• ⌘ + K
  • Home
  • 0
    Inbox
Explore
  • Browse All
  • Health
  • FedCiv
  • Defense
  • Events
Work
  • Teaming Hub
  • Watchlists
  • Bookmarks
  • Notes
Research
  • Grants
    • Contracts
    • Vehicles
    • OTAs
    • OTIDVs
    • DLA DIBBS
    • SBIR/STTR
  • Agencies
  • NAICS
  • PSC
  • DOGE Tracker

Federal Contract Vehicles

4vehicles

Track IDIQs, BPAs, and ordering channels, watch vehicle activity for new transactions, and identify where future task-order pursuits may flow.

Awardee
is
LH8MUSNB3SF1
Reference IDV
Awardee
Description
Vehicle Type
Ceiling
Awarding Agency
Funding Agency
Set Aside
NAICS
PSC
Award Date
Start Date
Last Date to Order
80GSFC20A0019
EMS THIN METAL PARTS LLCSB SET-ASIDE, 42 OFFERS.BPA VENDORS SHALL PROVIDE FABRICATION SERVICES AT VENDORS SITE&SUPPLIES TO GSFC IN THEIR RESPECTIVE AREAS OF EXPERTISE FOR THE DEVELOPMENT OF INSTRUMENTS SPACE FLIGHT&NON-SPACEFLIGHT HARDWARE INTERCHANGEABLE PIECE PARTS. .BPA$0NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—332999All Other Miscellaneous Fabricated Metal Product Manufacturing1675SPACE VEHICLE COMPONENTSMay 15, 2020May 15, 2020Apr 15, 2025
NNG14LN78Z
EMS THIN METAL PARTS LLC—BPA$0NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—332710Machine ShopsAZ15Aug 15, 2014Aug 15, 2014May 14, 2020
NNG09CP41Z
EMS THIN METAL PARTS LLCCOMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.BPA$5,000,000NATIONAL AERONAUTICS AND SPACE ADMINISTRATION—SBA332999All Other Miscellaneous Fabricated Metal Product ManufacturingAZ15Aug 18, 2009Aug 18, 2009Aug 17, 2014
NNG08LA21Z
EMS THIN METAL PARTS LLCCOMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.BPA$5,000,000NATIONAL AERONAUTICS AND SPACE ADMINISTRATION——332999All Other Miscellaneous Fabricated Metal Product ManufacturingAZ15Apr 29, 2008Apr 29, 2008Jul 14, 2009
Page 1 of 1
  • Previous
  • Next