Name | Type | Posted | Actions |
|---|---|---|---|
Veranda Ext Arch Struct Detail Bldg 101_Amend 0001.pdf | Jul 24, 2024 | ||
Statement of Work Construction Veranda Receptacles 07 23 2024_amend 0001.pdf | Jul 24, 2024 | ||
1333ND24RNB190010 _Amend 001.pdf | Jul 24, 2024 | ||
NIST Response to RFIs_Amend 0001 .pdf | Jul 24, 2024 | ||
Site Visit 1333ND24RNB190010_KTR attendance.pdf | Jul 24, 2024 | ||
Original Power Library Bldg 101_Amend 0001.pdf | Jul 24, 2024 | ||
Circuit Routing Along Granite Base_Amend 0001.pdf | Jul 24, 2024 | ||
Panelboard Pictures_Amend 0001.pdf | Jul 24, 2024 | ||
Statement of Work Construction Veranda Receptacles.pdf | Jul 5, 2024 | ||
Attachment 2- Project Data Sheet.pdf | Jun 28, 2024 | ||
Guidelines for Contractors and A-E firms - May 25 2022.pdf | Jun 28, 2024 | ||
NIST S 7101-67_Fall Protection_09072021a.pdf | Jun 28, 2024 | ||
NIST S 7101-74_Powered Industrial Trucks_10292021.pdf | Jun 28, 2024 | ||
NIST O 7401-00_Fire and Life Safety Order_051721.pdf | Jun 28, 2024 | ||
NIST S 7101-58_Respiratory Protection_01072021.pdf | Jun 28, 2024 | ||
NIST 7101-65_Machines Power Tools Associated Equipment Safety_040419a.pdf | Jun 28, 2024 | ||
NIST S 7101-24_Incident Reporting and Investigation_01042021.pdf | Jun 28, 2024 | ||
NIST S 7101-55_Hearing Protection_01072021.pdf | Jun 28, 2024 | ||
NIST S 7101-66_Ladder Safety_090523.pdf | Jun 28, 2024 | ||
NIST S 7401-04_Fire Prevention During Welding Cutting and Other Hot Work_01122021.pdf | Jun 28, 2024 | ||
NIST S 7401-01_Fire Protection Life Safety for Design and Construction _01122021.pdf | Jun 28, 2024 | ||
NIST S 7101-20_Work and Worker Authorization Based on Hazard Reviews_12172020.pdf | Jun 28, 2024 | ||
NIST S 7401-02_ITM of Fire Protection and Life Safety Systems_042221.pdf | Jun 28, 2024 | ||
NIST S 7101-57_Permit-Required Confined Space_01072021.pdf | Jun 28, 2024 | ||
final_pr_2103_06 Utility Outages.pdf | Jun 28, 2024 | ||
List of Attachments.pdf | Jun 28, 2024 | ||
NIST S 7101-56_Control of Hazardous Energy_LOTO_01072021.pdf | Jun 28, 2024 | ||
Attachment 3 - Past Performance Questionnaire.pdf | Jun 28, 2024 | ||
WD_MD20240053.pdf | Jun 28, 2024 | ||
NIST P 7400.00 - Fire and Life Safety_021017.pdf | Jun 28, 2024 | ||
FINAL---NIST S 7101-21_Personal Protective Equipment_062023.pdf | Jun 28, 2024 | ||
NIST N 7101-64_Electrical Safety Notice_102615 (5).pdf | Jun 28, 2024 | ||
REVISED---NIST S 7401-03_Impairment of Fire Protection and Life Safety Systems_020622a.pdf | Jun 28, 2024 | ||
FormSF1442_solicitation.pdf | Jun 28, 2024 | ||
Attachment 1- Key Personnel Resume Form.pdf | Jun 28, 2024 |
Electrical Construction
Contact and place of performance
Tamela Lewis
Gaithersburg, MD 20899
USA
The National Institute of Standards of Technology (NIST) Office of Facilities and Property Management (OFPM) intends to award an Indefinite Delivery Indefinite Quantity (IDIQ) task order contract(s) for Electrical Construction. The Period of performance shall be a five-year ordering period. All work and services will be ordered by issuance of individual firm-fixed priced task orders. The IDIQ contract is estimated to...
View moreThe National Institute of Standards and Technology (NIST) Office of Facilities and Property Management (OFPM) is soliciting electrical construction services under solicitation number 1333ND24RNB190010. This requirement will be fulfilled via an Indefinite Delivery Indefinite Quantity (IDIQ) contract consisting of individual firm-fixed priced task orders. The contract features a five-year ordering period with a total ceiling of $9,000,000 and a guaranteed minimum of $4,000. This acquisition is a 100% set-aside for Small Business (SBA) firms.
The project is classified under NAICS 238210, Electrical Contractors and Other Wiring Installation Contractors, and PSC N059, INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS. All work will be performed at the NIST campus in Gaithersburg, Maryland. While metadata initially indicated a July 25 deadline, Amendment 0001 extended the proposal submission deadline to July 31, 2024, at 1:00 p.m. EST. Proposals must be submitted electronically via email to Tamela Lewis and Richard Stevens.
There are 35 attachments associated with this solicitation, including structural details for Building 101, a revised Statement of Work for veranda receptacles, and a list of attendees from the site visit conducted on July 9, 2024. Proposals must be complete and self-sufficient, responding directly to the requirements set forth in the solicitation. The government will evaluate proposals based on the instructions provided to ensure a timely and equitable award process.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.