Name | Type | Posted | Actions |
|---|---|---|---|
DRAFT Statement of Work - Tarps Installation.pdf | May 15, 2026 |
Wind Tarps Installation-Market Research Only
Contact and place of performance
A1C Sadia Raheem
Hurlburt Field, FL 32544
USA
THIS IS A SOURCES SOUGHT FOR MARKET RESEARCH ONLY. NO QUOTES WILL BE EVALUATED IN RESPONSE TO THIS POSTING. The contractor shall provide all management, tools,supplies, equipment, labor and hardware necessary to install pre-purchased wind tarps for 624 Red Horse Road, building 90538, Hurlburt Field, FL, to close sides of facility and preventweathering of equipment and limit personnel exposure to outside elements. The...
View morePlease see the Draft SOW attached to this posting for further details.
If your company is both capable and interested in fulfilling this requirement, please contact the POC by 20 May 2026 at 1100 CDT.
The Department of the Air Force, FA4417 1 SOCONS, issued this Sources Sought notice under solicitation number WindTarpSourcesSought for market research purposes. The project requires a contractor to provide all management, tools, supplies, equipment, labor, and hardware necessary to install pre-purchased wind tarps at Building 90538, located at 624 Red Horse Road at Hurlburt Field, Florida. The primary objective is to close the sides of the facility to prevent the weathering of equipment and limit personnel exposure to outside elements. This requirement is classified under NAICS 238390 Other Building Finishing Contractors and PSC N071 INSTALLATION OF EQUIPMENT- FURNITURE, with an SBA SBA set-aside.
The contractor must complete the installation within 30 days of contract award, modifying the on-site tarps with grommets to create a functional fabric wall. Technical requirements include the use of corrosion-resistant stainless-steel cables, brackets, and eyelets designed to avoid drilling into existing steel girder support systems. Installation of eyelets into the concrete foundation is required for lower anchor points, and the final hardware configuration must allow tarps to be raised and lowered. All work must comply with the current Florida Building Code and Occupational Safety and Health Administration (OSHA) standards, including fall protection requirements under 29 CFR 1926.
Capability statements and interest in this requirement must be submitted to the point of contact, A1C Sadia Raheem, by May 20, 2026, at 1100 CDT. One attachment, titled DRAFT Statement of Work - Tarps Installation.pdf, was provided with the notice on May 15, 2026. No quotes will be evaluated in response to this market research posting.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.