Name | Type | Posted | Actions |
|---|---|---|---|
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=FA480326R0004¬iceType=CombinedSynopsisSolicitation | LINK | Apr 24, 2026 | |
https://dodprocurementtoolbox.com/ | LINK | Apr 24, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 24, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 24, 2026 |
Hangar Door Repairs B1200, B1511 and B1614
Contact and place of performance
Darrel Ford
29152
This requirement is for a construction contract to restore and modernize hangar door systems at Buildings 1200, 1511, and 1614. The Governments objective is to ensure these hangar doors are safe, reliable, and fully functional in support of flightline and installation operations. The Contractor shall be responsible for planning, designing, constructing, and managing all activities necessary to achieve the objectives...
View moreThe Department of the Air Force, specifically the 20th Contracting Squadron (FA4803 20 CONS LGCA), has issued a combined synopsis/solicitation under number FA480326R0004 for the restoration and modernization of hangar door systems at Buildings 1200, 1511, and 1614. This construction project is classified under NAICS code 238290, Other Building Equipment Contractors, and PSC Z1BZ, Maintenance of Other Airfield Structures. The opportunity is designated as an SBA Small Business Administration set-aside. The government’s objective is to ensure hangar doors are safe, reliable, and functional to support flightline and installation operations, with the contractor responsible for planning, designing, and managing all activities over a period of performance lasting 295 calendar days after the issuance of the Notice to Proceed.
The estimated magnitude of this requirement is valued between $1,000,000 and $5,000,000. Administrative milestones include a mandatory site visit on May 13, 2026, at Shaw AFB, SC, requiring base access requests by May 5, 2026. All technical questions regarding the solicitation must be submitted by May 20, 2026, to the point of contact, Darrel Ford. Final electronic proposals are due no later than June 30, 2026, at 10:00 A.M. local time. Supporting documentation includes one PDF attachment posted on April 24, 2026, with additional solicitation materials available through the Procurement Integrated Enterprise Environment (PIEE).
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.