Name | Type | Posted | Actions |
|---|---|---|---|
Amendment 0002-W5168W-24-R-0009-FtCarson-18JUN2024.pdf | Jun 18, 2024 | ||
Attachment T - W5168W-24-R-0009-Past Performance Questionnaire-FTCARSON-18JUNE2024.pdf | Jun 18, 2024 | ||
Section L -W5168W-24-R-0009-FtCarson18JUNE2024.pdf | Jun 18, 2024 | ||
Amendment 0002-W5168W-24-R-0009-FtCarsonQandA-17JUNE2024.xlsx | XLSX | Jun 17, 2024 | |
W5168W-24-R-0009-GFP List-29MAY2024.pdf | May 29, 2024 | ||
QandA Responses-24MAY2024-W5168W-24-R-0009.xlsx | XLSX | May 24, 2024 | |
TE-J.1.2.2.2 Traffic Paint Usage Report.xlsx | XLSX | May 24, 2024 | |
TE-G.2.1 Historical Snowfall-Updated.xlsx | XLSX | May 24, 2024 | |
TE-J.2.2.1.1 UPS-Locations-Updated.xlsx | XLSX | May 24, 2024 | |
AMENDMENT 0001-FT CARSON W5168W-24-R-0009-24MAY2024.pdf | May 24, 2024 | ||
TE-H.2.11B PCMS and Ft Carson Sewer Manhole Graphic.pdf | May 24, 2024 | ||
TE-H.17.7.1 Environmental Battle Book.pdf | May 24, 2024 | ||
TE-H.17.2 Installation Storm Water Management Plan.pdf | May 24, 2024 | ||
TE-H.2.0B PM Tasks.xlsx | XLSX | May 24, 2024 | |
TE-H.1.3.3 IMCOM Facility Maint Instruction.pdf | May 24, 2024 | ||
Annex H to OPORD 18-011 Facility Maint Vertical-Attachment G.pdf | May 24, 2024 | ||
Attachment M-CBA-W5168W-24-R-0009-10APR2024.pdf | May 24, 2024 | ||
TE-H.1.1.1 Real Property Facilities.pdf | May 24, 2024 | ||
TE-H.2.13.9.2 EMCS Inventory.xlsx | XLSX | May 24, 2024 | |
Annex A-Performance Work Statement (PWS)-W5168W-24-R-0009-24MAY2024.pdf | May 24, 2024 | ||
TE-H.2.15.1 Dampness and Mold Visual Assessment Worksheet.pdf | May 24, 2024 | ||
TE-H.17.7.2 Water Contamination Response Plan.pdf | May 24, 2024 | ||
Attachment U-W5168W-24-R-0009-WAGEDETERMINATION-29APR2024-FTCARSON.pdf | May 24, 2024 | ||
TE-H.2.10.9 Oil Water Separator Locations.pdf | May 24, 2024 | ||
Annex J to OPORD 18-011 Facility Maint Horizontal-Attachment H-18APR2024.pdf | May 24, 2024 | ||
Annex G to OPORD 18-011 Pavement Clearance-18APR2024 - Copy.pdf | May 24, 2024 | ||
TE-H.2.13.9.2A Accreditation Efforts.pptx | PPTX | May 24, 2024 | |
TE-H.2.13.1.6- Individual Boiler Sys.xls | XLS | May 24, 2024 | |
Section L -W5168W-24-R-0009-FtCarson-24MAY2024.pdf | May 24, 2024 | ||
Annex K to OPORD 18-011 Heating and Cooling-18APR2024.pdf | May 24, 2024 | ||
TE-H.2.0A-Excluded Real Property.pdf | May 24, 2024 | ||
TE-H.2.23A Playground Checklist.pdf | May 24, 2024 | ||
TE-H.1.1 Historical Locations.pdf | May 24, 2024 | ||
TE-H.2.20.1 LPS and GP test locations.pdf | May 24, 2024 | ||
Attachment T-Past Performance Questionnaire-W5168W-24-R-0009-FTCARSON-9APR2024.pdf | May 24, 2024 | ||
TE-J.2.2.4.2 Lift Station PM Checklist.pdf | May 24, 2024 | ||
TE-H.2.11.3 IWTF Checklists.xlsx | XLSX | May 24, 2024 | |
TE-H.2.13.6.5 Chiller Plant Op Log.pdf | May 24, 2024 | ||
TE-A.7.3 Consolidated Technical Exhibit Index-17APR2024.pdf | May 24, 2024 | ||
TE-H.2.10.5 Backflow Prevention Devices.xlsx | XLSX | May 24, 2024 | |
TE-H.2.3B Indv Boiler Systems.xls | XLS | May 24, 2024 | |
TE-H.2.3.1.1A Exhaust Fan Locations.xlsx | XLSX | May 24, 2024 | |
TE-H.2.10.8.1 CVWF Description.pdf | May 24, 2024 | ||
Section M-W5168W-24-R-0009-FtCarson 23APR2024.pdf | May 24, 2024 | ||
TE-H.2.15.2 Post Remediation Verification Letter.pdf | May 24, 2024 | ||
TE-H.2.13.4A HVAC-COILS.xls | XLS | May 24, 2024 | |
TE-H.2.13.1.5 Boiler Operating Hours.xls | XLS | May 24, 2024 | |
TE-H.2.13.4 HVAC Filters.xls | XLS | May 24, 2024 | |
Annex F to OPORD 18-011 Grounds Maint-FtCarson-8MAY2024.pdf | May 24, 2024 | ||
TE-A.7.4.A Government Furnished Property (GFP) (Equipment) 1.xlsx | XLSX | May 24, 2024 | |
TE-H.2.26 Hot Tubs and Swimming Pools Equipment.pdf | May 24, 2024 | ||
TE-H.2.22 Fire Systems.xlsx | XLSX | May 24, 2024 | |
TE-H.2.11.3A STP Checklists.xlsx | XLSX | May 24, 2024 | |
TE-H.2.13.3 Chiller Wtr Chem.xls | XLS | May 24, 2024 | |
TE-H.2.13.1.5A Boiler Operating Log.xls | XLS | May 24, 2024 | |
TE-H.2.10.3 Sump_Lift Station Locations.pdf | May 24, 2024 | ||
TE-H.2.13.1 List of Equip in Heat Plants.pdf | May 24, 2024 | ||
TE-H.2.13.5 Food Service Equipment Location.xlsx | XLSX | May 24, 2024 | |
TE-H.2.11A STP Description.pdf | May 24, 2024 | ||
TE-H.5.1 Inventory of Solar PV.pdf | May 24, 2024 | ||
TE-H.2.13.6 Major Oper Equip Cool Plant.pdf | May 24, 2024 | ||
TE-H.2.19 Auxilary Generator.xlsx | XLSX | May 24, 2024 | |
TE-H.2.10.8 Wash Rack Facilities.xlsx | XLSX | May 24, 2024 | |
TE-H.2.24 Barracks.xls | XLS | May 24, 2024 | |
TE-H.2.10.6 Grease Trap Locations.xlsx | XLSX | May 24, 2024 | |
TE-H.2.13.4.1 Evaporative Coolers.xls | XLS | May 24, 2024 | |
TE-H.2.13.4.2 Air Dryers.xlsx | XLSX | May 24, 2024 | |
TE-H.13 Propane Tank Locations.xlsx | XLSX | May 24, 2024 | |
TE-H.2.11C Manhole Cardinal Directions.xlsx | XLSX | May 24, 2024 | |
TE-H.2.14 List of Facilities for Winterization and De-Winterization (Mothballed).xlsx | XLSX | May 24, 2024 | |
TE-H.1.1.1A Non Real Property.xlsx | XLSX | May 24, 2024 | |
TE-H.2.18.1 Emergency signs and lights.xlsx | XLSX | May 24, 2024 | |
TE-H.2.11 Septic System Locations.xlsx | XLSX | May 24, 2024 | |
TE-H.2.3 Furnances-Unit Heaters.xls | XLS | May 24, 2024 | |
TE-H.2.28 Food Service Equipment Location.xlsx | XLSX | May 24, 2024 | |
TE-H.2.30.1 Overhead Cranes.xlsx | XLSX | May 24, 2024 | |
TE-H.2.13.9.1 EMCS Facilities.xlsx | XLSX | May 24, 2024 | |
TE-H.2.25 List of Facilities with Elevators.xlsx | XLSX | May 24, 2024 | |
TE-H.2.23 Playground locations.xlsx | XLSX | May 24, 2024 | |
TE-H.2.22B Fire Pump Data.xlsx | XLSX | May 24, 2024 | |
TE-H.27 Fire Pumps.xlsx | XLSX | May 24, 2024 | |
TE-H.9.5 Airfield Lighting.pdf | May 24, 2024 | ||
TE-H.25 Sand Pipes and Yard Hydrant Locations.xlsx | XLSX | May 24, 2024 | |
TE-H.2.27b Vault Doors.xlsx | XLSX | May 24, 2024 | |
TE-H.2.9 Compressors.xls | XLS | May 24, 2024 | |
TE-H.2.24A Washers-Dryers.xlsx | XLSX | May 24, 2024 | |
TE-H.21.1 AST_UST Locations.xlsx | XLSX | May 24, 2024 | |
TE-H.2.29.1.1 DFAC Installed Building Equipment Data.xlsx | XLSX | May 24, 2024 | |
TE-H.2.22A Clean Agent System.xlsx | XLSX | May 24, 2024 | |
TE-H.2.13.7 Kitchen Hoods.xlsx | XLSX | May 24, 2024 | |
TE-H.2.29.1.7 Kitchen_Grill Hoods.xlsx | XLSX | May 24, 2024 | |
TE-H.9.1 Traffic Lights.xlsx | XLSX | May 24, 2024 | |
TE-H.4.2.2 Self Help Iinventory.xlsx | XLSX | May 24, 2024 | |
TE-H.2.27 Master Best Lock and Key count.xlsx | XLSX | May 24, 2024 | |
TE-H.2.3A AC-Units.xls | XLS | May 24, 2024 | |
TE-H.2.7 Overhead Doors.xlsx | XLSX | May 24, 2024 | |
TE-H.9.0 Privatized Street Lights.xlsx | XLSX | May 24, 2024 | |
TE-H.2.3.1.1 Radon Detection Units.xlsx | XLSX | May 24, 2024 | |
TE-H.2.3.1.4 High Occupancy and Crit Facilities.xlsx | XLSX | May 24, 2024 | |
TE-H.9.0A High Mast Lighting Assets.xlsx | XLSX | May 24, 2024 | |
TE-H.2.6 Automatic Doors-Fence Openers.xlsx | XLSX | May 24, 2024 | |
TE-H.2.4 Eyewash Station Locations.xlsx | XLSX | May 24, 2024 | |
Add-In Text for-Executive Order 14055 Clause-Add in PD2.pdf | May 24, 2024 | ||
Attachment J-FtCarson Pricing Matrix-W5168W-24-R-0009-24MAY2024.xlsx | XLSX | May 24, 2024 | |
W5168W-24-R-0009 Attachment List-FtCarson-24MAY2024.xlsx | XLSX | May 24, 2024 | |
Attachment J-FtCarson Pricing Matrix-W5168W-24-R-0009-20MAR2024-Final.xlsx | XLSX | Mar 22, 2024 | |
W5168W-24-R-0009-Ft Carson Solicitation - 21MAR2024.pdf | Mar 22, 2024 | ||
Attachment U-W5168W-24-R-0009-WAGEDETERMINATION-08DEC2023-FTCARSON.pdf | Mar 22, 2024 | ||
Attachment Q-W5168W-24-R-0009-DAVISBACON-RESIDENTIAL-08DEC2023-FTCARSON.pdf | Mar 22, 2024 | ||
Attachment O-W5168W-24-R-0009-DAVISBACON-BUILDING-08DEC2023-FTCARSON.pdf | Mar 22, 2024 | ||
Attachment P-W5168W-24-R-0009-DAVISBACON-HIGHWAY-08DEC2023-FTCARSON.pdf | Mar 22, 2024 | ||
Attachment D- Annex L to OPORD 18-011 Wastewater Services.pdf | Mar 22, 2024 | ||
Attachment V- Annex K to OPORD 18-011 Heating and Cooling.pdf | Mar 22, 2024 | ||
Attachment T - W5168W-24-R-0009-Past Performance Questionnaire-FTCARSON.pdf | Mar 22, 2024 | ||
Attachment T3 - Specific Relevant Contracts Reference Sheet-W5168W-24-R-0009-FTCARSON.pdf | Mar 22, 2024 | ||
Attachment K - W5168W-24-R-Staffing Matrix-FTCARSON.xlsx | XLSX | Mar 22, 2024 | |
Attachment M-CBA-W5168W-24-R-0009.pdf | Mar 22, 2024 | ||
Attachment W - CROSS REFERENCE MATRIX-W5168W-24-R-0009.xlsx | XLSX | Mar 22, 2024 | |
Attachment T2 -Consent Form for Release of Past Performance Information- W5168W-24-R-0009.pdf | Mar 22, 2024 | ||
Annex H to OPORD 18-011 Facility Maint Vertical-15MAR2024.pdf | Mar 22, 2024 | ||
TE-J.2.1.8.8 Fort Carson Rail Graphic.pdf | Mar 22, 2024 | ||
TE-J.2.1.3 Downrange Routes.pdf | Mar 22, 2024 | ||
TE-J.2.1.4 Tank Trails.pdf | Mar 22, 2024 | ||
TE-J.2.1.2.1 Cross walk locations.pdf | Mar 22, 2024 | ||
TE-J.2.1.2.1 School Crosswalk Locations.pdf | Mar 22, 2024 | ||
TE-J.2.2.3 Fort Carson Water Distribution System.pdf | Mar 22, 2024 | ||
TE-J.2.1.6 Retention Ponds and Dams.pdf | Mar 22, 2024 | ||
TE-J.2.2.4.1 Range 145 Sewer.pdf | Mar 22, 2024 | ||
TE-J.2.2.4.1a Turkey Creek Sewer.pdf | Mar 22, 2024 | ||
TE-J.2.2.4.1d Range 143 Sewer.pdf | Mar 22, 2024 | ||
TE-J.2.2.3c Red Devil Water Distribution.pdf | Mar 22, 2024 | ||
TE-J.2.2.4.1c Range 111 Sewer Maps.pdf | Mar 22, 2024 | ||
TE-J.2.2.3b Olympic Shooting Complex Water Distribution.pdf | Mar 22, 2024 | ||
TE-J.2.2.4.1b Range 109 Sewer.pdf | Mar 22, 2024 | ||
TE-J.2.2.3a PCMS Water Distribution System.pdf | Mar 22, 2024 | ||
TE-J.2.2.4.1e PCMS Sewer.pdf | Mar 22, 2024 | ||
TE-J.2.1.5 Bridge Locations.pdf | Mar 22, 2024 | ||
TE-J.2.1.4.1 Running Trails.pdf | Mar 22, 2024 | ||
TE-J.2.1.7.4 BAAF Paint Diagram.pdf | Mar 22, 2024 | ||
TE-J.2.1.3.1 FCCO Firebreaks.pdf | Mar 22, 2024 | ||
TE-J.2.1.8A PCMS Rail.pdf | Mar 22, 2024 | ||
TE-J.2.1.7 Butts AAF.pdf | Mar 22, 2024 | ||
TE-J.1.2.2 IGSA Responsibilities.pdf | Mar 22, 2024 | ||
TE-J.2.2 Rail Insp Checklist.pdf | Mar 22, 2024 | ||
TE-J.2.1.8 Fort Carson Rail.pdf | Mar 22, 2024 | ||
TE-J.2.2.1.3a Traffic Controller PM inspection and checklist.pdf | Mar 22, 2024 | ||
TE-J.2.2.1.1 UPS-Locations.xlsx | XLSX | Mar 22, 2024 | |
TE-J.2.2.1.3 Traffic Control Cabinets.pdf | Mar 22, 2024 | ||
Attachment G-Annex H to OPORD 18-011 Facility Maint Vertical.pdf | Mar 22, 2024 | ||
TE-H.2.24 Washers-Dryers.xlsx | XLSX | Mar 22, 2024 | |
TE-G.2.5.1 FODPP.pptx | PPTX | Mar 22, 2024 | |
TE-G.1.1 Snow Removal Map.pdf | Mar 22, 2024 | ||
TE-G.1.2 Installation Snow Removal Plan.pdf | Mar 22, 2024 | ||
Attachment F-Annex G to OPORD 18-011 Pavement Clearance.pdf | Mar 22, 2024 | ||
Annex G DPW BASOPS.pdf | Mar 22, 2024 | ||
TE-G.1.3 After Action Review.pdf | Mar 22, 2024 | ||
TE-G.2.1.2.3 Known Dumpster Locations.xls | XLS | Mar 22, 2024 | |
TE-G.2.1 Historical Snowfall.xlsx | XLSX | Mar 22, 2024 | |
TE-G.2.1A Snow Clearance Priority Facilities.xlsx | XLSX | Mar 22, 2024 | |
TE-F.2.2.1C Down Range Mowing Maps.pdf | Mar 22, 2024 | ||
TE-F.2.2.1D PCMS Range Mowing.pdf | Mar 22, 2024 | ||
TE-F.2.2.1_TE-F.2.2.1A Fort Carson Mowing_Weeds.pdf | Mar 22, 2024 | ||
TE-F.2.2.11 Fort Carson Irrigation.pdf | Mar 22, 2024 | ||
TE-F.2.2.1B BAAF_Mowing 1 JAN 2020.PDF | Mar 22, 2024 | ||
TE-F.2.2.11A PCMS Irrigation.pdf | Mar 22, 2024 | ||
Attachment E-Annex F to OPORD 18-011 Grounds Maint.pdf | Mar 22, 2024 | ||
Annex F PWD DPW BASOPS.pdf | Mar 22, 2024 | ||
Annex F to OPORD 18-011 Grounds Maint.pdf | Mar 22, 2024 | ||
TE-F.2.2.9.5 Tree Report.pdf | Mar 22, 2024 | ||
TE-F.2.2.6 Flower Beds.xlsx | XLSX | Mar 22, 2024 | |
Annex L to OPORD 18-011 Wastewater Services.pdf | Mar 22, 2024 | ||
TE-L.1.2 Sanitary Sewer Manhole Locations.pdf | Mar 22, 2024 | ||
TE-K.3.1 Fuel Ordering Process.pptx | PPTX | Mar 22, 2024 | |
Annex K to OPORD 18-011 Heating and Cooling.pdf | Mar 22, 2024 | ||
TE-K.4.2.1 Monthly Chiller Log.xls | XLS | Mar 22, 2024 | |
TE-A.2.4.1 Integrated Cultural Resources Management Plan (ICRMP).pdf | Mar 22, 2024 | ||
TE-A.2.1.3B PCMS Installation Map.PDF | Mar 22, 2024 | ||
TE-A.2.1.3C Carson Cantonment Map.pdf | Mar 22, 2024 | ||
TE-A.2F 2023 Workload Data (DMO-30JAN2024.xlsx | XLSX | Mar 22, 2024 | |
TE-A.2C 2020 Workload Data (DMO)-30JAN2024.xlsx | XLSX | Mar 22, 2024 | |
TE-A.2D-1 2021 Workload Data (PM)-30JAN2024.xlsx | XLSX | Mar 22, 2024 | |
TE-A.2E-1 2022 Workload Data (PM)-30JAN2024.xlsx | XLSX | Mar 22, 2024 | |
TE-A.2D 2021 Workload Data (DMO)-30JAN2024.xlsx | XLSX | Mar 22, 2024 | |
TE-A.2E 2022 Workload Data (DMO)-30JAN2024.xlsx | XLSX | Mar 22, 2024 | |
TE-A.2.1.3A Fort Carson Installation Map.pdf | Mar 22, 2024 | ||
TE-A.2F-1 2023 Workload Data (PM)-30JAN2024.xlsx | XLSX | Mar 22, 2024 | |
TE-A.2C-1 2020 Workload Data (PM)-30JAN2024.xlsx | XLSX | Mar 22, 2024 | |
TE-A.2B 2019 Workload Data.xlsx | XLSX | Mar 22, 2024 | |
TE-A.2A 2018 Workload Data.xlsx | XLSX | Mar 22, 2024 | |
TE-A.2.2.4 Historical PM Task Listing.xlsx | XLSX | Mar 22, 2024 | |
Attachment A- Annex A-Performance Work Statement (PWS)-W5168W-24-R-0009-Fort Carson-18MAR2024.pdf | Mar 22, 2024 | ||
TE-A.2.1.3D ADACG and Bldg 20000.pdf | Mar 22, 2024 | ||
TE-A.7.4.A Government Furnished Property (GFP) (Equipment)-18MAR2024.xlsx | XLSX | Mar 22, 2024 | |
TE-A.7.3 Consolidated Technical Exhibit Index-15MAR2024.pdf | Mar 22, 2024 | ||
TE-A.2.5.4.1 Employee Certifications and Licensing.pdf | Mar 22, 2024 | ||
TE-A.6.0 Consolidated Deliverable Index.xlsx | XLSX | Mar 22, 2024 | |
TE-A.6.1 Consolidated Contractor Plans.xlsx | XLSX | Mar 22, 2024 | |
TE-A.7.4 Government Furnished Property (Facilities).pdf | Mar 22, 2024 | ||
TE-A.2.1.10 Subcontract Report.xlsx | XLSX | Mar 22, 2024 |
Ft Carson BASOPS (Base Operations Services)
Contact and place of performance
Melanie Palmas
Colorado Springs, CO
USA
The Mission and Installation Contracting Command-Installation Readiness Center on behalf of the Mission and Installation Contracting Command-Fort Carson, is issuing a solicitation for a contractor to provide Base Operations Support Services at the U.S. Army Fort Carson, CO.Description of Services:The Contractor shall provide all personnel, equipment, supplies, tools, materials, supervision, and other items and non-pe...
View more503 Wastewater Services
Update as of 11 MAY 2026: The Government is working through Source Selection processes. Please continue to monitor Sam.gov for further updates.
__________________________________________________
Update as of APR 2026: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates.
____________________________________________________
Update as of MAR 2026: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates.
_______________________________________________________
Update as of 26 FEB 2026: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates.
________________________________________________________
Update as of 22 JAN 2026: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates.
_________________________________________________________
Update as of 2 DEC 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates.
__________________________________________________________
Update as of 15 SEP 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates.
_________________________________________________________
Update as of AUG 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates.
_________________________________________________________
Update as of 10 JUL 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates.
__________________________________________________________
Update as of 18 JUN 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates.
___________________________________________________________
Update as of 7 APR 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates.
___________________________________________________________
Update as of 6 MAR 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates.
___________________________________________________________
Update as of 31 JAN 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates.
___________________________________________________________
Update as of 17 JAN 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates.
___________________________________________________________
Update as of 31 DEC 2024: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates.
___________________________________________________________
Update as of 26 NOV 2024: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates.
___________________________________________________________
Update as of 5 Nov 2024: The Source Selection Evaluation Board is still in progress.
_______________________________________________________________
Update as of 5 Aug 2024: The Government is reviewing proposals and conducting Preaward Debriefs.
_______________________________________________________________
Update 17 June 2024: Amendment 0002 is attached along with responses to questions submitted by industry, updated attachments, and updates to Section L.
________________________________________________________________
Update 24 MAY 2024: Amendment 0001 is attached along with responses to questions submitted by industry, updated technical exhibits, and attachments.
_________________________________________________________________
Update 23 May 2024: The Government continues to work through the questions submitted by industry. The current proposal due date of 28 May 2024 will be extended via solicitation amendment along with answers to the questions submitted. This solicitation amendment will be posted on or about 28 May 2024. Details regarding the extension to the proposal submission date will be specified in the solicitation amendment when posted to sam.gov. Currently the Government is projecting the solicition due date as being 28 June 2024.
_______________________________________________________________
Update 15 May 2024: The Government continues to work through the questions submitted by industry. The current proposal due date of 28 May 2024 will be extended via solicitation amendment along with answers to the questions submitted. This solicitation amendment will be posted on or about 20 May 2024. Details regarding the extension to the proposal submission date will be specified in the solicitation amendment when posted to sam.gov.
The Department of the Army, through the Mission and Installation Contracting Command-Fort Houston and the Mission and Installation Contracting Command-Fort Carson, is soliciting base operations support services at Fort Carson in Colorado Springs, Colorado. Identified under solicitation number W5168W-24-R-0009, this requirement is designated as a HUBZone (HZC) set-aside. The primary classification for this effort is NAICS 561210: Facilities Support Services, with PSC M1AZ: Operation of Other Administrative Facilities and Service Buildings. While the response deadline was June 28, 2024, the government has continued source selection evaluation processes as of May 11, 2026.
The contractor is responsible for providing all personnel, equipment, supplies, tools, materials, and supervision required to perform non-personal maintenance and repair services. The scope of work covers facilities, structures, buildings, and utilities classified as real property, as well as Army Training and Evaluation Center non-real properties and installed building equipment defined by Army Regulation 420-1. Specific Common Level of Services (CLS) include grounds maintenance, pavement clearance, vertical and horizontal facility maintenance, heating and cooling services, and wastewater services. The solicitation includes 199 attachments, such as multiple amendments, past performance questionnaires, and government-furnished property lists. Melanie Palmas is the primary point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.