Name | Type | Posted | Actions |
|---|---|---|---|
Solicitation - W912QR25QA069.pdf | Sep 5, 2025 | ||
Combined Photos for Solicitation.pdf | Sep 5, 2025 | ||
Reps and Certs.pdf | Sep 5, 2025 | ||
Wage Determinations.pdf | Sep 5, 2025 | ||
PBS.pdf | Sep 5, 2025 | ||
ProjNet Instructions.pdf | Sep 5, 2025 | ||
Drawings.pdf | Sep 5, 2025 | ||
Scope of Work.pdf | Sep 5, 2025 | ||
Special Instructions.pdf | Sep 5, 2025 | ||
PIEE Directions.pdf | Sep 5, 2025 | ||
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Sep 5, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Sep 5, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Sep 5, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912QR25QA069¬iceType=SolicitationNotice | LINK | Sep 5, 2025 |
Rough River Hydraulic System Components Replacement
Contact and place of performance
LaDonna Haug
Falls of Rough, KY
USA
PROJECT TITLE: HYDRAULIC SYSTEM COMPONENTS REPLACEMENT
PROJECT LOCATION: ROUGH RIVER LAKE
THIS IS A FIRM FIXED PRICE, 100% SET-ASIDE FOR SMALL BUSINESS.NAICS 237990 - OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION, SIZE STANDARD $45 MILLION.FAR 36.204 DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECT IS BETWEEN $100,000 AND $250,000.
***NOTE: THE CONTRACTOR WILL BE REQUIRED TO SIGN AWARD PRIOR TO THE CONTRACTING OFFICER SIGNING***
The Department of the Army, Louisville District, is soliciting a firm-fixed-price contract for the replacement of hydraulic system components at Rough River Lake in Falls of Rough, Kentucky. This requirement, identified under solicitation number W912QR25QA069, is a 100% small business set-aside. The project is classified under NAICS code 237990, Other Heavy and Civil Engineering Construction, and PSC Z1KA, Maintenance of Dams. The estimated magnitude of this construction project is between $100,000 and $250,000.
The deadline for responses to this solicitation is September 17, 2025. The contracting point of contact is LaDonna Haug, and the notice includes 10 attachments, such as the primary solicitation document, project photos, wage determinations, and ProjNet instructions. Upon selection, the contractor will be required to sign the award prior to the signature of the contracting officer.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.