Name | Type | Posted | Actions |
|---|---|---|---|
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 7, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Mar 7, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 7, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912BV25R0008 | LINK | Mar 7, 2025 |
WD Mayo Alignment Cell
Contact and place of performance
Tyler Hastings
Not specified
This is a Design-Build Request for Proposal (RFP) to design and construct a replacement guide wall extension cell at the W.D. Mayo Lock and Dam 14 which is part of the McClellan-Kerr Arkansas River Navigation System (MKARNS).
The Department of the Army, W076 ENDIST TULSA, has issued solicitation W912BV25R0008 for a design-build project at the W.D. Mayo Lock and Dam 14. This requirement involves the design and construction of a replacement guide wall extension cell, which is an integral component of the McClellan-Kerr Arkansas River Navigation System (MKARNS).
This procurement is designated as an SBA (SBA) set-aside. The project is classified under NAICS code 237990 for Other Heavy and Civil Engineering Construction and PSC Y1KB for CONSTRUCTION OF CANALS.
The response deadline for this solicitation is October 13, 2025. Tyler Hastings is the point of contact for the notice, which was initially published on March 7, 2025, and last updated on October 7, 2025. The notice currently lists zero attachments.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.