• ⌘ + K
  • Home
  • 0
    Inbox
Explore
  • Browse All
  • Health
  • FedCiv
  • Defense
  • Events
Work
  • Teaming Hub
  • Watchlists
  • Bookmarks
  • Notes
Research
  • Grants
    • Contracts
    • Vehicles
    • OTAs
    • OTIDVs
    • DLA DIBBS
    • SBIR/STTR
  • Agencies
  • NAICS
  • PSC
  • DOGE Tracker

Federal Contract Awards

744awards

Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.

Awardee
is
F5NDARJLBKC6
Award ID
Description
Recipient
Total Value
Awarding Agency
Funding Agency
Set Aside
NAICS
PSC
Award Date
Start Date
End Date
FA441726F0021
THE CONTRACTOR SHALL REMARK/REPAINT AND MATCH ALL EXITING STRIPING AS INDICATED IN THE WORK DESCRIPTION WITHIN THE SOW AND AS SHOWN ON THE INCLUDED AIRFIELD SITE PLAN.NWF CONTRACTORS INC$83,465DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—237310Highway, Street, and Bridge ConstructionZ1BDMAINTENANCE OF AIRPORT RUNWAYS AND TAXIWAYSMar 3, 2026Mar 2, 2026May 18, 2026
FA441725F0278
WORK TO BE PERFORMED UNDER THIS TASK ORDER WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK, ACCEPTED PROPOSAL AND DRAWINGS ATTACHED IN SECTION JNWF CONTRACTORS INC$1,672,612DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—237310Highway, Street, and Bridge ConstructionY1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYSSep 24, 2025Sep 30, 2025Feb 3, 2026
FA441725F0272
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, EQUIPMENT, MATERIALS, FACILITIES, AND TRANSPORTATION NECESSARY TO REPAIR SEWER LINES, IAW THE DRAWINGS AND SPECIFICATIONS.NWF CONTRACTORS INC$140,793DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—237310Highway, Street, and Bridge ConstructionZ2JZREPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGSSep 18, 2025Sep 18, 2025Jul 5, 2026
FA441725F0262
THIS IS A CIVIL WORKS IDIQ CONTRACT FOR WORK CONSISTING OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL.NWF CONTRACTORS INC$107,059DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—237310Highway, Street, and Bridge ConstructionY1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYSSep 12, 2025Sep 26, 2025May 25, 2026
FA441725F0246
THIS IS A CIVIL WORKS IDIQ CONTRACT FOR WORK CONSISTING OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL.NWF CONTRACTORS INC$35,470DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—237310Highway, Street, and Bridge ConstructionY1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYSSep 4, 2025Sep 4, 2025Oct 19, 2025
FA248825FB013
CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023 - DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023NWF CONTRACTORS INC$494,846DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—238110Poured Concrete Foundation and Structure ContractorsY1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIESSep 2, 2025Sep 2, 2025Jan 28, 2026
FA441725F0222
THIS IS A CIVIL WORKS IDIQ CONTRACT FOR WORK CONSISTING OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL.NWF CONTRACTORS INC$299,802DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—237310Highway, Street, and Bridge ConstructionY1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYSSep 2, 2025Sep 2, 2025Mar 21, 2026
FA441725F0211
THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO REPAIR BY REPLACEMENT THE AUTOMATIC ACCESS GATE TO THE FLIGHTLINE.NWF CONTRACTORS INC$57,541DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—237310Highway, Street, and Bridge ConstructionZ2PZREPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIESAug 18, 2025Aug 18, 2025Jan 15, 2026
FA441725F0206
REPAIR HOT WATER SUPPLY AND RETURN LINES ON THE BUILDING 1 BOILERNWF CONTRACTORS INC$470,257DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—237310Highway, Street, and Bridge ConstructionJ045MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENTAug 15, 2025Aug 18, 2025Dec 5, 2025
FA441725F0199
CP1144587 EOD ARMAG WORK TO BE PERFORMED UNDER THIS TASK ORDER WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK, ACCEPTED PROPOSAL AND DRAWINGS ATTACHED IN SECTION J.NWF CONTRACTORS INC$161,290DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—237310Highway, Street, and Bridge ConstructionY1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYSAug 13, 2025Aug 15, 2025Jan 9, 2026
FA441725F0119
REPAIR SEVEN STORMWATER SYSTEMS AROUND HURLBURT FIELD, FLORIDA.NWF CONTRACTORS INC$195,824DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—237310Highway, Street, and Bridge ConstructionY1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYSMay 15, 2025May 29, 2025Mar 5, 2026
FA441725F0116
REPLACE TWO CONCRETE SLABS ON RUNWAY 18/36NWF CONTRACTORS INC$27,601DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—237310Highway, Street, and Bridge ConstructionY1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYSMay 12, 2025May 12, 2025Jul 11, 2025
FA441725F0106
DUKE FIELD RUNWAY FRICTION TESTNWF CONTRACTORS INC$25,657DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—237310Highway, Street, and Bridge ConstructionY1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYSApr 30, 2025Apr 29, 2025May 19, 2025
FA248825FB008
CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023- DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023NWF CONTRACTORS INC$398,264DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—238110Poured Concrete Foundation and Structure ContractorsY1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIESApr 21, 2025Apr 24, 2025Oct 24, 2025
FA248825FB007
CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023- DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023NWF CONTRACTORS INC$276,780DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—238110Poured Concrete Foundation and Structure ContractorsY1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIESFeb 21, 2025Feb 20, 2025Jul 21, 2025
FA248825FB004
CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023- DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023NWF CONTRACTORS INC$74,430DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—238110Poured Concrete Foundation and Structure ContractorsY1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIESDec 18, 2024Dec 18, 2024Mar 3, 2025
FA441725F0020
THIS IS A TASK ORDER OFF OF THE CIVIL WORKS IDIQ CONTRACT FOR ANNUAL RUBBER REMOVAL REQUIREMENTNWF CONTRACTORS INC$159,123DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—237310Highway, Street, and Bridge ConstructionY1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYSDec 3, 2024Jan 1, 2025Apr 21, 2025
FA441725F0017
REPAINT RUNWAY EDGE LINESNWF CONTRACTORS INC$195,381DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—237310Highway, Street, and Bridge ConstructionY1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYSDec 3, 2024Jan 7, 2025Feb 18, 2025
FA248825FB001
CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023- DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023NWF CONTRACTORS INC$6,460DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—238110Poured Concrete Foundation and Structure ContractorsY1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIESNov 5, 2024Nov 6, 2024Dec 21, 2024
FA441724F0359
THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION, AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO ACCOMPLISH ALL WORK COMPLETE TO INSTALL COMMUNICATIONS INFRASTRUCTURE TO BUILDING 91360, WITHIN HURLBURT FIELD, FL.NWF CONTRACTORS INC$147,978DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—237310Highway, Street, and Bridge Construction4510PLUMBING FIXTURES AND ACCESSORIESSep 28, 2024Oct 11, 2024Feb 17, 2025
FA441724F0320
THE WORK CONSISTS OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, WASTEWATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL.NWF CONTRACTORS INC$41,635DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—237310Highway, Street, and Bridge Construction5660FENCING, FENCES, GATES AND COMPONENTSSep 10, 2024Sep 16, 2024Dec 6, 2024
FA441724F0299
THIS IS A CIVIL WORKS IDIQ CONTRACT FOR WORK CONSISTING OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL.NWF CONTRACTORS INC$11,826DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—237310Highway, Street, and Bridge ConstructionY1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGSSep 6, 2024Sep 16, 2024Nov 26, 2024
FA441724F0127
THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO REPAIR VCP SEWER LINES WITHIN BASIN 2. THE PROJECT IS LOCATED ON HURLBURT FIELD, FL.NWF CONTRACTORS INC$270,695DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—237310Highway, Street, and Bridge ConstructionY1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYSJul 11, 2024Jul 15, 2024Mar 18, 2025
FA441724F0153
THE WORK IS BUT NOT LIMITED TO REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, WASTEWATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL.NWF CONTRACTORS INC$304,758DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—237310Highway, Street, and Bridge ConstructionY1LZCONSTRUCTION OF PARKING FACILITIESJul 5, 2024Jul 15, 2024Oct 17, 2024
FA441724F0123
THE WORK TO BE PERFORMED IN ACCORDANCE WITH SOW TO INCLUDE, BUT NOT LIMITED TO: 1. CRACK REPAIRS WILL BE SEALED WITH BACKER ROD AND COLD APPLIED JOINT SEAL.2. SPALLS TO BE REPAIRED WITHIN LIMITS OF THE EAST RAMP AND RUNWAY AS SHOWN ON THE PLANSNWF CONTRACTORS INC$349,113DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—237310Highway, Street, and Bridge ConstructionZ1BDMAINTENANCE OF AIRPORT RUNWAYS AND TAXIWAYSJun 13, 2024Jun 13, 2024Apr 9, 2025