Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Jun 3, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Jun 3, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Jun 3, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9123626BA016¬iceType=SolicitationNotice | LINK | Jun 3, 2026 |
Rudee Inlet Maintenance Dredging
Contact and place of performance
George Jackson
23450
The U.S. Army Corps of Engineers (USACE), Norfolk District, intends to issue a solicitation for a firm-fixed-price construction contract for maintenance dredging of the Rudee Inlet Federal Navigation Channel located in Virginia Beach, Virginia. The solicitation will be issued in accordance with FAR Part 14, Sealed Bidding. The applicable North American Industry Classification System (NAICS) code is 237990 - Other Hea...
View moreThe U.S. Army Corps of Engineers, Norfolk District, is soliciting bids for a firm-fixed-price construction contract for maintenance dredging of the Rudee Inlet Federal Navigation Channel in Virginia Beach, Virginia. Identified under solicitation number W9123626BA016, this unrestricted acquisition is classified under NAICS 237990 Other Heavy and Civil Engineering Construction and PSC Z1KF MAINTENANCE OF DREDGING FACILITIES. The project has an estimated construction magnitude between $1,000,000 and $5,000,000 and will be conducted through sealed bidding procedures. Responses for this opportunity are due by July 6, 2026, to the primary point of contact, George Jackson.
The scope of work involves dredging approximately 220,000 cubic yards of sandy maintenance material from the Rudee Entrance Channel, Sand Trap, Entrance Channel Transition Area, North Jetty Area, South Jetty Area, and the Outer Deposition Basin. Contractors must have the technical capability to hydraulically pump material up to 1.25 miles. While most material is designated for placement on Resort Beach, the contract includes optional work to place approximately 50,000 cubic yards from the Deposition Basin onto Croatan Beach. Operations will occur in an open ocean environment in the Atlantic Ocean, where the contractor must account for high recreational boating traffic and significant public presence during beach placement activities.
The anticipated period of performance is 180 calendar days, which must be scheduled within the window between Labor Day 2026 and Memorial Day 2027. Work is required to commence within 10 calendar days after the contractor receives the Notice to Proceed. Specific logistical constraints prohibit the use of Lake Wesley as a staging or safe harbor location, though the use of Croatan Point Dock facilities or the designated Safety Area of the Federal Project is permitted. One PDF attachment was included with the notice published on June 3, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.