Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Mar 5, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 5, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 5, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912BV26QA018¬iceType=CombinedSynopsisSolicitation | LINK | Mar 5, 2026 |
Keystone and Webbers Dam Powerhouse - Excitation System Maintenance Service
Contact and place of performance
Tyler Hastings
Not specified
Keystone Dam and Webbers Falls Dam Powerhouse - Alstom Excitation System Maintenance Service. Contractor shall supply equipment, materials and labor as require performing inspection, diagnostics, and corrective maintenance on a quantity of two excitation systems designated U1 at the Keystone Dam hydroelectric power plant and U2 at the Webbers Falls Dam hydroelectric power plant. The contractor shall correct known excitation system problems and report problems revealed through diagnostics with proposed corrective maintenance to the government.
The U.S. Army Corps of Engineers, Tulsa District, has issued solicitation W912BV26QA018 for Alstom excitation system maintenance services at the Keystone Dam and Webbers Falls Dam powerhouse facilities. The selected contractor is responsible for supplying all equipment, materials, and labor required to perform comprehensive inspections, diagnostics, and corrective maintenance on two specific excitation systems, designated as U1 at Keystone Dam and U2 at Webbers Falls Dam. The scope includes resolving known system issues and identifying further problems through diagnostics to propose necessary corrective actions to the government.
This requirement is classified under NAICS code 335312 for Motor and Generator Manufacturing and PSC 6105 for Motors, Electrical. The procurement is designated as an SBA set-aside. One PDF attachment was included with the initial publication on March 5, 2026.
The response deadline for this combined synopsis/solicitation is May 26, 2026. All inquiries and submissions are managed by Tyler Hastings. The project involves performance at the hydroelectric power plants located at Keystone and Webbers Falls Dams.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.