Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Sep 12, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Sep 12, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Sep 12, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=N4008424R0083¬iceType=AwardNotice | LINK | Sep 12, 2025 |
Indefinite Delivery/Indefinite Quantity (IDIQ) Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Construction Contract (MACC) for U.S. Navy Support Facility, Diego Garcia, British Indian Ocean Territory (B.I.O.T.)
Contact and place of performance
Janeen Bais
Not specified
This IDIQ DB/DBB contract is for new construction, renovation/modernization, and routine repair/maintenance projects at U.S. Navy Support Facility, Diego Garcia, B.I.O.T. The work to be performed may include, but is not limited to, office renovation, building demolition, built-in equipment repair or replacement, piping repair or replacement, pipe lagging, electrical work, mechanical work, road pavement, fencing, roofing, painting, site work, removal and disposal of lead-based paint and asbestos containing material, welding, and masonry.
The Department of the Navy, NAVFACSYSCOM Far East, has issued an award notice for solicitation N4008424R0083 regarding an Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC). This contract supports the U.S. Navy Support Facility in Diego Garcia, British Indian Ocean Territory (B.I.O.T.) and utilizes both Design-Build (DB) and Design-Bid-Build (DBB) delivery methods. The work is classified under NAICS 236220 for Commercial and Institutional Building Construction and PSC Z2JZ for the repair or alteration of miscellaneous buildings.
The scope of the contract encompasses new construction, renovation, modernization, and routine maintenance projects. Specific services include office renovations, building demolition, masonry, welding, and site work, as well as the repair or replacement of built-in equipment and piping. The requirements also cover electrical and mechanical work, road pavement, fencing, roofing, painting, and the removal and disposal of lead-based paint and asbestos-containing materials. Published on September 12, 2025, the award was managed by Janeen Bais, with no additional attachments provided at the time of the announcement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.