Medicine Bow/Routt National Forests and Thunder Basin National Grassland - Road Maintenance IDIQ
Contact and place of performance
Lonnie D Root
LARAMIE, WY 82070
USA
1. Pre-Bid Meeting Questions and Answers 2. Revision 1 Statement of Work - Deletes Requirement for Bid Bonds 3. Crosswalk Outlining Changes from 2016 to 2019 IDIQ Requirements 4. Outline of changes from 2016 to 2019 Scope of Contract Medicine Bow/Routt National Forests and Thunder Basin National Grassland's Road Maintenance IDIQ Contract is located within the boundary of the Medicine Bow/Routt National Forests and Th...
View moreThe U.S. Forest Service, via the White River National Forest office, is issuing solicitation 1282D719R0007 for the Medicine Bow/Routt National Forests and Thunder Basin National Grassland Road Maintenance IDIQ. This requirement is classified under NAICS 237310 Highway, Street, and Bridge Construction and PSC code F, with a set-aside designation of SBA (SBA). The government intends to award multiple firm-fixed-price indefinite delivery/indefinite quantity contracts to support various emergency responses and light construction needs within the designated forest and grassland boundaries. The anticipated period of performance for the resulting contracts is May 20, 2019, through May 20, 2024, with a response deadline of May 3, 2019, for work located in Laramie, Wyoming.
The scope of work encompasses road construction, re-construction, maintenance, and decommissioning, as well as emergency repairs necessitated by landslides, flooding, and fire. Specific tasks include vegetative clearing, culvert installation and repair, erosion control, sign and barrier installation, and the haul and placement of aggregate material. Contractors are required to provide all heavy equipment, manpower, and operating supplies necessary to fulfill these requirements. Individual task orders will be competed among awardees and evaluated using a lowest price technically acceptable determination.
Projected milestones for this procurement include an award date of May 17, 2019. The solicitation documentation includes four attachments: a question-and-answer document, a revised statement of work that removes bid bond requirements, a requirements crosswalk, and a pre-bid meeting presentation. Lonnie D. Root serves as the primary point of contact, with Ryan Nupen designated as the technical contact for this notice.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.