PLEASANT HILL DISTRICT - HORSEHEAD GEOTHERMAL UNIT REPLACEMENT. PLEASE READ THE ATTACHED SPECIFICATIONS FOR THE UNIT TO BE REPLACED AT THE PLEASANT HILL RANGER DISTRICT. FOR TECHNICAL QUESTIONS, PLEASE CONTACT DANNY SIMS AT [email protected].
NEW CONSTRUCTION CONTRACT ACTION TO REPLACE 4 TON HVAC UNIT #1. OPTIONAL BID ITEM 1 - REPLACE 2 TON HVAC UNIT #2. WORKPLAN ACQUISITION PROJECT ID: 624015 COR/IPP APPROVER: LEE BLACKARD PERFORMANCE PERIOD: 6/1/22-7/29/22
NEW CONTRACT ACTION FOR REPLACING GEOTHERMAL HVAC UNIT AT LONG POOL RECREATION AREA. PERFORMANCE DATES: JUNE 1, 2020 - AUGUST 31, 2021 IPP APPROVER/COR: DANIEL HEINZEN
REPLACEMENT OF HP#1 AND HP#8 GEOTHERMAL HEAT PUMP UNIT IN THE SUPERVISORS OFFICE. PLEASE SEE ATTACHED QUOTE FOR ADDITIONAL INFORMATION. COR: SCOTT ROBERTS, 479-964-7260
REPLACEMENT OF HP#2 GEOTHERMAL HEAT PUMP UNIT IN THE SUPERVISORS OFFICE. THIS INCLUDES REMOVAL OF OLD UNIT AND INSTALLATION OF NEW UNIT, REMOVAL/REPLACEMENT OF THE CONFERENCE ROOM DROP CEILING, SCISSOR LIFT RENTAL AND A 10 YEAR WARRANTY. PLEASE SEE ATTACHED QUOTE. COR: SCOTT ROBERTS, 479-964-7260
GEOTHERMAL HEAT PUMP UNIT THAT REPLACES HP#5, WHICH SERVICES ENGINEERING&LAW ENFORCEMENT. INCLUDES 10 YEAR PARTS&LABOR WARRANTY. PLEASE SEE ATTACHED QUOTE FOR ADDITIONAL INFORMATION. CONTACT: SCOTT ROBERTS, 479-964-7260
IGF::OT::IGF REPLACEMENT OF HP#4, HP#9 AND HP#11 GEOTHERMAL HEAT PUMP UNITS IN THE SUPERVISORS OFFICE. THIS INCLUDES REMOVAL OF OLD UNITS AND INSTALLATION OF NEW UNITS.
IGF::CT::IGF HVAC UNITS IN ATTIC #9, #10 AND #11 TO REMOVE MOLDY INSULATION AND REPLACE AND SANITIZE UNITS WITH ANTI-MICROBIAL SOLUTION. RE-PLUMB UNITS #8 AND #9 TO CORRECT DRAINING ISSUES. INSTALL UV LIGHTING IN ALL THREE UNITS.
PURCHASE AND REPLACE COILS IN FLORIDA HEAT PUMP HVAC UNITS 1&4. (ECO42-3VCT AND ECO36-3VCT) LOCATED IN THE SUPERVISOR'S OFFICE FOR THE OZARK-ST. FRANCIS NATIONAL FORESTS. RUSSELLVILLE, AR
REPLACEMENT OF (4) 2-CIRCUIT FLOW CENTERS WITH (2) 4-CIRCUIT FLOW CENTERS AT THE KOEN BUILDING. FLUSH AND PRESSURE TEST HVAC PIPING WITHIN THE BUILDING. REPLACE THE COIL IN EXISTING FLORIDA HEAT PUMP UNIT #9.