Name | Type | Posted | Actions |
|---|---|---|---|
47PB5126R0024 HST Streetscape Perimeter Construction Site Visit Sign-In Sheets 2026 06 10.pdf | Jun 11, 2026 | ||
47PB5126R0024 HST Streetscape Perimeter Constructin Pre-Proposal Conference Meeting Minutes 2026 06 09.pdf | Jun 11, 2026 | ||
10) Model Subcontracting Plan 2026 04 15.docx | DOCX | May 21, 2026 | |
3) GSA Pricing Bid Form 2026 04 22 .xlsx | XLSX | May 21, 2026 | |
9) Tips on Preparing Subcontracting Plan 2026 04 15.pdf | May 21, 2026 | ||
4) HST Streetscape Perimeter Construction Agreement 2026 05 20.pdf | May 21, 2026 | ||
8) PBS PPQ 2023 11 29.pdf | May 21, 2026 | ||
5) GSA527 2025 11 18 .pdf | May 21, 2026 | ||
15) NDA_Document_Security 2026 02 17.pdf | May 21, 2026 | ||
11d) Res 104 Exhibit C1 Plat of Survey Letter 2026 04 22.pdf | May 21, 2026 | ||
18) HST Signal Improvements Email 2025 10 23.pdf | May 21, 2026 | ||
17) GACA GSAAffiliatedCustomerAccounts 2023 02 02.pdf | May 21, 2026 | ||
11c) Res 104 Exhibit C - Legal Transfer of Jurisdiction 2026 04 22.pdf | May 21, 2026 | ||
13) HST DOS Security Specification 2025 06 05.pdf | May 21, 2026 | ||
11) HST Streetscape Perimeter SOW 2026 May 12.pdf | May 21, 2026 | ||
19) CD_Waste_Management_Plan__Reporting_Template 2026 05 12.xlsx | XLSX | May 21, 2026 | |
16) PROJNET Instructions 2026 02 17.pdf | May 21, 2026 | ||
6) Proprietary Information Agreement 2026 04 22 .docx | DOCX | May 21, 2026 | |
14) HST Streetscape Phasing 2026 02 17.pdf | May 21, 2026 | ||
11b) Res 104 Exhibit B DATED 2026 04 22.pdf | May 21, 2026 | ||
12j) Res 104 Exhibit C1 Plat of Survey to Mark Transfer of Jurisdiction Drawing 2026 04 22.pdf | May 21, 2026 | ||
12e) HST ACISA 1132_21st St and C St NW_With Border Drawing 2026 02 17.pdf | May 21, 2026 | ||
12f) HST ACISA 1145_21st St and Virginia Ave NW_With Border Drawing 2026 02 17.pdf | May 21, 2026 | ||
12g) HST ACISA 1154_23rd Street and C Street NW_With Border Drawing 2026 02 17.pdf | May 21, 2026 | ||
12d) HST_Civil Drawings_part 3 of 3 2026 02 17.pdf | May 21, 2026 | ||
12a) HST_Landscape Drawings 2026 02 17.pdf | May 21, 2026 | ||
12i) HST_Civil Drawings DC Water V1 2026 03 10.pdf | May 21, 2026 | ||
12) HST Drawings- Civil 2026 02 17.pdf | May 21, 2026 | ||
12h) HST SITE PLAN Drawing 2026 02 17.pdf | May 21, 2026 | ||
12c) HST_Civil Drawings_part 2 of 3 2026 02 17.pdf | May 21, 2026 | ||
12b) HST_Civil Drawings_part 1 of 3 2026 02 17.pdf | May 21, 2026 | ||
1) HST Streetscape Perimeter Construction- Solicitation- Final 2026 05 20.pdf | May 21, 2026 | ||
2) SF1442 2026 05 21.pdf | May 21, 2026 | ||
11a) Res 104 Exhibit A 2026 04 22.pdf | May 21, 2026 | ||
7) DC20260001 V4 Wage Determination 2026 05 18.pdf | May 21, 2026 |
Harry S Truman Streetscape Perimeter Construction Project
Contact and place of performance
Molly Lewis
Washington, DC 20520
USA
The General Services Administration (GSA), Public Buildings Service (PBS) New England Region, Acquisition Management Division intends to hire a construction contractor to implement and enhance security and esthetics for the area around the Harry S Truman (HST) Streetscape Construction building located in Washington DC. The project originated in response to the events of 9/11 where high-profile government buildings we...
View more11 June 2026: HST Streetscape Perimeter Construction Project- Pre-Proposal Conference Meeting Minutes & Site Visit Sign-In Sheet
The General Services Administration (GSA), Public Buildings Service (PBS) New England Region, Acquisition Management Division, is seeking a construction contractor for the Harry S Truman Streetscape Perimeter Construction Project under solicitation number 47PB5126R0024. This major renovation project in Washington, DC, involves replacing temporary security measures with permanent, tested countermeasures to secure the building and protect employees and visitors. The scope of work includes enhancing the aesthetics and accessibility of the surrounding area to create an improved pedestrian environment.
The project requires civil and site construction for approximately 162,000 square feet of streetscape, encompassing sidewalks, utilities, and curb and gutter work. This construction is scheduled for completion in four phases. The requirement is classified under PSC Z2LB: REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS, and the set-aside metadata indicates NONE; explanation: NONE.
Responses are due by July 22, 2026. Molly Lewis is the designated point of contact for this solicitation. The procurement documentation includes 35 attachments, such as the construction agreement, pricing bid forms, a model subcontracting plan, and meeting minutes and sign-in sheets from the pre-proposal conference and site visit.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.