Name | Type | Posted | Actions |
|---|---|---|---|
https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N0010425QNF080004 | LINK | Jun 9, 2026 | |
https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N0010425QNF080003 | LINK | May 7, 2026 | |
https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N0010425QNF080002 | LINK | Mar 24, 2026 | |
013694877-N0010425QNF08-DWG-02-06-26.pdf | Feb 11, 2026 | ||
https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N0010425QNF080001 | LINK | Jan 7, 2026 | |
https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N0010425QNF08 | LINK | Nov 4, 2025 |
CABLE ASSEMBLY,SPEC
CABLE ASSEMBLY,SPEC
Contact and place of performance
Telephone: 7176051552
Not specified
No narrative description provided for this notice.
The Department of the Navy, NAVSUP Weapon Systems Support (WSS) Mechanicsburg, is soliciting the manufacture and delivery of a specialized cable assembly under solicitation number N0010425QNF08. This procurement is a total small business set-aside under NAICS 335311 (Power, Distribution, and Specialty Transformer Manufacturing) and PSC 6150 (Miscellaneous Electric Power and Distribution Equipment). The requirement is being conducted pursuant to Emergency Acquisition Flexibilities, and the resultant bilateral award will carry a DO priority rating for national defense under the Defense Priorities and Allocations System.
The scope of work involves the manufacture of the cable assembly according to specific drawing and design requirements, including Drawing 5854902. Contractors must maintain a quality system in accordance with ISO 9001 or MIL-I-45208 standards and adhere to strict configuration control protocols. Due to the intended use on submarines and surface ships, all materials must be mercury-free and protected against mercury contamination. A one-year warranty from the date of delivery is required for all supplies.
The response deadline for this solicitation is July 8, 2026. Required delivery for the primary item is scheduled for 323 days after award. Inspection and acceptance will be performed by the government at a location to be determined, and payment will be processed through Wide Area Workflow. Technical documentation for the requirement is managed through 12 specific drawing references and several military standards, with one drawing attachment provided as of February 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.