Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| PCA-A&ECONS-04089; THIS PROJECT CONSISTS OF PROVIDING A FEASIBILITY STUDY TO REPLACE FOURTEEN (14) ATS IN CRC ELECTRICAL VAULTS AA, AB, FA, AND GA THAT PROVIDE EMERGENCY POWER TRANSFER FOR CRITICAL LOADS FOR PATIENT CARE UNITS AND LAB WINGS THAT | AFFILIATED ENGINEERS METRO DC, INC. | $156,340 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Jun 4, 2026 | Jun 4, 2026 | Dec 21, 2026 | ||
| C201802 - EVALUATE, STUDY, AND DESIGN A ROBUST, LONG-LASTING INTERNAL LINER SYSTEM THAT ENSURES TANK INTEGRITY, PREVENTS CORROSION, MAINTAINS WATER QUALITY, AND COMPLIES WITH REGULATORY STANDARDS. | AFFILIATED ENGINEERS METRO DC, INC. | $238,723 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Mar 31, 2026 | Mar 31, 2026 | Nov 30, 2026 | ||
| C201851-DESIGN TEMPORARY T2 TRANSFORMER - PHASE 1 - VANESSA ARGOTE MACIA | AFFILIATED ENGINEERS METRO DC, INC. | $46,377 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Mar 20, 2026 | Mar 20, 2026 | Apr 14, 2026 | ||
| C106708 - FY25 - BOILER FEEDWATER PUMP REPLACEMENT -COMMISSIONING, CX BLDG 11, WAYNE SMALLS | AFFILIATED ENGINEERS METRO DC, INC. | $165,177 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Jul 8, 2025 | Jul 8, 2025 | Aug 31, 2026 | ||
| THE CONTRACT ACTION IS ESSENTIAL TO ENSURE CONSTRUCTION ACTIVITIES CONTINUE TO PROGRESS AND REMAIN COMPLIANT WITH ALL SAFETY, REGULATORY, AND FUNCTIONAL SPECIFICATIONS TO ENSURE THE FACILITY COMPLIES WITH THE HIGHEST INDUSTRY STANDARDS. | AFFILIATED ENGINEERS METRO DC, INC. | $30,916 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Jun 5, 2025 | Jun 9, 2025 | Aug 6, 2025 | ||
| PROVIDE A DESIGN TO REPAIR/REPLACE THE DAMAGED SANITARY MAIN UNDERNEATH THE SLAB IN THE BASEMENT OF BUILDING 35A TO STOP THE FREQUENT SEWAGE CLOGS AND BACK-UPS IMPACTING VIVARIUM OPERATIONS AND RENDERING THE BASEMENT TOILET FACILITIES UNUSABLE | AFFILIATED ENGINEERS METRO DC, INC. | $724,988 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | May 28, 2025 | May 27, 2025 | Aug 28, 2026 | ||
| COMMISSIONING (CX) SUPPORT SERVICES FOR THE GENERATORS FOR CAMPUS EMERGENCY CHILLED WATER SERVICE (C109584) PROJECT AT CENTRAL UTILITY PLANT (CUP) AT NIH, RESEARCH TRIANGLE PARK, NC | AFFILIATED ENGINEERS METRO DC, INC. | $370,926 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Sep 27, 2024 | Sep 30, 2024 | Sep 10, 2029 | ||
| C115968 - COMMISSIONING SERVICES FOR IRF PENTHOUSE MECHANICAL ROOM UPGRADE BREATHING AIR SYSTEM, FORT DETRICK | AFFILIATED ENGINEERS METRO DC, INC. | $82,942 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Sep 25, 2024 | Sep 24, 2024 | Apr 1, 2026 | ||
| C115933- COMMISSIONING SERVICES FOR 12E CGMP UPS POWER- ASHISH PANDIT- PERIOD OF PERFORMANCE 9/30/2024- 12/29/2025 | AFFILIATED ENGINEERS METRO DC, INC. | $62,617 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Sep 23, 2024 | Sep 30, 2024 | Jan 28, 2026 | ||
| C115526 COMMISSIONING TO REPLACE 3 ATS'S FOR CRC DATA CENTER AT BLDG 10. CS: BRAD ARENSDORF CO: ZACH PRICE COR: ASHISH PANDIT | AFFILIATED ENGINEERS METRO DC, INC. | $91,660 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Sep 20, 2024 | Sep 16, 2024 | Jan 31, 2026 | ||
| C112224-EXTERNAL REVIEW FOR CUP BIM MODEL PROJECT CS: BRAD ARENSODRF CO: ZACH PRICE COR: WAYNE SMALLS PO: JOSH MILLER | AFFILIATED ENGINEERS METRO DC, INC. | $45,845 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Sep 20, 2024 | Sep 20, 2024 | Apr 27, 2025 | ||
| C101309- ARCHITECT-ENGINEER SUPPORT SERVICES FOR CONSTRUCTION ADMINISTRATION, CONSTRUCTION QUALITY MANAGEMENT, AND COMMISSIONING: BUILDING 11 FIRE SPRINKLER SYSTEM MODIFICATION | AFFILIATED ENGINEERS METRO DC, INC. | $453,704 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Sep 17, 2024 | Sep 20, 2024 | Mar 4, 2026 | ||
| C104573 - CQM SERVICES, REPLACEMENT OF STEAM & CHILLED H2O IN TUNNEL FR VV 2 TO VV 31C - AMIR ABDELSALAM | AFFILIATED ENGINEERS METRO DC, INC. | $41,389 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Sep 17, 2024 | Sep 18, 2024 | Apr 10, 2025 | ||
| C106720- CUP AIR COMPRESSOR UPGRADE | AFFILIATED ENGINEERS METRO DC, INC. | $672,990 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Sep 3, 2024 | Sep 4, 2024 | Dec 31, 2026 | ||
| C115777 - NIA/NINDS/NEI/NHLBI/NIMHD CAFETERIA RENOVATION DESIGN. | AFFILIATED ENGINEERS METRO DC, INC. | $1,065,079 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Aug 23, 2024 | Aug 22, 2024 | Dec 31, 2026 | ||
| C115177 - CONTRACT AE PEER REVIEWS FOR INTRAMURAL PROJECTS | AFFILIATED ENGINEERS METRO DC, INC. | $403,536 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Aug 13, 2024 | Aug 14, 2024 | Apr 3, 2028 | ||
| EDS PROVIDES CRITICAL SUPPORT TO THE SCSU LOCATED IN THE CRC. THE SCSU IS AN INPATIENT FACILITY THAT SERVES AS A CONTINGENCY SITE IN THE EVENT OF STAFF EXPOSURE TO PATHOGENS IN BLDG 33 AND IRF FREDERICK. M30845034 | AFFILIATED ENGINEERS METRO DC, INC. | $72,000 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Jul 17, 2024 | Jul 17, 2024 | Jan 27, 2025 | ||
| AE C103401 DESCRIPTION - AE CONSTRUCTION ADMINISTRATION SERVICES, CONSTRUCTION QUALITY MANAGEMENT, & COMMISSIONING SERVICES FOR EXPANSION OF FREE COOLING TO ADDITIONAL COOLING TOWERS CO - DAVE SEID COR - CASEY HUGHES VENDOR POC - KATIE MCGIMPS | AFFILIATED ENGINEERS METRO DC, INC. | $235,155 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | May 23, 2024 | May 23, 2024 | Jan 31, 2026 | ||
| C108793 - REPLACE CHILLED WATER VERTICAL RISERS, BLDG. 10 - ACRF NEW CONTRACT ACTION FOR CQM [24-001508] | AFFILIATED ENGINEERS METRO DC, INC. | $1,243,306 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Apr 26, 2024 | Jun 1, 2024 | Jan 29, 2027 | ||
| ENGINEERING DESIGN REVIEW FOR VENTILATION PROJECT | AFFILIATED ENGINEERS METRO DC, INC. | $23,832 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Apr 12, 2024 | Apr 12, 2024 | Apr 14, 2025 | ||
| C109652 - B49 CQM/CX SERVICES DURING CONSTRUCTION TASK TO REPLACE REHEAT WATER PIPES CS: CHRIS HSU CO: ZACH PRICE COR: EARL JOHNSON | AFFILIATED ENGINEERS METRO DC, INC. | $1,903,000 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Nov 30, 2023 | Nov 29, 2023 | May 31, 2027 | ||
| C115694 CENTRAL UTILITY PLANT BOILER CONTROLS UPGRADE FOR BOILERS #2 AND #3 CQM SERVICES COR: HAITAO MA | AFFILIATED ENGINEERS METRO DC, INC. | $135,076 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Sep 26, 2023 | Oct 5, 2023 | Jan 7, 2025 | ||
| DESIGN AND POST DESIGN SERVICES FOR REPLACING AIR HANDLING UNIT-1 IN BUILDING 8 | AFFILIATED ENGINEERS METRO DC, INC. | $438,136 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Sep 22, 2023 | Sep 22, 2023 | Jun 30, 2026 | ||
| CENTRAL UTILITY PLANT ELECTRICAL UPGRADE(C107469) AND REPLACEMENT OF CHILLERS 18_19 AND COOLING TOWER 19 (C115462) | AFFILIATED ENGINEERS METRO DC, INC. | $12,397,990 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Sep 22, 2023 | Oct 6, 2023 | May 31, 2028 | ||
| C116213 - DESIGN PHASE, BLDG 50 REHEAT SYSTEM REPLACEMENT CS: CHRIS HSU CO: ZACH PRICE COR: HAKAN BARDAKCI | AFFILIATED ENGINEERS METRO DC, INC. | $425,712 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Sep 20, 2023 | Oct 4, 2023 | Jul 8, 2025 |