JAMA IV IDIQ Pilot Parts Program - Federal Contract Opportunity
Analysis of Federal Contract Opportunity Solicitation #: SP4701-25-R-0001 by G2X Lumen AI
Key Information
- Notice ID
- NAICS Code
- Agency
- DEPT OF DEFENSE
- Response Deadline
- July 10, 2025
- Type
- Solicitation
Executive Summary
Executive Summary
This analysis pertains to a contract opportunity with NAVAIRLKE BL41200 for the provision of engineering data related to the Fuel Cell Interconnector PIN 4124AS1137-1 and the CH-53E E-Bay Handle PIN 4124AS1139-1. The data requirements include inspection reports, process & material certifications (Initial Material Qualification (IMQ), Installation Qualification (IQ), Operational Qualification (OQ), Process Control Document (PCD)), and First Article Inspection Reports. The submissions must be delivered in both paper and electronic formats (PDF).
The contractor will be required to provide these data items according to specified timelines following the contract award or approval of the First Article Test Inspection. All data items are to be submitted to [email protected]. These requirements are based on the Statement of Work (SOW) sections related to quality inspection and testing and process and material certifications.
Detailed Analysis
Detailed Analysis
Agency and Opportunity Overview
- Agency: NAVAIRLKE BL41200
- Opportunity Type: Contract Data Requirements List (CDRL) for Engineering Data
- System/Item:
- Fuel Cell Interconnector PIN 4124AS1137-1
- CH-53E E-Bay Handle PIN 4124AS1139-1
Objectives and Requirements
The government's objective is to obtain specific engineering data to ensure quality and compliance for the Fuel Cell Interconnector and CH-53E E-Bay Handle. Key technical requirements include:
- Inspection Report (DI-NDTI-80809): A paper and electronic (PDF) copy of the inspection report is due with the delivery of each production item. Authority is from NAVAIR PDDSs 4124AS1117, 4124AS1127, 4124AS1137, and the requirement is referenced in SOW 3.3.5, Quality Inspection and Testing.
- Process & Material Certifications (DI-MISC-82386/T3):
- Initial Material Qualification (IMQ): An electronic copy of a report supporting IMQ is due 60 days after contract award. This is only required if deviating from Additive Manufacturing Process Description indentified in NAVAIR Drawing package for PIN 4124AS139-1. Authority is from NAWCADLKE-BL41200-DDR-001 Section 5.1, and the requirement is referenced in SOW 3.3.7, Process & Material Certifications.
- Installation Qualification (IQ): An electronic copy of a report supporting IQ is due 15 days after contract award. Authority is from NAWCADLKE-BL41200-DDR-001 Section 5.2.1, and the requirement is referenced in SOW 3.3.7, Process & Material Certifications.
- Operational Qualification (OQ): An electronic copy of a report supporting OQ is due 15 days after contract award. Authority is from NAWCADLKE-BL41200-DDR-001 Section 5.2.2, and the requirement is referenced in SOW 3.3.7, Process & Material Certifications.
- Process Control Document (PCD): An electronic copy of the PCD is due 15 days after approval of the First Article Test Inspection. Authority is from NAWCADLKE-BL41200-DDR-001 Section 5.3, and the requirement is referenced in SOW 3.3.7, Process & Material Certifications.
- First Article Inspection Report (DI-NDTI-82327): An electronic copy of the FAT report is due 60 days after contract award. Authority is from NAWCADLKE-BL41200-DDR-001 Section 5.2.3, and the requirement is referenced in SOW 3.3.5, Quality Inspection and Testing.
Submission Guidelines and Timeline
- Format: All electronic copies must be in portable document format (PDF). The Inspection Report must be submitted in both paper and electronic format.
- Delivery: All submissions should be sent to [email protected].
- Deadlines:
- Inspection Report: Due with the delivery of each production item.
- Initial Material Qualification (IMQ) Report: 60 days after contract award.
- Installation Qualification (IQ) Report: 15 days after contract award.
- Operational Qualification (OQ) Report: 15 days after contract award.
- Process Control Document (PCD): 15 days after approval of the First Article Test Inspection.
- First Article Inspection (FAT) Report: 60 days after contract award.
Evaluation and Acquisition Strategy
- The provided documentation does not explicitly state the contract type or set-aside considerations.
- The estimated total price for each data item is not specified in the provided documentation.
Frequently Asked Questions
Ready to Add This Federal Contract Opportunity to Your Pipeline?
Get full access to opportunity tracking, teaming partners, and AI-powered insights on G2X
Track Updates
Real-time amendments and Q&A
Find Partners
Connect with prime contractors
Download Documents
Access all solicitation files
Pipeline Tracking
Manage opportunities in your G2X pipeline