Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| DISASTER RELATED NRE-EXEMPT TROPICAL STORM ERNESTO REPAIR DESIGN (PHASE 1) | ISAIAH ENGINEERING, INC | $244,500 | FOREST SERVICE | FOREST SERVICE | — | 541330Engineering Services | C1JZARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS BUILDINGS | Sep 25, 2025 | Oct 10, 2025 | Aug 31, 2026 | ||
| R8 SRS SHORTLIST: TROPICAL STORM ERNESTO REPAIR DESIGN PHASE 2 SITE #1 - TRAIL NO. 7 (ANGELITO TRAIL) M.P. 0.047 - 3-SIDED BOX CULVERT CONSTRUCTION PROJECT SITE #2 - TRAIL NO. 18 (CAIMITILLO TRAIL) M.P. 0.00 TO M.P. 0.117 (623-LINEAR FEET) - TRAIL | ISAIAH ENGINEERING, INC | $140,937 | FOREST SERVICE | FOREST SERVICE | — | 238990All Other Specialty Trade Contractors | C1PZARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER NON-BUILDING FACILITIES | Aug 2, 2025 | Aug 18, 2025 | Jul 31, 2026 | ||
| CONSTRUCTION INSPECTION SERVICES FOR LA MINA AND BIG TREE TRAIL RECONSTRUCTION, EL PORTAL AND CATALINA WATER WELL SYSTEM, EL PORTAL SIDEWALK, LA COCA FALLS ENTRANCE STATION & PARKING LOT CONSTRUCTION, JUAN DIEGO WATERFALLS, BIG TREE TRAILHEAD, PA | ISAIAH ENGINEERING, INC | $153,585 | FOREST SERVICE | FOREST SERVICE | — | 541350Building Inspection Services | H338INSPECTION- CONSTRUCTION, MINING, EXCAVATING, AND HIGHWAY MAINTENANCE EQUIPMENT | Jul 29, 2025 | Sep 22, 2025 | Sep 21, 2026 | ||
| SERVICES FOR DESIGN SUPPORT DURING CONSTRUCTION AND SUPPLEMENTAL ENGINEERING SERVICES NECESSARY FOR FINALIZING THE PREVIOUSLY DEVELOPED PLANS AND ESTIMATE (P&E) AND OTHER SUPPORTING DOCUMENTS. | ISAIAH ENGINEERING, INC | $92,424 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Jul 9, 2025 | Jul 9, 2025 | Feb 26, 2027 | ||
| YOKAHU TOWER WASTEWATER FACILITY FIXTURES DESIGN | ISAIAH ENGINEERING, INC | $40,000 | FOREST SERVICE | FOREST SERVICE | — | 541330Engineering Services | C213ARCHITECT AND ENGINEERING- GENERAL: INSPECTION (NON-CONSTRUCTION) | Sep 17, 2024 | Sep 17, 2024 | Feb 28, 2025 | ||
| R8 SRS SHORTLIST SELECTION: A-E DESIGN PROJECT FOR PR-191 K.M. 10.4 EMBANKMENT FAILURE REPAIR (BIG TREE TRAIL HEAD) | ISAIAH ENGINEERING, INC | $123,435 | FOREST SERVICE | FOREST SERVICE | — | 541330Engineering Services | C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Apr 29, 2024 | May 13, 2024 | Nov 29, 2024 | ||
| ARCHITECT AND ENGINEERING (A/E) SERVICES PROVIDING A P.E. ENGINEER STUDY, ANALYSIS, ENGINEERING REPORT, AND REQUIRED DESIGN DELIVERABLES FOR A BACK-UP ECONOMICAL AND RESILIENT RENEWABLE/ALTERNATIVE ENERGY SOURCE TO POWER THE EYNFS EXISTING TWO (2) WA | ISAIAH ENGINEERING, INC | $232,076 | FOREST SERVICE | FOREST SERVICE | — | 541330Engineering Services | C1NEARCHITECT AND ENGINEERING- CONSTRUCTION: WATER SUPPLY FACILITIES | Jan 16, 2024 | Jan 22, 2024 | Aug 15, 2024 | ||
| TROPICAL STORM (TS) FRED VEHICULAR BRIDGE A&E DESIGN FOR THE REPAIR/RECONSTRUCTION OF A DAMAGED VEHICULAR BRIDGE ON A FOREST SERVICE ROAD IN THE CHATTAHAOOCHEE-OCONNE NATIONAL FOREST, GEORGIA. | ISAIAH ENGINEERING, INC | $149,941 | FOREST SERVICE | FOREST SERVICE | — | 541330Engineering Services | C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Aug 30, 2023 | Aug 31, 2023 | May 3, 2024 | ||
| TS FRED MISCELLANEOUS SITE DESIGNS (ORD) | ISAIAH ENGINEERING, INC | $288,414 | FOREST SERVICE | FOREST SERVICE | — | 541330Engineering Services | C214ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING | Aug 23, 2023 | Aug 23, 2023 | Apr 1, 2024 | ||
| CONSTRUCTION INSPECTION SERVICES | ISAIAH ENGINEERING, INC | $82,293 | FOREST SERVICE | FOREST SERVICE | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Jul 13, 2023 | Jul 27, 2023 | Jul 28, 2026 | ||
| CRRD ERF0 TRAIL BRIDGES GEOTECH & DESIGN PROJECT | ISAIAH ENGINEERING, INC | $221,475 | FOREST SERVICE | FOREST SERVICE | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Aug 15, 2022 | Aug 15, 2022 | May 19, 2023 | ||
| COX-MATHIS HOUSE STRUCTURAL ANALYSIS/HISTORIC REHABILITATION SERVICES (A/E CONTRACT SERVICES FOR HISTORICAL BUILDING REHAB) | ISAIAH ENGINEERING, INC | $14,904 | FOREST SERVICE | FOREST SERVICE | — | 541330Engineering Services | C1JZARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS BUILDINGS | Aug 1, 2022 | Aug 1, 2022 | Oct 4, 2022 | ||
| NFSR 10 LANDSLIDE & EL YUNQUE TRAIL FAILURE DESIGN REPAIR PROJECT A&E | ISAIAH ENGINEERING, INC | $89,057 | FOREST SERVICE | FOREST SERVICE | — | 541330Engineering Services | C1JZARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS BUILDINGS | Sep 14, 2021 | Sep 14, 2021 | Mar 31, 2022 | ||
| P-AREA WELL ACCESS STAIRWAY DESIGN | ISAIAH ENGINEERING, INC | $35,982 | FOREST SERVICE | FOREST SERVICE | — | 541310Architectural Services | C220ARCHITECT AND ENGINEERING- GENERAL: STRUCTURAL ENGINEERING | Jul 16, 2020 | Jul 16, 2020 | Sep 30, 2020 | ||
| MW EVAPORATOR ELECTRICAL AND SUBMERSIBLE PUMP WITH HOSES A-E DESIGN PROJECT | ISAIAH ENGINEERING, INC | $34,234 | FOREST SERVICE | FOREST SERVICE | — | 541330Engineering Services | C221ARCHITECT AND ENGINEERING- GENERAL: PLUMBING SYSTEMS | Apr 6, 2020 | Apr 6, 2020 | Jun 19, 2020 | ||
| DESIGN CHEMICAL LABORATORY RECONSTRUCTION | ISAIAH ENGINEERING, INC | $275,291 | FOREST SERVICE | FOREST SERVICE | — | 541330Engineering Services | C1DBARCHITECT AND ENGINEERING- CONSTRUCTION: LABORATORIES AND CLINICS | Mar 11, 2020 | Mar 11, 2020 | Aug 12, 2020 | ||
| MW DOMESTIC WATER DISTRIBUTION SYSTEM A-E DESIGN PROJECT (A-E CONTRACT) | ISAIAH ENGINEERING, INC | $41,513 | FOREST SERVICE | FOREST SERVICE | — | 541330Engineering Services | C221ARCHITECT AND ENGINEERING- GENERAL: PLUMBING SYSTEMS | May 17, 2019 | May 17, 2019 | Sep 27, 2019 | ||
| MAILROOM RENOVATION PROJECT OF MAILROOM IN ADMIN BUILDING. | ISAIAH ENGINEERING, INC | $14,002 | FOREST SERVICE | FOREST SERVICE | — | 115310Support Activities for Forestry | F099NATURAL RESOURCES/CONSERVATION- OTHER | Mar 25, 2019 | Mar 25, 2019 | May 1, 2019 | ||
| A-E CONTRACTOR DESIGN DESIGN BACK SLOPE FROM AN APPROPRIATE PE SEAL. | ISAIAH ENGINEERING, INC | $29,362 | FOREST SERVICE | FOREST SERVICE | — | 115310Support Activities for Forestry | F099NATURAL RESOURCES/CONSERVATION- OTHER | Jan 22, 2019 | Jan 22, 2019 | Apr 1, 2019 | ||
| IGF: SIERRA PALM ELECTRICAL DESIGN FOR EL YUNQUE NATIONAL FORESTS | ISAIAH ENGINEERING, INC | $15,721 | FOREST SERVICE | FOREST SERVICE | — | 541310Architectural Services | C212ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | Sep 18, 2018 | Sep 18, 2018 | Nov 15, 2018 |