterBrand Name:Part Number:Salient Characteristics:The PT shelter needs to provide at/or around 1,600 square feet or40x40ft of covered space for operational, training, or storage requirements. It needs to havea weatherproof frame and a UV-resistant, waterproof, and fire-retardant canopy, for use inadverse conditions. The shelter should be deployable in 2?3 hours by 4?6 personnelwithout heavy equipment and...
View moreThe Department of the Army, through the MICC-Fort Drum, issued this combined synopsis/solicitation under solicitation number W911S225U1989 for a Physical Training (PT) outdoor shelter. This procurement is designated as an SBA (SBA) set-aside. The requirement is classified under NAICS 321991, Manufactured Home (Mobile Home) Manufacturing, and PSC 5411, Rigid Wall Shelters. All responses are due by September 18, 2025, and are directed to the point of contact, Alexander Cho.
The requested shelter must provide approximately 1,600 square feet of covered space, measuring 40 by 40 feet with a peak height between 14 and 16 feet, to support operational, training, or storage requirements. The unit must feature a corrosion-resistant frame and a UV-resistant, waterproof, and fire-retardant canopy capable of withstanding 50 to 60 mph sustained wind loads and moderate snow accumulation. Design specifications require the system to be deployable within two to three hours by four to six personnel without the use of heavy equipment.
For transport and scalability, the shelter must break down into palletized, forklift-compatible kits and maintain modular scalability to allow for expanded coverage by connecting multiple units. This acquisition was published on September 10, 2025, and updated on September 11, 2025, with no attachments provided in the notice.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.