Name | Type | Posted | Actions |
|---|---|---|---|
Contractor Staging Area.png | PNG | May 14, 2024 | |
SPONSON Electrical and Coolant Connections.pdf | May 14, 2024 | ||
V7 Contractor Questions.xlsx | XLSX | May 14, 2024 | |
Site Visit Signature Page.pdf | May 14, 2024 | ||
AMD03 ISO209-24.pdf | May 14, 2024 | ||
AMD02 ISO209-24.pdf | Apr 30, 2024 | ||
AMD01 ISO209-24.pdf | Apr 16, 2024 | ||
ISO209-24.pdf | Apr 3, 2024 | ||
Attachment 8 CDRLs Table.pdf | Apr 3, 2024 | ||
Attachment 7_Applicable Documents.pdf | Apr 3, 2024 | ||
Attachment 6_Acronym Table (1).pdf | Apr 3, 2024 | ||
Attachment 6_Acronym Table (2).pdf | Apr 3, 2024 | ||
Attachment 3 EDM-D-00018r-_SPONSON HVAC ASSEMBLY.pdf | Apr 3, 2024 | ||
Attachment 1-MIL-STD-2042-6C(SH) Fiber Optic Testing Standards.pdf | Apr 3, 2024 |
UTILITIES HOOK-UP SPONSON UNITS
Contact and place of performance
Kimberly Schwinn
Crane, IN
USA
In order to receive a copy of the RFP package you must be Joint Certification Program (JCP) active. Please request the RFP package through www.sam.gov Request for the RFP must be made by April 25, 2024, at 1:00 PM EST. The solicitation is 100% set aside for Joint CertificationProgram (JCP) Small Business. The North American IndustrialClassification System (NAICS) Code applicable to this project is236220, commercial a...
View moreThe Federal Prison System, specifically the Bureau of Prisons CO Business Office, has issued solicitation ISO209-24 for the final utility hook-ups for four new mobile Sponson units and auxiliary equipment in Crane, Indiana. This requirement is classified under NAICS 236220 for Commercial and Institutional Building Construction and PSC Y1JZ for Construction of Miscellaneous Buildings. The project is 100% set aside for Small Business (SBA) and requires active Joint Certification Program (JCP) status to receive the solicitation package.
The project scope encompasses a turnkey design and construction effort for the connection of power, chilled water, compressed air, and data to the four mobile units. These Sponson units will be delivered and placed at the performance site prior to the execution of the contract. The contractor is responsible for providing stamped and certified drawing submissions at 50%, 95%, and 100% design milestones. All efforts related to the design, construction, and utility connection of the units are included in this requirement.
This combined synopsis/solicitation was published on April 3, 2024, with a final response deadline of May 23, 2024. Fourteen attachments are associated with the notice, including site visit documentation, electrical and coolant connection diagrams, contractor staging area maps, and various amendments. Kimberly Schwinn serves as the primary point of contact for this procurement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.