| | MCM-9 2A AND 2B MPDE DUPLEX FUEL FILTER ENCLOSURE REPAIR, FLEXIBLE HOSE ASSEMBLY ON PORT MRG; REPLACE, FLEXIBLE HOSE ASSEMBLY ON CPP HYDRAULIC SYSTEM; REPLACE, NO.2 SSDG DUPLEX FUEL FITER ENCLOSURE; REPAIR, NO.2 MP AC; REPAIR | YAMAGUCHI MACHINERY CO.,LTD. | $49,856 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Mar 10, 2026 | Mar 13, 2026 | May 31, 2026 |
| | LHA-7 38DJA51602_00_A01 EVAPORATOR COIL OF NO.5 UNIT COOLER IN FREEZE STOREROOM; REPLACE | YAMAGUCHI MACHINERY CO.,LTD. | $59,571 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Mar 10, 2026 | Mar 10, 2026 | Jul 31, 2026 |
| | LHA-7, CABLE TRUNK COVER FASTENER HOLE ON FORE AND MAIN MAST; REPAIR BONDING STRAP FOR AS-4454/KSQ ANTENNA (3-44B); INSTALL BONDING STRAP FOR EPLRS RF-3143SP ANTENNA (3-19); INSTALL BONDING STRAP FOR EPLRS RF-3143SP ANTENNA (3-39); INSTALL | YAMAGUCHI MACHINERY CO.,LTD. | $72,937 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Mar 9, 2026 | Mar 9, 2026 | Jul 31, 2026 |
| | LHA-7 FLEXIBLE HOSE ASSEMBLY FOR CENTRIFUGAL PURIFIER; FABRICATE | YAMAGUCHI MACHINERY CO.,LTD. | $13,257 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Mar 9, 2026 | Mar 9, 2026 | Jul 31, 2026 |
| | SEE SECTION B FOR DESCRIPTION. | YAMAGUCHI MACHINERY CO.,LTD. | $26,416 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Mar 6, 2026 | Mar 6, 2026 | Jul 31, 2026 |
| | MCM-9 38KPA25202_00_A01 CABLE FOR NO.1B SSDG; REPLACE | YAMAGUCHI MACHINERY CO.,LTD. | $34,804 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Feb 19, 2026 | Feb 19, 2026 | May 31, 2026 |
| | LPD-22 C1 STERN GATE PRESERVATION AND GASKET REPLACEMENT ACCOMPLISH, C2 HINGE FOR LOWER STERN GATE REPAIR, C3ELM-255105 FOR 5-143-0-Q STERN GATE REPAIR ACCOMPLISH | YAMAGUCHI MACHINERY CO.,LTD. | $783,245 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Feb 12, 2026 | Feb 13, 2026 | Sep 30, 2026 |
| | USS SAN DIEGO (LPD22) 38DX255101-00-A01 | YAMAGUCHI MACHINERY CO.,LTD. | $65,622 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Feb 6, 2026 | Feb 6, 2026 | Sep 30, 2026 |
| | USS SAN DIEGO (LPD-22)
1A 1B 2A 2B 2C 1C SEWAGE EJECTOR PUMP ASSEMBLY AND FLAPPER; REPLACE 1B SEWAGE EJECTOR PUMP ASSEMBLY AND FLAPPER; REPLACE | YAMAGUCHI MACHINERY CO.,LTD. | $187,228 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Jan 30, 2026 | Jan 30, 2026 | Jul 31, 2026 |
| | LPD-22, RESCUE BOAT DAVIT PERIODIC LOAD TEST, RESCUE BOAT DAVIT REPAIR AND LOAD TEST | YAMAGUCHI MACHINERY CO.,LTD. | $191,192 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Jan 30, 2026 | Jan 30, 2026 | Sep 30, 2026 |
| | LPD-22 MACHINE SHOP LATHE ASSEMBLY 8054VS REPLACE | YAMAGUCHI MACHINERY CO.,LTD. | $13,571 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Jan 30, 2026 | Jan 30, 2026 | Sep 30, 2026 |
| | LPD-22 |!#^MAIN DRAINAGE VALVE; REPLACE | YAMAGUCHI MACHINERY CO.,LTD. | $106,340 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Jan 27, 2026 | Jan 28, 2026 | Sep 30, 2026 |
| | LPD-22, MAIN DRAINAGE VALVE (MD-V-01I); REPLACE | YAMAGUCHI MACHINERY CO.,LTD. | $42,858 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Jan 14, 2026 | Jan 14, 2026 | Jul 31, 2026 |
| | LPD-22, 2PK ICN 38DX286317_00_A01, VACUUM, COLLECTING, HOLDING AND TRANSFER SYSTEM (VCHT) PIPING IN 02-33-3-L; REPLACE | YAMAGUCHI MACHINERY CO.,LTD. | $104,277 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Jan 6, 2026 | Jan 6, 2026 | Jul 31, 2026 |
| | RESILIENT MOUNT AND EXPANSION BELLOWS; REPLACE | YAMAGUCHI MACHINERY CO.,LTD. | $7,942 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Dec 24, 2025 | Dec 24, 2025 | Jul 31, 2026 |
| | LPD-22, CPS COOLING COLL UNIT IN 2-78-2-Q; REPLACE | YAMAGUCHI MACHINERY CO.,LTD. | $13,777 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Dec 23, 2025 | Dec 24, 2025 | Sep 30, 2026 |
| | LPD-22, GATE VALVE FOR FIREMAIN SYSTEM; REPLACE | YAMAGUCHI MACHINERY CO.,LTD. | $13,980 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Dec 11, 2025 | Dec 11, 2025 | Jul 31, 2026 |
| | LPD22 38DX252108-00-A01 | YAMAGUCHI MACHINERY CO.,LTD. | $18,567 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Dec 11, 2025 | Dec 11, 2025 | Jul 31, 2026 |
| | FIREMAIN PIPING IN 2-67-1-Q AND 2-69-1-A; REPLACE | YAMAGUCHI MACHINERY CO.,LTD. | $34,921 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Nov 18, 2025 | Nov 18, 2025 | Jan 31, 2026 |
| | SEE SECTION B FOR DESCRIPTION. | YAMAGUCHI MACHINERY CO.,LTD. | $66,483 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Nov 10, 2025 | Nov 10, 2025 | Dec 30, 2025 |
| | USS NUECES (APL-40) ACCOMPLISH; PUMP OUT CHI FROM SHIP RISER TO BARGEICN: 38HZA99201_02_A03 | YAMAGUCHI MACHINERY CO.,LTD. | $125,620 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Nov 6, 2025 | Nov 6, 2025 | Feb 27, 2026 |
| | SEE SECTION B FOR DESCRIPTION. | YAMAGUCHI MACHINERY CO.,LTD. | $158,105 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Oct 29, 2025 | Oct 29, 2025 | Feb 28, 2026 |
| | SEE SECTION B FOR DESCRIPTION. | YAMAGUCHI MACHINERY CO.,LTD. | $24,972 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Oct 28, 2025 | Oct 28, 2025 | Feb 28, 2026 |
| | SEE SECTION B FOR DESCRIPTION. | YAMAGUCHI MACHINERY CO.,LTD. | $183,894 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Oct 27, 2025 | Oct 27, 2025 | Feb 28, 2026 |
| | MCM-14 SEDG SERVICE PROVIDE | YAMAGUCHI MACHINERY CO.,LTD. | $86,685 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 336611Ship Building and Repairing | J999NON-NUCLEAR SHIP REPAIR (WEST) | Sep 9, 2025 | Sep 10, 2025 | Jan 31, 2026 |