• ⌘ + K
  • Home
  • 0
    Inbox
Explore
  • Browse All
  • Health
  • FedCiv
  • Defense
  • Events
Work
  • Teaming Hub
  • Watchlists
  • Bookmarks
  • Notes
Research
  • Grants
    • Contracts
    • Vehicles
    • OTAs
    • OTIDVs
    • DLA DIBBS
    • SBIR/STTR
  • Agencies
  • NAICS
  • PSC
  • DOGE Tracker

Federal Contract Awards

32awards

Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.

Awardee
is
LP4JTPZRJ8L5
Award ID
Description
Recipient
Total Value
Awarding Agency
Funding Agency
Set Aside
NAICS
PSC
Award Date
Start Date
End Date
80KSC026P0005
EVENT SEQUENCE DIAGRAMS (ESD) TO ASSESS RISK LEVELS FOR LAUNCH VEHICLES WITH NUCLEAR PAYLOADS.ASCA, INC$562,148NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541330Engineering ServicesAR14SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; R&D ADMINISTRATIVE EXPENSESApr 28, 2026Apr 27, 2026May 31, 2027
80KSC025PA003
LAUNCH VEHICLE PROBABILISTIC RELIABILITY RISK ANALYSIS SERVICES.ASCA, INC$811,568NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541330Engineering ServicesAR14SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; R&D ADMINISTRATIVE EXPENSESApr 2, 2025Apr 1, 2025Jul 31, 2026
80NSSC25PA647
PROBABILISTIC RISK ASSESSMENTASCA, INC$77,365NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—561210Facilities Support ServicesAJ11GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; BASIC RESEARCHMar 3, 2025Mar 3, 2025Jul 3, 2025
80NSSC24PC473
PRELIMINARY PROBABILISTIC RISK ASSESSMENT FOR THE DRAGONFLY MISSION IN SUPPORT OF NUCLEAR SAFETY DATABOOKASCA, INC$244,304NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)AC31NATIONAL DEFENSE R&D SERVICES; DEFENSE-RELATED ACTIVITIES; BASIC RESEARCHSep 20, 2024Sep 20, 2024Dec 20, 2024
80NSSC24PB539
BLUE ORIGIN CHAPTER 8 MMDB PRAASCA, INC$80,130NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—561210Facilities Support ServicesX1AALEASE/RENTAL OF OFFICE BUILDINGSJun 18, 2024Jun 13, 2024Aug 13, 2024
80NSSC23PA996
LSP/ASCA TASK ORDER FOR LOX/LNG STUDIESASCA, INC$167,376NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)AJ11GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; BASIC RESEARCHApr 27, 2023Apr 26, 2023Feb 29, 2024
80NSSC22PA756
ASCA LOX/LNG STUDIESASCA, INC$187,059NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)AJ11GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; BASIC RESEARCHMay 10, 2022May 10, 2022Jun 15, 2024
80NSSC19C0192
INTEGRATED MODEL-BASED FAULT-MANAGEMENT SYSTEM DESIGN (IMFSD)ASCA, INC$754,437NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCHAug 13, 2019Aug 13, 2019Aug 12, 2021
80KSC019F0184
TASK 5 SUB-TASK 6.9: TELECONS AND MINOR ASSESSMENTS FINAL FOR MARS 2020ASCA, INC$27,756NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541330Engineering ServicesR425SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICALJul 30, 2019Jul 30, 2019Aug 31, 2020
80KSC019F0043
MODEL ANALYSIS CONTRACTOR IS AUTHORIZED TO PERFORM TASK 7 ATTACHED TASKS: 1. TASK 7 SUB-TASK 7-1: SPECIAL TASK RELATED MODELING AND ANALYSIS - $12,489.95 PERIOD OF PERFORMANCE (12/19/18 TO 01/31/19) 2. TASK 7 SUB-TASK 7-4: FINAL DATA GENERATION/STUDIES/BRIEFING - $12,918.70 PERIOD OF PERFORMANCE (12/19/18 TO 01/31/19)ASCA, INC$72,130NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541330Engineering ServicesR425SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICALDec 19, 2018Jan 19, 2018Mar 29, 2019
80KSC018F0257
PRELIMINARY UPDATE AND QUANTIFICATION AND REPORT FALCON, FINAL UPDATE AND QUANTIFICATION AND REPORT FALCON 9, PRELIMINARY UPDATE AND QUANTIFICATION AND REPORT FALCON HEAVY, AND NEW LV MULTI-MISSION DATABOOK: OMEGAASCA, INC$663,648NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541330Engineering ServicesR425SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICALSep 19, 2018Sep 19, 2018Sep 30, 2022
80NSSC18P2108
AN INTEGRATED MODEL-BASED FAULT-MANAGEMENT SYSTEM DESIGN (IMFSD) ENVIRONMENT FOR CURRENT-GENERATION AND FUTURE HIGH-AUTONOMY SPACE SYSTEMS IS DEVELOPED, WHICH INTEGRATES AND DOCUMENTS IN ONE PLATFORM FRAMEWORK FAULT MANAGEMENT (FM) DESIGN PROCESSES, MODELS AND PRODUCTS. THE IMFSD COVERS FM REQUIREMENTS DEFINITION, AND DESIGN SPECIFICATION, ANALYSIS, VALIDATION-AND-VERIFICATION (V&V), AND DOCUMENTATION, ENABLING THE CONNECTION OF THE ASSOCIATED PROCESSES AND MODELS TO THE CORRESPONDING ELEMENTS OF THE HOST SPACE SYSTEM MODEL-BASED DESIGN. THE INTEGRATION OF FM DEVELOPMENT LIFE-CYCLE PROCESSES IS ACHIEVED BY MEANS OF A DESIGN DEVELOPMENT, DOCUMENTATION, AND ASSURANCE CASE (D3AC) LOGIC STRUCTURE HOSTED WITHIN THE IMFSD SOFTWARE PLATFORM, WHICH PROVIDES ACTIVE CONNECTIVITY AMONG ALL ELEMENTS OF THE FM DESIGN, AND WITH THE EVIDENCES PRODUCED TO DEMONSTRATE COMPLIANCE WITH CONCEPT-OF-OPERATIONS (CONOPS) AND REQUIREMENTS. IN VIEW OF EXPECTED SPACECRAFT-AUTONOMY EVOLUTIONS FOR WHICH EXPANDED FM OPERATIONAL CAPABILITY AND ANALYTICS WILL BE NEEDED, THE IMFSD, IN ADDITION TO ESTABLISHED FM MODELS LIKE FAULT TREE ANALYSIS (FTA) AND FAILURE MODES AND EFFECTS ANALYSIS (FMEA), INCLUDES, OR LINKS TO, LOGIC-DYNAMIC MODELS E.G., DYNAMIC FLOWGRAPH METHODOLOGY (DFM) AND MARKOV CELL-TO-CELL MAPPING TECHNIQUE (MARKOV- CCMT) THAT CAN EXTEND FM ANALYSIS INTO THE TIME-DEPENDENT-LOGIC DOMAIN. OTHER POTENTIALLY APPLICABLE STATE-OF-THE-ART MODELS FROM THE FIELD OF MACHINE-LEARNING, LIKE BAYESIAN BELIEF NETWORKS (BBN), NEURAL NETWORKS (NN), FUZZY LOGIC (FL, AND INFLUENCE DIAGRAMS (ID), ARE ALSO EVALUATED FOR EVOLUTIONARY INCLUSION IN THE IMFSD. ONCE DEMONSTRATED FOR NASA APPLICATIONS, THE IMFSD WILL BE TRANSFERABLE TO THE DESIGN OF FM FOR THE HIGH-AUTONOMY COMMERCIAL SYSTEMS THAT ARE PRESENTLY BEING DEVELOPED IN THE AERONAUTICAL AND TRANSPORTATION FIELDS. THIS PROVIDES A PATH FOR COMMERCIALIZATION EFFORTS THAT WILL BE INITIATED DURING EXECUTION OF THE PHASE I DEVELOPMENT PROJECT.ASCA, INC$124,804NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCHJul 27, 2018Jul 27, 2018Feb 15, 2019
80KSC017F0034
IGF::OT::IGFPROBABILITY ANALYSIS FOR MARS2020ASCA, INC$132,835NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541330Engineering ServicesR425SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICALAug 1, 2017Aug 1, 2017Sep 19, 2017
NNK17LA04D
IGF::OT::IGF LAUNCH VEHICLE PROBABILISTIC RELIABILITY ANALYSIS TASKS 7 -7.4, CUBESAT MODELINGASCA, INC$35,074NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541330Engineering ServicesR425SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICALNov 22, 2016Nov 22, 2016Sep 30, 2017
NNK17LA03D
IGF::OT::IGF LAUNCH VEHICLE PROBABILISTIC RELIABILITY ANALYSIS TASK 5, CHAPTER 8 PRA FINAL REPORT PREP AND SUPPORT.ASCA, INC$533,641NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541330Engineering ServicesR425SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICALNov 1, 2016Nov 1, 2016Aug 31, 2020
NNK16LB36D
IGF::OT::IGF LAUNCH VEHICLE PROBABILISTIC RELIABILITY ANALYSIS TASK 5, DEMONSTRATION AND TESTING OF EXECUTABLE MODELASCA, INC$301,744NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541330Engineering ServicesR425SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICALAug 31, 2016Aug 31, 2016Feb 28, 2018
NNK16LA85D
IGF::OT::IGF LAUNCH VEHICLE PROBABILISTIC RELIABILITY ANALYSIS TASK 7, DEMONSTRATION AND TESTING OF EXECUTABLE MODELASCA, INC$83,363NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541330Engineering ServicesR425SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICALJun 22, 2016Jun 22, 2016Sep 30, 2021
NNK16LA01D
IGF::OT::IGF LAUNCH VEHICLE PROBABILISTIC RELIABILITY ANALYSIS TASK 1A, ATLAS V 2ND STAGE EARTH ORBIT CATASTROPHIC FAILURE PROBABILITIES.ASCA, INC$40,179NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541330Engineering ServicesR425SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICALNov 5, 2015Nov 5, 2015Jan 15, 2016
NNK15LB03D
IGF::OT::IGF LAUNCH VEHICLE PROBABILISTIC RELIABILITY ANALYSIS SUB-TASKS: 7-1,7-2,7-3, 7-4 FOR A SINGLE EXECUTABLE PRA MODELASCA, INC$69,700NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541330Engineering ServicesR425SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICALSep 1, 2015Sep 1, 2015Apr 30, 2019
NNK15LB04D
IGF::OT::IGF LAUNCH VEHICLE PROBABILISTIC RELIABILITY ANALYSIS SUB-TASKS: SUB-TASK 3F-1 DEVELOP FALCON 9 HEAVY LV PRA MODEL, FIRST TIME MODEL SETUP, $55,778.16 SUB-TASK 3F-2 PRELIMINARY UPDATE TO FALCON HEAVY CONFIGS. $85,190.00 TASK 3 SUB-TASK 1G-1 DEVELOP NEW LV PRA MODEL, FIRST TIME MODEL SETUP, $55,778.16 TASK 3 SUB-TASK 1G-2 PRELIMINARY ESDS QUANTIFICATION AND SUMMARY REPORT, $105,908.30ASCA, INC$209,950NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541330Engineering ServicesC219ARCHITECT AND ENGINEERING- GENERAL: OTHERAug 28, 2015Aug 28, 2015Jul 8, 2016
NNK15LA24D
IGF::OT::IGF LAUNCH VEHICLE PROBABILISTIC RELIABILITY ANALYSIS SUB-TASKS: 3E-3ASCA, INC$45,716NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541330Engineering ServicesC219ARCHITECT AND ENGINEERING- GENERAL: OTHERMar 26, 2015Mar 26, 2015Nov 16, 2015
NNK15LA16D
IGF::OT::IGF LAUNCH VEHICLE PROBABILISTIC RELIABILITY ANALYSIS SUB-TASKS: SUB-TASK 6-1 DEVELOP NON-US LV PRA MODEL, FIRST TIME MODEL SETUP SUB-TASK 7-2 PRELIMINARY DATA GENERATION/STUDIES/BRIEFING PREPARATION SUB-TASK 7-3 RESOLVE COMMENTS SUB-TASK 7-4 FINAL DATA GENERATION/STUDIES/BRIEFINGASCA, INC$86,753NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541330Engineering ServicesC219ARCHITECT AND ENGINEERING- GENERAL: OTHERNov 25, 2014Nov 25, 2014Nov 16, 2015
NNK15LA03D
IGF::OT::IGF LAUNCH VEHICLE PROBABILISTIC RELIABILITY ANALYSIS TASK 5A-6.7, TELECONS AND MINOR ASSESSMENTS PRELIMINARY.ASCA, INC$25,400NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541330Engineering ServicesR425SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICALNov 14, 2014Nov 14, 2014Jul 31, 2016
NNA14AB55C
IGF::OT::IGF NASA RESEARCH ANNOUNCEMENT (NRA) FOR SOFTWARE INTENSIVE SYSTEMS: VERIFICATION AND VALIDATION OF MODEL-BASED AND ADAPTIVE SYSTEMSASCA, INC$1,178,761NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541712AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCHSep 26, 2014Oct 1, 2014Dec 31, 2017
NNH11CD84D
THIS ACQUISITION IS FOR THE DEVELOPMENT OF INSTITUTIONAL CAPABILITIES IN SOFTWARE RISK ASSESSMENT MODELING AND CONSIDERATION OF SOFTWARE RISK IN FORMULATION OF ASSURANCE ACTIVITIES.ASCA, INC$0NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541330Engineering ServicesR425SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICALSep 22, 2011Sep 22, 2011Dec 31, 2014
Page 1 of 2
  • Previous
  • Next