Name | Type | Posted | Actions |
|---|---|---|---|
B08_Att_01_Specifications_140P8626R0003_REVISED_11_June_2026_0002.pdf | Jun 12, 2026 | ||
B08_Att_13_Questions___Answers_140P8626R0003_11_June_2026_0002.pdf | Jun 12, 2026 | ||
B11_Site_Visit_Sign_In_140P8626R0003_4_June_2026_0002.pdf | Jun 12, 2026 | ||
B08_Att_02_Drawings_140P8626R0003_REVISED_11_June_2026_0002.pdf | Jun 12, 2026 | ||
Sol_140P8626R0003_Amd_0002.pdf | Jun 12, 2026 | ||
Sol_140P8626R0003_Amd_0001.pdf | May 26, 2026 | ||
B08_Att_07_PSP_Vol_I_PastPerf_140P8626R0003.docx | DOCX | May 22, 2026 | |
B08_Att_06_PSP_Vol_I_KeyPers_140P8626R0003.docx | DOCX | May 22, 2026 | |
B08_Att_05_PSP_Vol_I_Exp_140P8626R0003.docx | DOCX | May 22, 2026 | |
B08_Att_01_Specifications_140P8626R0003.pdf | May 22, 2026 | ||
B08_Att_02_Drawings_140P8626R0003.pdf | May 22, 2026 | ||
B08_Att_03_WD_CA20260007_mod_3_rev_23_Jan_2026.pdf | May 22, 2026 | ||
Sol_140P8626R0003.pdf | May 22, 2026 | ||
B08_Att_04_PSP_Cover_140P8626R0003.docx | DOCX | May 22, 2026 | |
B08_Att_12_PSP_Vol_II_SF24_140P8626R0003.pdf | May 22, 2026 | ||
B08_Att_11_PSP_Vol_II_LOS_140P8626R0003.xlsx | XLSX | May 22, 2026 | |
B08_Att_10_PSP_Vol_II_GenRefs_140P8626R0003.docx | DOCX | May 22, 2026 | |
B08_Att_09_PSP_Vol_II_52_222-38_140P8626R0003.docx | DOCX | May 22, 2026 | |
B08_Att_08_PSP_Vol_II_52_209-13_140P8626R0003.docx | DOCX | May 22, 2026 |
Z--Conlon Creek Culvert Removal & Restoration, GOGA
Contact and place of performance
Rankin, Quinn
Not specified
CONLON CREEK CULVERT REMOVAL & RESTORATION, GOLDEN GATE NATIONAL RECREATION AREA This Amendment 0002 is to: 1. Include the site visit sign-in sheet. 2. Include Attachment 13 Questions & Answers. 3. Include revised Attachment 1 Specifications. 4. Include revised Attachment 2 Drawings. 5. No other changes have been made. This Amendment 0001 is to: 1. CHANGE THE SITE VISIT DATE from June 15 to Thursday, June 4, 2026, at...
View moreThe National Park Service has issued solicitation 140P8626R0003 for the removal of the Conlon Creek culvert and subsequent site restoration within the Golden Gate National Recreation Area. This requirement falls under NAICS code 237990 for Other Heavy and Civil Engineering Construction and PSC Z2KB for Repair or Alteration of Canals. The procurement is designated as an SBA set-aside. Proposals are due by June 22, 2026, following a site visit conducted on June 4, 2026.
The project scope involves heavy civil engineering and restoration activities, with specific requirements detailed across 19 attachments including revised specifications and drawings. Recent amendments to the solicitation have updated the technical drawings, provided formal responses to industry questions, and documented the site visit sign-in. Quinn Rankin serves as the primary point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.