EXTEND THE PERIOD OF PERFORMANCE |!#^FOR CONTRACT NUMBER |!#^70Z04025D51568Y00, FOR THE PERIOD |!#^OF JUNE 1, 2026 THRU NOVEMBER 30, |!#^2026. MAINTENANCE CONTRACT FOR FAR-8 |!#^PERIOD OF 6 MONTHS.
THE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, MATERIALS, AND SUPERVISION OF ITS EMPLOYEES TO PERFORM THE SERVICE REQUIREMENTS UNDER THIS CONTRACT FOR FORT WORDEN POST CEMETERY, IN ACCORDANCE WITH ATTACHED PERFORMANCE WORK STATEMENT (PWS).
THE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, MATERIALS, AND SUPERVISION OF ITS EMPLOYEES TO PERFORM THE SERVICE REQUIREMENTS UNDER THIS CONTRACT FOR FORT WORDEN POST CEMETERY, IN ACCORDANCE WITH ATTACHED PERFORMANCE WORK STATEMENT (PWS).
CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO REPLACE THE EXISTING LEAKING HOT WATER EXPANSION TANK FEEDING THE POTABLE HOT WATER LOOP.
THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO REMOVE THE EXISTING HVAC SYSTEMS AT THE BFC BUILDING 241 AND INSTALL A NEW 8.5-TON RTU HEAT PUMP SERVICING THE WHOLE BUILDING.
LEVEL III TESSERA - PN 30273838, CONTRACTORS SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO REPLACE THE EXISTING DUAL TEMP PIPING LOCATED ABOVE THE DRYWALL CEILINGS AT THE WEST SIDE OF THE FIRST FLOOR OF STEUBEN HALL.
CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO REMOVE THE EXISTING 2ND AND 3RD FLOOR DRYERS AND INSTALL NEW STACKED WASHERS AND DRYERS AT LAFAYETTE HALL BLDG 217.
INVESTIGATE AND CONDUCT EMERGENCY REPAIR TO THE SANITARY SEWER LINE IN THE PARKING LOT OF THE AUTO HOBBY SHOP (BLDG. 162) AT TRAINING CENTER YORKTOWN, YORKTOWN VA.
FURNISH LABOR, MATERIALS, TOOLS, AND EQUIPMENT TO REPLACE MULCH AREA WITH PEBBLEFLEX OR COMPARABLE SURFACE AT THE MINOR AID LAB TRAINING MOCK-UP, BUILDING 256.
LEVEL 3 PROJECT #21777505 THE CONTRACTOR SHALL FURNISH LABOR, MATERIALS, TOOLS, AND EQUIPMENT TO REPLACE THE LIBERTY LOUNGE AWNING AT WASHINGTON AUDITORIUM BUILDING 166 AT TRAINING CENTER YORKTOWN, YORKTOWN, VA.