Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| CONSTRUCTION SERVICES FOR PROJECT IN NP INDU PMS(1), PAVEMENT PRESERVATION INDIANA DUNES. THIS WORK CONSISTS OF CRACK SEALING, PATCHING, APPLICATION OF CHIP SEAL AND MICRO SURFACE TREATMENTS AND PAVEMENT MARKING. | CENTRAL SOUTHERN CONSTRUCTION CORP. | $4,775,722 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Feb 13, 2026 | Feb 13, 2026 | Jul 24, 2026 | ||
| PROJECT - VA NP GWMP MVT(4) - STIPEND FEE FOR UNSUCCESSFUL FIRM | CENTRAL SOUTHERN CONSTRUCTION CORP. | $150,000 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Jan 7, 2026 | Jan 7, 2026 | Feb 27, 2026 | ||
| FUNDS CONSTRUCTION PROJECT TX NP MULTI PMS(1) ), PAVEMENT PRESERVATION TEXAS. THIS WORK CONSISTS OF CRACK SEALING, PATCHING, APPLICATION OF CHIP SEAL AND MICRO SURFACE TREATMENTS AND PAVEMENT MARKING. | CENTRAL SOUTHERN CONSTRUCTION CORP. | $10,492,605 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Dec 8, 2025 | Dec 8, 2025 | Sep 3, 2026 | ||
| PROJECT DC NP ROCR 503(1), 24(2) THE PROJECT CONSISTS OF ROADWAY REPAIRS ON WATERSIDE DRIVE FROM THE SOUTHERN INTERSECTION WITH ROCK CREEK AND POTOMAC PARKWAY TO MASSACHUSETTS AVENUE NW, AND PINEY BRANCH PARKWAY FROM ARKANSAS AVENUE TO BEACH DRIVE | CENTRAL SOUTHERN CONSTRUCTION CORP. | $8,615,235 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Jul 23, 2025 | Jul 23, 2025 | Feb 16, 2027 | ||
| GA NP CHCH MULTI (2): THE PROJECT CONSISTS OF THE REHABILITATION OF 0.44 MILES OF SNODGRASS ROAD AND 0.76 MILES OF DYER ROAD, INCLUDING PARKING AREAS AND PULL-OFFS. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL, ROADBED RECONDITIONING, GRADING, AGGREG | CENTRAL SOUTHERN CONSTRUCTION CORP. | $1,843,125 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Jul 18, 2025 | Jul 18, 2025 | May 31, 2028 | ||
| PROJECT NC ERFO NP BLRI 2024-1(7) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK. | CENTRAL SOUTHERN CONSTRUCTION CORP. | $477,370 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Jul 1, 2025 | Jul 1, 2025 | May 31, 2027 | ||
| PROJECT NC ERFO NP BLRI 2024-1(6) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK. | CENTRAL SOUTHERN CONSTRUCTION CORP. | $4,309,500 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Jul 1, 2025 | Jul 1, 2025 | Jun 30, 2028 | ||
| PROJECT NC ERFO NP BLRI 2024-1(5) THE PROJECT CONSISTS OF SLIDE REPAIRS, CULVERT REPLACEMENT, STONE MASONRY HEADWALL REPAIR, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK. | CENTRAL SOUTHERN CONSTRUCTION CORP. | $6,637,924 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | May 27, 2025 | May 27, 2025 | Jul 31, 2028 | ||
| MS NP GUIS 15(4) THIS PROJECT CONSISTS OF THE CONSTRUCTION OF PAVED SHOULDERS, BOARDWALKS, CULVERT REPLACEMENT, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES THE INSTALLATION OF A BOTTOMLESS BOX CULVERT, GRADING, PAVING SHOULDERS, MICROSURFACING AND | CENTRAL SOUTHERN CONSTRUCTION CORP. | $9,123,185 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | May 1, 2025 | May 1, 2025 | Jan 14, 2028 | ||
| PROJECT NC ERFO FS NFNC811 2020-1(1): THE PROJECT CONSISTS OF THE REPAIR OF A FILL SLOPE FAILURE ON TUNI GAP ROAD (RTE 440). THE WORK INCLUDES GRADING, DRAINAGE, GEOFOAM LIGHTWEIGHT FILL EMBANKMENT, AGGREGATE SURFACE COURSE, AND OTHER MISCELLANEOU | CENTRAL SOUTHERN CONSTRUCTION CORP. | $662,370 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Apr 25, 2025 | Apr 25, 2025 | Feb 28, 2027 | ||
| PROJECT IL ERFO COE 2019-1(1) THE PROJECT CONSISTS OF THE REMOVAL AND REPLACEMENT OF FIVE DAMAGED PEDESTRIAN TIMBER BRIDGES. THE WORK INCLUDES CONCRETE ABUTMENTS WITH HELICAL PILE FOUNDATION, REPAIR OF WOODEN TRAIL STEPS, STABILIZATION OF ERODED ARE | CENTRAL SOUTHERN CONSTRUCTION CORP. | $3,495,405 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Feb 26, 2025 | Feb 26, 2025 | May 18, 2027 | ||
| PROJECT MS ERFO NPS VICK 2020-1(2) THE PROJECT CONSISTS OF SLIDE REPAIRS ON GRANT AVENUE AND UNION AVENUE. THE WORK INCLUDES CLEARING AND GRUBBING, ROADWAY EXCAVATION AND EMBANKMENT CONSTRUCTION, GEOGRID, GABIONS, AGGREGATE BASE, MECHANICALLY COMPAC | CENTRAL SOUTHERN CONSTRUCTION CORP. | $8,933,610 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Jan 9, 2025 | Jan 9, 2025 | Mar 31, 2028 | ||
| PROJECT NP SER PMS FY24(3): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK. | CENTRAL SOUTHERN CONSTRUCTION CORP. | $1,703,080 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Jan 3, 2025 | Jan 3, 2025 | Mar 31, 2028 | ||
| PROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN | CENTRAL SOUTHERN CONSTRUCTION CORP. | $6,808,135 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Dec 31, 2024 | Dec 31, 2024 | Nov 30, 2027 | ||
| PROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITC | CENTRAL SOUTHERN CONSTRUCTION CORP. | $14,661,421 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Dec 26, 2024 | Dec 26, 2024 | Dec 31, 2027 | ||
| NC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TO | CENTRAL SOUTHERN CONSTRUCTION CORP. | $2,279,350 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Dec 23, 2024 | Dec 23, 2024 | Oct 31, 2026 | ||
| PROJECT NP SER PMS FY24(2): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK. | CENTRAL SOUTHERN CONSTRUCTION CORP. | $1,582,756 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Nov 22, 2024 | Nov 22, 2024 | Jan 31, 2028 | ||
| CONSTRUCTION, REPLACE WASTEWATER TREATMENT PLANT AT DRY TORTUGAS NATIONAL PARK | CENTRAL SOUTHERN CONSTRUCTION CORP. | $0 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 237110Water and Sewer Line and Related Structures Construction | Y1NDCONSTRUCTION OF SEWAGE AND WASTE FACILITIES | Sep 25, 2024 | Sep 25, 2024 | Mar 31, 2025 | ||
| CONSTRUCTION, REPAIR COLLAPSED STORM DRAIN AT CASTILLO DE SAN MARCOS | CENTRAL SOUTHERN CONSTRUCTION CORP. | $775,675 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 238910Site Preparation Contractors | Z2PZREPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES | Aug 23, 2024 | Aug 23, 2024 | Aug 15, 2025 | ||
| PROJECT NP NATR 3N16, 3H25, ETC FOR STIPEND FEE FOR UNSUCCESSFUL FIRM. | CENTRAL SOUTHERN CONSTRUCTION CORP. | $25,000 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Jun 7, 2024 | Jun 6, 2024 | Aug 30, 2024 | ||
| PROJECT NP SLBE 5109(1): THE PROJECT CONSISTS OF CONSTRUCTING LEFT AND RIGHT TURNING LANES ON SOUTH DUNE HIGHWAY (M-109) AT DUNE CLIMB PARKING AREA (ROUTE 920). THE WORK INCLUDES GRADING; AGGREGATE BASE; ASPHALT PAVEMENT MILLING; CONCRETE PAVING; MS | CENTRAL SOUTHERN CONSTRUCTION CORP. | $2,592,163 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Mar 25, 2024 | Mar 25, 2024 | Dec 2, 2025 | ||
| MI NP MUILTI PMS(1), PAVEMENT PRESERVATION MICHIGAN. WORK CONSISTS OF PATCHING, CRACK SEALING, AND RESURFACING OF ASPHALT SURFACES THROUGH PICTURED ROCKS NATIONAL LAKESHORE AND SLEEPING BEAR FUNES NATIONAL LAKESHORE. | CENTRAL SOUTHERN CONSTRUCTION CORP. | $6,276,442 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Feb 26, 2024 | Feb 26, 2024 | Oct 25, 2024 | ||
| THIS PROJECT CONSISTS OF RESURFACING THE NATCHEZ TRACE PARKWAY, INCLUDING RAMPS, BRIDGES, INTERSECTIONS, VARIOUS ACCESS ROADS, AND PARKING/PULL-OFF AREAS. THE WORK WILL INCLUDE ASPHALT OVERLAY, SIDESLOPE REPAIRS, WEDGE AND LEVELING, SPOT PATCHING, AN | CENTRAL SOUTHERN CONSTRUCTION CORP. | $19,430,502 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Jun 29, 2023 | Jun 29, 2023 | Mar 31, 2027 | ||
| PROJECT NP-SER PMS FY22(1) THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF 29.57 MILES OF MAIN PARK ROAD INCLUDING PULL-OFF AREAS. THE WORK INCLUDES MICRO SURFACING, PAVEMENT MARKINGS, AND OTHER MISCELLANEOUS WORK. | CENTRAL SOUTHERN CONSTRUCTION CORP. | $4,483,496 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Aug 5, 2022 | Aug 5, 2022 | Jul 31, 2025 | ||
| PROJECT NP SER PMS FY21(1) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION (MICRO SURFACING) OF ROADS AND PARKING AREAS IN EVERGLADES NATIONAL PARK. THE WORK INCLUDES CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT PATCHING, PAVEMENT MARKING INS | CENTRAL SOUTHERN CONSTRUCTION CORP. | $6,330,501 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Jun 2, 2022 | Jun 2, 2022 | Jun 18, 2024 |