Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| THIS REQUIREMENT IS SO THAT THE ARCHITECT-ENGINEER CAN PROVIDE DESIGN DRAWINGS, CONSTRUCTION COST ESTIMATES, AND CONDUCT FIELD INVESTIGATIONS TO RENOVATE AND RECONFIGURE THE MILITARY WORKING DOG OPERATIONS FACILITY. | LIBERTY JV | $702,110 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541330Engineering Services | Z2AZREPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | Jul 25, 2025 | Sep 30, 2025 | May 12, 2026 | ||
| ACQR 6100174 25 ADAK (SW) FIVE-YEAR REVIEW | LIBERTY JV | $598,042 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C215ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | Jul 8, 2025 | Jul 8, 2025 | Apr 8, 2027 | ||
| HAZMAT SURVEY IN SUPPORT OF DEMOLISHING BLDGS 368 AND 462, BREMERTON | LIBERTY JV | $77,874 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Jul 7, 2025 | Jul 7, 2025 | Dec 31, 2025 | ||
| FIVE-YEAR REVIEW FOR FORMER NAVAL AIR STATION MOFFETT FIELD, MOFFETT FIELD, CALIFORNIA. | LIBERTY JV | $162,811 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C215ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | Jul 7, 2025 | Jul 7, 2025 | Jan 8, 2027 | ||
| MUNITIONS RESPONSE PROGRAM SITE 2 - FORMER SMALL ARMS PISTOL RANGE AREA NAVAL BASE POINT LOMA, SAN DIEGO, CALIFORNIA | LIBERTY JV | $177,748 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C215ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | Jul 3, 2025 | Jul 3, 2025 | Jan 3, 2026 | ||
| FY25 WETLANDS HABITAT ASSESSMENT, MAPPING, AND RESTORATION MONITORING, NAVAL BASE KITSAP BANGOR, WA | LIBERTY JV | $401,583 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Jul 1, 2025 | Jul 1, 2025 | Jan 4, 2027 | ||
| CREATE A HABS PACKAGE FOR RANDOLPH AIR FORCE BASE BUILDING 230 IN ACCORDANCE WITH THE SOW, TO INCLUDE A HAZMAT SURVEY, IDENTIFYING HAZARDOUS MATERIALS SUCH AS LEAD-BASED PAINT AND ASBESTOS, AND ASSESSING THE NEED FOR REMOVAL BEFORE DEMOLITION | LIBERTY JV | $236,355 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541330Engineering Services | C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | Jun 27, 2025 | Jun 30, 2025 | Dec 31, 2025 | ||
| NAVFAC NW IS ACQUIRING ENVIRONMENTAL SERVICES TO INVESTIGATE THE DEBRIS LANDFILL (SITE 101-A) AS A POTENTIAL SOURCE AREA FOR CYANIDE AND MERCURY DETECTIONS AT JACKSON PARK HOUSING COMPLEX AT BREMERTON, WASHINGTON (SITE). | LIBERTY JV | $329,986 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Jun 23, 2025 | Jun 23, 2025 | Jun 23, 2027 | ||
| NAVFAC NW IS ACQUIRING ENVIRONMENTAL SERVICES TO PREPARE A PROPOSED PLAN AND AMENDED RECORD OF DECISION (ROD) FOR OPERABLE UNIT (OU) 1, AT JACKSON PARKHOUSING COMPLEX AT BREMERTON, WASHINGTON (SITE). | LIBERTY JV | $205,296 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Jun 23, 2025 | Jun 23, 2025 | Jun 23, 2027 | ||
| THIS TASK ORDER (TO) IS TO CONDUCT REMEDY OPTIMIZATION TO AID CLEANUP OF OPERABLE UNIT 8, SITES A AND F. THIS TO WILL ALSO PROVIDE FOR THE COMPLETION OF A PREVIOUSLY STARTED RESEARCH STUDY TO DETERMINE BIODEGRADATION RATES OF MUNITIONS COMPOUNDS. | LIBERTY JV | $1,074,491 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C215ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | Jun 18, 2025 | Jun 18, 2025 | Dec 18, 2026 | ||
| THIS TASK ORDER IS TO PROVIDE THE LAND USE CONTROL (LUC) 5-YEAR EVALUATION AT KISKA ISLAND NAVAL DEFENSIVE SEA AREA, ALASKA. IT WILL BE DETERMINED THAT THE IMPLEMENTED LUCS CONTINUE TO BE EFFECTIVE AND ANY CORRECTIVE ACTIONS WILL BE RECOMMENDED. | LIBERTY JV | $79,235 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Jun 17, 2025 | Jun 17, 2025 | Aug 17, 2026 | ||
| THIS TASK ORDER IS TO PROVIDE MONITORING AND REPORTING ON THE STATUS OF LAND USE CONTROL (LUC) REMEDY FOR OPERABLE UNIT 3 TERRESTRIAL (OU3 T) AT JACKSON PARK HOUSING COMPLEX (JPHC). | LIBERTY JV | $95,514 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | May 14, 2025 | May 14, 2025 | May 15, 2026 | ||
| 25 PUGET SOUND NAVAL SHIPYARD (6) OPERABLE UNIT B MARINE CONFINED AQUATIC DISPOSAL PIT AND CAPPED AREA INSPECTIONS PHASE 4 | LIBERTY JV | $231,893 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C213ARCHITECT AND ENGINEERING- GENERAL: INSPECTION (NON-CONSTRUCTION) | May 7, 2025 | May 7, 2025 | Nov 7, 2026 | ||
| 2025 ANNUAL NASWI LUC INSPECTIONS AND REPORT NAVFAC NW AOR | LIBERTY JV | $152,203 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | May 7, 2025 | May 7, 2025 | May 6, 2026 | ||
| 25 NASWI LHTR (EO351) 5YR PH 6 | LIBERTY JV | $188,819 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | May 5, 2025 | May 5, 2025 | Jul 6, 2026 | ||
| 25 BARROW (5 12 13) CMP UPDATE PH 2 2 4 | LIBERTY JV | $78,880 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C215ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | Apr 1, 2025 | Apr 1, 2025 | Apr 1, 2026 | ||
| NHB (EO203) OU3T LUC INSPECTION PH 7 | LIBERTY JV | $73,488 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C215ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | Mar 31, 2025 | Mar 31, 2025 | Mar 31, 2026 | ||
| 25 NASWI LHTR (EO351) ANNUAL CLEARANCE QA | LIBERTY JV | $220,594 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Mar 28, 2025 | Mar 28, 2025 | May 26, 2026 | ||
| X036 ANNUAL INSPECTION, LAND USE CONTROL | LIBERTY JV | $231,961 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C215ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | Mar 14, 2025 | Mar 14, 2025 | Sep 14, 2026 | ||
| 2025 KEYPORT OU 2 AREA 8 PRE-FOCUSED FEA | LIBERTY JV | $249,299 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C215ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | Feb 27, 2025 | Feb 27, 2025 | Aug 27, 2026 | ||
| 25 MANCHESTER (302_303_304) LUC INSPECTION PH. 7 | LIBERTY JV | $69,366 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Feb 25, 2025 | Feb 25, 2025 | Nov 25, 2025 | ||
| MODIFY GATE SECURE BLDG 200 | LIBERTY JV | $383,066 | DEPT OF THE AIR FORCE | DEFENSE INFORMATION SYSTEMS AGENCY (DISA) | — | 541330Engineering Services | C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | Sep 24, 2024 | Sep 23, 2024 | Jun 24, 2025 | ||
| THIS REQUIREMENT IS FOR A MULTIPLE AWARD INDEFINITE-DELIVERY, INDEFINITE-QUANTITY (IDIQ) FOR ARCHITECT-ENGINEER SERVICES FOR JOINT BASE SAN ANTONIO, (JBSA) TO INCLUDE TITLE I AND TITLE II SERVICES. | LIBERTY JV | $499,747 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541330Engineering Services | C1AZARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER ADMINISTRATIVE FACILITIES/SERVICE BUILDINGS | Sep 24, 2024 | Sep 30, 2024 | Jun 12, 2025 | ||
| X030 REMEDIAL INVESTIGATION AT MINS OB/OD RANGE UXO SITE 14 | LIBERTY JV | $1,075,000 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C215ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | Aug 27, 2024 | Aug 28, 2024 | Aug 23, 2027 | ||
| CONTRACT NO. N44255-20-D-5006, CTO N6247324F5005 (PTO X029) 24 ADAK (SW) CMP UPDATE REVISION 9 | LIBERTY JV | $182,390 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Aug 16, 2024 | Aug 16, 2024 | Feb 16, 2026 |